mybdasites.com Weekly Digest
Dear sojo,
Here is the latest digest of messages posted on mybdasites.com forums. Please come and join the discussion!
Table of contents
Jump to | Private Message Subject | Sender | Date |
---|---|---|---|
You have no new or unread private messages. |
Jump to | Forum | Topic | Author | Date |
---|---|---|---|---|
17248 | General | BCCHS Layout, Raghuvanahalli, Kanakapura Road | adroit | 26 Oct 2012, 13:55 |
17337 | General | BCCHS Layout, Raghuvanahalli, Kanakapura Road | adroit | 31 Oct 2012, 13:08 |
17330 | General | plot number missing in the site | Prashanthhs | 31 Oct 2012, 08:37 |
17277 | General | Wall Cracks | amit_pearl2 | 28 Oct 2012, 22:07 |
17295 | General | Wall Cracks | MNRS | 29 Oct 2012, 14:59 |
17297 | General | Wall Cracks | amit_pearl2 | 29 Oct 2012, 16:12 |
17274 | General | SRR Wimbledon - Yelhanka | ascii11 | 28 Oct 2012, 17:51 |
17278 | General | SRR Wimbledon - Yelhanka | axe | 28 Oct 2012, 23:57 |
17286 | General | SRR Wimbledon - Yelhanka | axe | 29 Oct 2012, 10:31 |
17271 | General | Land Price at Rajajinagar | Mukund | 28 Oct 2012, 11:48 |
17256 | General | BDA Khata and BBMP Khata. Which one is best? | ravindrabpl | 26 Oct 2012, 20:34 |
17260 | General | BDA Khata and BBMP Khata. Which one is best? | MNRS | 27 Oct 2012, 22:13 |
17266 | General | BDA Khata and BBMP Khata. Which one is best? | mramki_77 | 28 Oct 2012, 08:39 |
17267 | General | BDA Khata and BBMP Khata. Which one is best? | godisgood | 28 Oct 2012, 10:38 |
17250 | General | Leaning Apartment at Electronic city | xsnallagkr | 26 Oct 2012, 14:07 |
17215 | General | What is special power of attorney? | plothunter | 25 Oct 2012, 11:39 |
17221 | General | What is special power of attorney? | msn1270 | 25 Oct 2012, 14:10 |
17223 | General | What is special power of attorney? | plothunter | 25 Oct 2012, 14:21 |
17225 | General | What is special power of attorney? | msn1270 | 25 Oct 2012, 14:27 |
17226 | General | What is special power of attorney? | plothunter | 25 Oct 2012, 14:28 |
17237 | General | What is special power of attorney? | tvsh | 25 Oct 2012, 21:43 |
17240 | General | What is special power of attorney? | nagsbhat | 26 Oct 2012, 01:46 |
17241 | General | What is special power of attorney? | plothunter | 26 Oct 2012, 08:09 |
17228 | General | One more Housing Society ordered to return 165 Acres | janaki ram kota | 25 Oct 2012, 15:43 |
17230 | General | One more Housing Society ordered to return 165 Acres | adroit | 25 Oct 2012, 15:55 |
17195 | General | Plot in North | zodiac | 24 Oct 2012, 16:28 |
17196 | General | Plot in North | zodiac | 24 Oct 2012, 16:35 |
17194 | General | Information regarding Winfield garden hegade nagara | zodiac | 24 Oct 2012, 16:20 |
17318 | Vishveshwariah | Metro line via Kengeri-Nagarabhavi ringroad - yashavanthpur | bgowda | 30 Oct 2012, 16:43 |
17319 | Vishveshwariah | Metro line via Kengeri-Nagarabhavi ringroad - yashavanthpur | msn1270 | 30 Oct 2012, 17:03 |
17328 | Vishveshwariah | Metro line via Kengeri-Nagarabhavi ringroad - yashavanthpur | chandregowda | 31 Oct 2012, 00:28 |
17203 | Anjanapura - BDA | Searching for a BDA 30X40 in 9th,10,11th block | raoanand | 24 Oct 2012, 23:14 |
17207 | Anjanapura - BDA | Searching for a BDA 30X40 in 9th,10,11th block | m3_07 | 25 Oct 2012, 09:50 |
17298 | Anjanapura - BDA | Searching for a BDA 30X40 in 9th,10,11th block | gowda_sree | 29 Oct 2012, 17:16 |
17283 | Anjanapura - BDA | GUIDELINE VALUE OR GOVERNEMENT VALUE | paraasakthi | 29 Oct 2012, 09:48 |
17292 | Anjanapura - BDA | GUIDELINE VALUE OR GOVERNEMENT VALUE | msn1270 | 29 Oct 2012, 14:37 |
17199 | BSK IV to VI BDA | BSK 6thStage 3rd Block | lonedesi | 24 Oct 2012, 18:05 |
17201 | BSK IV to VI BDA | BSK 6thStage 3rd Block | PlotGuy | 24 Oct 2012, 18:35 |
17206 | BSK IV to VI BDA | BSK 6thStage 3rd Block | prathpj | 25 Oct 2012, 09:47 |
17281 | Jp nagar | Cauvery Water in JP Nagar 9th Phase , 2nd Block | rreddy18 | 29 Oct 2012, 08:31 |
17282 | Jp nagar | Cauvery Water in JP Nagar 9th Phase , 2nd Block | sun | 29 Oct 2012, 08:50 |
17305 | Jp nagar | Cauvery Water in JP Nagar 9th Phase , 2nd Block | rreddy18 | 29 Oct 2012, 20:01 |
17254 | Rate Table | Gottigere - South Avenue and Royal County etc | ByJupiter | 26 Oct 2012, 18:28 |
17255 | Rate Table | Gottigere - South Avenue and Royal County etc | yashmys | 26 Oct 2012, 19:48 |
17259 | Rate Table | Gottigere - South Avenue and Royal County etc | prakashbask | 27 Oct 2012, 10:12 |
17261 | Rate Table | Gottigere - South Avenue and Royal County etc | adroit | 27 Oct 2012, 23:30 |
17264 | Rate Table | Gottigere - South Avenue and Royal County etc | ByJupiter | 28 Oct 2012, 02:00 |
17265 | Rate Table | Gottigere - South Avenue and Royal County etc | ByJupiter | 28 Oct 2012, 02:29 |
17268 | Rate Table | Gottigere - South Avenue and Royal County etc | adroit | 28 Oct 2012, 10:50 |
17272 | Rate Table | Gottigere - South Avenue and Royal County etc | prakashbask | 28 Oct 2012, 13:56 |
17279 | Rate Table | Gottigere - South Avenue and Royal County etc | adroit | 29 Oct 2012, 01:00 |
17288 | Rate Table | Gottigere - South Avenue and Royal County etc | nagarjunkatta | 29 Oct 2012, 11:36 |
17216 | Rate Table | price at Nobel residency/Thejaswini nagara | sureshkellemane | 25 Oct 2012, 12:30 |
17233 | Rate Table | price at Nobel residency/Thejaswini nagara | uma.pemma | 25 Oct 2012, 18:46 |
17235 | Rate Table | price at Nobel residency/Thejaswini nagara | ardesarchitects | 25 Oct 2012, 20:09 |
17316 | Bangalore South | Black money in buying property | Hsenaj | 30 Oct 2012, 15:00 |
17321 | Bangalore South | Black money in buying property | msn1270 | 30 Oct 2012, 17:23 |
17262 | Apartments | review about aristo palms in ananth nagar electronic city | binost | 27 Oct 2012, 23:34 |
17263 | Apartments | review about aristo palms in ananth nagar electronic city | binost | 27 Oct 2012, 23:35 |
17289 | Apartments | review about aristo palms in ananth nagar electronic city | binost | 29 Oct 2012, 12:47 |
17309 | Apartments | review about aristo palms in ananth nagar electronic city | krish | 30 Oct 2012, 00:41 |
17290 | Apartments | Review about Dreamz Infra, Bangalore | binost | 29 Oct 2012, 12:50 |
17291 | Apartments | Review about Dreamz Infra, Bangalore | sk1976 | 29 Oct 2012, 13:41 |
17202 | Apartments | Siddheshwara Nagara Layout, Kulmepalaya Village | eswarao_k | 24 Oct 2012, 20:13 |
17336 | Civil Construction | Kitchen ware | Dreamhome | 31 Oct 2012, 13:06 |
17335 | Civil Construction | Veneer or Laminate for wardrobe/Kitchen Cabinate | Dreamhome | 31 Oct 2012, 13:03 |
17327 | Civil Construction | Suppliers of Steel Doors and Aluminium Windows | arti1977 | 30 Oct 2012, 23:36 |
17311 | Civil Construction | Electrical fittings ( fans , lights, geasers) | jackalbda | 30 Oct 2012, 09:39 |
17314 | Civil Construction | Electrical fittings ( fans , lights, geasers) | akula | 30 Oct 2012, 11:11 |
17315 | Civil Construction | Electrical fittings ( fans , lights, geasers) | arjun.surendra04 | 30 Oct 2012, 11:18 |
17325 | Civil Construction | Electrical fittings ( fans , lights, geasers) | tamya | 30 Oct 2012, 20:52 |
17306 | Civil Construction | UPVC WINDOW options | rreddy18 | 29 Oct 2012, 20:31 |
17312 | Civil Construction | UPVC WINDOW options | JollyRogers | 30 Oct 2012, 10:24 |
17323 | Civil Construction | UPVC WINDOW options | pradeepecr | 30 Oct 2012, 18:17 |
17210 | Civil Construction | Electrical connection for Solar power | monagaadu | 25 Oct 2012, 09:54 |
17234 | Civil Construction | Electrical connection for Solar power | blrsiteseeker | 25 Oct 2012, 19:03 |
17293 | Civil Construction | Electrical connection for Solar power | msn1270 | 29 Oct 2012, 14:58 |
17299 | Civil Construction | Electrical connection for Solar power | pradeepecr | 29 Oct 2012, 17:19 |
17307 | Civil Construction | Electrical connection for Solar power | monagaadu | 29 Oct 2012, 21:58 |
17308 | Civil Construction | Electrical connection for Solar power | nagsbhat | 29 Oct 2012, 23:59 |
17322 | Civil Construction | Electrical connection for Solar power | msn1270 | 30 Oct 2012, 17:53 |
17214 | Civil Construction | AAC Blocks | aries31 | 25 Oct 2012, 11:27 |
17317 | Civil Construction | AAC Blocks | danovi | 30 Oct 2012, 16:19 |
17301 | Civil Construction | help on Labour Contract, Payment Schedule & Material buy | arti1977 | 29 Oct 2012, 18:57 |
17304 | Civil Construction | help on Labour Contract, Payment Schedule & Material buy | kayjayaar | 29 Oct 2012, 19:29 |
17276 | Civil Construction | Steps I did, to get my building plan approval | anand1980 | 28 Oct 2012, 20:21 |
17287 | Civil Construction | Steps I did, to get my building plan approval | jackalbda | 29 Oct 2012, 10:34 |
17294 | Civil Construction | Steps I did, to get my building plan approval | anand1980 | 29 Oct 2012, 14:58 |
17212 | Civil Construction | selecting teakwood log | m3_07 | 25 Oct 2012, 10:04 |
17236 | Civil Construction | selecting teakwood log | ddn | 25 Oct 2012, 21:24 |
17273 | Civil Construction | selecting teakwood log | dev13 | 28 Oct 2012, 16:19 |
17245 | Civil Construction | Doors and Windows | amarbs | 26 Oct 2012, 11:43 |
17238 | Civil Construction | Required Labour Contractor | kayjayaar | 25 Oct 2012, 21:45 |
17227 | Civil Construction | Costing analysis- FRP door vs Flush Door - guidance needed | amarbs | 25 Oct 2012, 14:48 |
17218 | Civil Construction | Borewell rate - Please help | vrsbabu | 25 Oct 2012, 12:39 |
17320 | Interiors | Bathtub | Vimal | 30 Oct 2012, 17:13 |
17334 | Interiors | Bathtub | saisuraksha | 31 Oct 2012, 12:28 |
17338 | Interiors | Bathtub | Dreamhome | 31 Oct 2012, 13:10 |
17222 | Interiors | Modular Kitchen | vrsbabu | 25 Oct 2012, 14:20 |
17303 | Interiors | Modular Kitchen | blrsiteseeker | 29 Oct 2012, 19:13 |
17302 | Interiors | Wardrobe / Closet Design | blrsiteseeker | 29 Oct 2012, 19:03 |
17249 | Interiors | Need inputs for False ceiling and POP | xsnallagkr | 26 Oct 2012, 13:56 |
17252 | Interiors | Need inputs for False ceiling and POP | ardesarchitects | 26 Oct 2012, 16:35 |
17300 | Interiors | Need inputs for False ceiling and POP | pradeepecr | 29 Oct 2012, 17:21 |
17211 | Interiors | home security solution vendor | dev13 | 25 Oct 2012, 09:54 |
17205 | Interiors | Centralized Vaccum cleaning systesm | venkyn | 25 Oct 2012, 05:05 |
17213 | Material prices -- Members only | Construction material prices | maheshvivid2003 | 25 Oct 2012, 10:42 |
17197 | Material prices -- Members only | borewell pump | sk1976 | 24 Oct 2012, 16:59 |
17209 | Material prices -- Members only | borewell pump | monagaadu | 25 Oct 2012, 09:52 |
17198 | Documents | Actual measurement of BDA plots | msn1270 | 24 Oct 2012, 17:38 |
17200 | Documents | Actual measurement of BDA plots | PlotGuy | 24 Oct 2012, 18:33 |
17208 | Documents | Actual measurement of BDA plots | m3_07 | 25 Oct 2012, 09:52 |
17242 | Documents | Actual measurement of BDA plots | msn1270 | 26 Oct 2012, 09:49 |
17243 | Documents | Actual measurement of BDA plots | yashmys | 26 Oct 2012, 10:38 |
17246 | Documents | Actual measurement of BDA plots | msn1270 | 26 Oct 2012, 12:14 |
17247 | Documents | Actual measurement of BDA plots | m3_07 | 26 Oct 2012, 13:31 |
17257 | Documents | Actual measurement of BDA plots | nagsbhat | 27 Oct 2012, 02:37 |
17326 | Documents | Actual measurement of BDA plots | Prashanthhs | 30 Oct 2012, 22:26 |
17332 | Documents | Actual measurement of BDA plots | msn1270 | 31 Oct 2012, 10:04 |
17284 | Documents | Need urgent information regarding Khatha transfer | raghuhb | 29 Oct 2012, 10:22 |
17310 | Documents | Need urgent information regarding Khatha transfer | krish | 30 Oct 2012, 00:47 |
17232 | Documents | A khata for Layout but not for Individual sites | binost | 25 Oct 2012, 16:18 |
17239 | Documents | A khata for Layout but not for Individual sites | hkrish | 25 Oct 2012, 23:39 |
17251 | Documents | A khata for Layout but not for Individual sites | nagarjunkatta | 26 Oct 2012, 15:38 |
17258 | Documents | A khata for Layout but not for Individual sites | krish | 27 Oct 2012, 10:05 |
17313 | Site for sale | BDA Site for Sale, 4th B Block, BSK 6th Stage | ganeshp1983 | 30 Oct 2012, 10:58 |
17285 | Site for sale | Sale 40x60 East facing site Bannerghatta road. Rs2000 psft | uma.pemma | 29 Oct 2012, 10:26 |
17324 | Site wanted | Site wanted near Manyata Tech Park | sp24 | 30 Oct 2012, 19:59 |
17296 | Site wanted | Looking for site in Upkar greenfields | pyaretaj | 29 Oct 2012, 15:57 |
17231 | Site wanted | Sites Around Hormau, TC Palya & Ramamurthy nagar | binost | 25 Oct 2012, 15:56 |
17217 | House for sale | High tension wire over residential house | nagarjunkatta | 25 Oct 2012, 12:39 |
17219 | House for sale | High tension wire over residential house | MNRS | 25 Oct 2012, 13:16 |
17220 | House for sale | High tension wire over residential house | adroit | 25 Oct 2012, 13:24 |
17270 | House for sale | High tension wire over residential house | saibabu | 28 Oct 2012, 11:45 |
17275 | House for sale | High tension wire over residential house | MNRS | 28 Oct 2012, 19:02 |
17329 | Rental Available | Independent 2 BHK@Supreme Residency-Nr Vijaya Bank colony | sun | 31 Oct 2012, 00:40 |
17331 | City info | Sri. Shettar to inaugurate cauvery iv stage phaseii | jackalbda | 31 Oct 2012, 09:28 |
17333 | City info | Sri. Shettar to inaugurate cauvery iv stage phaseii | yashmys | 31 Oct 2012, 11:10 |
17224 | Investment Longue | Apartment - Short Term Investment | ByJupiter | 25 Oct 2012, 14:26 |
17229 | Investment Longue | Apartment - Short Term Investment | zodiac | 25 Oct 2012, 15:49 |
17253 | Investment Longue | Apartment - Short Term Investment | ByJupiter | 26 Oct 2012, 18:12 |
Forum: General
Topic: BCCHS Layout, Raghuvanahalli, Kanakapura Road
Hi All,
I am looking for a site in this layout.
can you please let me know which survey numbers are in trouble so that I can cross verify with the owner.
thanks
Vamsee
I am looking for a site in this layout.
can you please let me know which survey numbers are in trouble so that I can cross verify with the owner.
thanks
Vamsee
Hello,
Any Inputs PLEASE ??
thanks and regards
Vamsee
Any Inputs PLEASE ??
thanks and regards
Vamsee
Topic: plot number missing in the site
Reply: plot number missing in the site
Hi All,
Me and my friend have finalized to buy two adjustment 20x60 plots and we have applied for bank loan. It is like a single 40X60 plot numbered 100 is split into two 20x60 sites with numbering 100/A and 100/B .
Now, the bank has stayed the loan processing for the site 100/B because this number is missing on the stone in the site. In the middle of the plot it is written 100, in the left side of the plot it is written 100/A, but 100/B is not seen anywhere.
But we have got the documents verified from lawyer and the documents appear clean. Schedule of 100/B has 100/A to its left and plot number 101 to its right.
How to go about this now? Is it enough to write 100/B ourselves as the owner is suggesting or should I approach BDA? I tried to access the http://ops.bdabangalore.org/bdaops/HOME.aspx to verify the presence of 100/B. But the bda website is down since yesterday.
Me and my friend have finalized to buy two adjustment 20x60 plots and we have applied for bank loan. It is like a single 40X60 plot numbered 100 is split into two 20x60 sites with numbering 100/A and 100/B .
Now, the bank has stayed the loan processing for the site 100/B because this number is missing on the stone in the site. In the middle of the plot it is written 100, in the left side of the plot it is written 100/A, but 100/B is not seen anywhere.
But we have got the documents verified from lawyer and the documents appear clean. Schedule of 100/B has 100/A to its left and plot number 101 to its right.
How to go about this now? Is it enough to write 100/B ourselves as the owner is suggesting or should I approach BDA? I tried to access the http://ops.bdabangalore.org/bdaops/HOME.aspx to verify the presence of 100/B. But the bda website is down since yesterday.
Topic: Wall Cracks
Reply: Wall Cracks
Hello All,
The walls of my falt have couple big cracks. They are more than hair line cracks. The cracks are around 5 feet in length and width could be .25 inch.
What is the permant way to fix these cracks. Painter says it is not possible to fix these cracks. Is this true? I see add of Mr or Dr fixit. Can they help?
Cant we fix them using cement and sand?
Looking for efficient solution and amount i may have to shell out.
Regards
Amit
The walls of my falt have couple big cracks. They are more than hair line cracks. The cracks are around 5 feet in length and width could be .25 inch.
What is the permant way to fix these cracks. Painter says it is not possible to fix these cracks. Is this true? I see add of Mr or Dr fixit. Can they help?
Cant we fix them using cement and sand?
Looking for efficient solution and amount i may have to shell out.
Regards
Amit
Cracks are on internal or external walls ?
Actually in our apartment, we have seen some cracks on the external walls. Some of us contacted an interior designers/constructions company and they widened the cracks and filled the same with some special chemical.
As per them, if you just use normal putty or cement filling, then it might not have joined to the old concrete mix and after some time it will come out. So they said they use some kid of special chemical mix to avoid that problems. Also I remember, they have given some warranty on that too.
Actually in our apartment, we have seen some cracks on the external walls. Some of us contacted an interior designers/constructions company and they widened the cracks and filled the same with some special chemical.
As per them, if you just use normal putty or cement filling, then it might not have joined to the old concrete mix and after some time it will come out. So they said they use some kid of special chemical mix to avoid that problems. Also I remember, they have given some warranty on that too.
MNRS, It is the internal walls that have cracks. Do you have any idea on how much they charge and any contacts.
There are some paste available like Dr Fixit. not sure if they are permanant fix for the problem
There are some paste available like Dr Fixit. not sure if they are permanant fix for the problem
Topic: SRR Wimbledon - Yelhanka
Hope..all might have got the registration information....
If not then ... pls wait anothr 3-6 months...there is lot of time left..
If not then ... pls wait anothr 3-6 months...there is lot of time left..
What information? Can u elaboate?
@harishrests:
Can you mention where the office is and whom to ask for this BDA approval letter?
October is coming to an end and can you mention what is the current status?
Can you mention where the office is and whom to ask for this BDA approval letter?
October is coming to an end and can you mention what is the current status?
Topic: Land Price at Rajajinagar
Dear
Price in this area may range from 12000 - 15000 Rs/Sft depending on location, residential/commercial, and other factors.
It would be difficult to find any selllers here because availabality is practically ZERO,
You may suggest what is that you are looking, it may help people to provide better info.
Regards
Mukund
Price in this area may range from 12000 - 15000 Rs/Sft depending on location, residential/commercial, and other factors.
It would be difficult to find any selllers here because availabality is practically ZERO,
You may suggest what is that you are looking, it may help people to provide better info.
Regards
Mukund
Topic: BDA Khata and BBMP Khata. Which one is best?
Hi ,
I have plot in BDA approved lay out. Could you please let me know how many floors can I construct ? Is it G+2 or G+1 ?
Thanks for your help
I have plot in BDA approved lay out. Could you please let me know how many floors can I construct ? Is it G+2 or G+1 ?
Thanks for your help
I think you can go upto G+2. You can check the BBMP or BDA bylaws for the same.
Number of floors depends on site dimension and also the dimension of the road opposite to your site. As mentioned, you can check the bda web site.
I could not find the number of floors allowed in this. Is there some other document for that?
http://www.scribd.com/doc/44439071/BBMP-Bye-Laws
http://www.scribd.com/doc/44439071/BBMP-Bye-Laws
Topic: Leaning Apartment at Electronic city
i think this is located in anand reddy layout ?
Topic: What is special power of attorney?
Reply: What is special power of attorney?
Friends,
My friend is buying a plot from a builder in Bangalore. As per the sale deed which he got it says builder has executed special power of attorney in favor of a person X who will represent him on the day of registration. As i know from other people buying property under general power of attorney is not good and may have legal problems. Is special power of attorney different from GPA? Is it ok to register through a person having special power of attorney? The bank which is funding the loan is ok with it but i was just curious as i am also looking to buy a plot in the near future.
Thanks
Narendra
My friend is buying a plot from a builder in Bangalore. As per the sale deed which he got it says builder has executed special power of attorney in favor of a person X who will represent him on the day of registration. As i know from other people buying property under general power of attorney is not good and may have legal problems. Is special power of attorney different from GPA? Is it ok to register through a person having special power of attorney? The bank which is funding the loan is ok with it but i was just curious as i am also looking to buy a plot in the near future.
Thanks
Narendra
Not much difference between GPA and SPA. GPA means giving blanket permission to a nominee for carrying out anything/everything on that piece of property and in SPA, its very specific to certain activities like selling/purchasing/renting....etc. Legally both holds similar values.
Remember as per supreme court order, Post October 2011, all Property transactions through third party GPA is illegal, unless the GPA holder is having blood relation to the actual owner like Brother/sister/father/mother/son/daughter within a family.
Remember as per supreme court order, Post October 2011, all Property transactions through third party GPA is illegal, unless the GPA holder is having blood relation to the actual owner like Brother/sister/father/mother/son/daughter within a family.
Thanks for your reply msn. So if the builder has given SPA to his lawyer who works in his company and this lawyer appears for registration on the day of registration on behalf of the builder it is not legal?
Also will the sub registrar office execute such registrations?
Also will the sub registrar office execute such registrations?
Sub-Registrar office do not validate anything. They just carry out their activity registering the property by collecting the registration + Stamp Duty and their fees. Its the 100% responsibility of the buyer to take necessary precautions before proceeding. Better consult a reliable advocate to get the detailed knowledge/implications post the SC order.
Thanks very much msn. Your replies are always helpful
In Certain cases, The Chairman/President/Owner of a company gets special permission from the sub-registrar and designates someone else to register the sites on his/her behalf. Ex: BDA, MUDA, Judicial layout, etc. If this did not happen, then the chairman of the BDA will have to spend all his days at the registrar office signing title deeds. I am not sure if the designation of someone else to represent the chairman happens via a special power of attorney. It is better to consult a lawer or better still get a copy of the Special power of Attorney and read the T and Cs.
As far as I am aware, BDA/Society should have already got exemption from Subregistrars from personal appearance. Then on the day of the registration, said society issues a letter (definitely not a GPA/SPA) indicating who will appear on behalf or No one is appearing. It is not a GPA/SPA.
Thanks for the replies. As you guys said the power of attorney(which is also already registered) is only to present the deed in front of the sub registrar and it will actually be signed by the owners. Is there some risk associated with such registration? In the meanwhile my friend is consulting an advocate and I will update his findings here.
Topic: One more Housing Society ordered to return 165 Acres
by chance would any body enlighten me as to what happened to the enqiry ordered by the state govt on all co operative house building socoeties recently in wake of the recent resignation by the then lokayuktha Justice Patil.
jrk
jrk
@Bengaluru boy
I was looking for a site in Bangalore City Co-Op Society Layout off kanakapura main road near vajarahalli.
.
Could you please let me know if this layout is having any legal issues fully or Partly and the Survey Numbers which are clear, so that I can check it out with the owner.
Thanks and Regards
Vamsee
I was looking for a site in Bangalore City Co-Op Society Layout off kanakapura main road near vajarahalli.
.
Could you please let me know if this layout is having any legal issues fully or Partly and the Survey Numbers which are clear, so that I can check it out with the owner.
Thanks and Regards
Vamsee
Topic: Plot in North
AFAIK both the MCEHCS and Central Excise layout near Hegade nagar are not approved by BDA yet. They are marked as Not-approved and unauthorized formation. It is possible they may get approved anytime, but it has been quite a number of years since they have come up. It is also possible that BDA might demolish all constructions at this site. So be wary of purchasing any sites here.
On the other hand, they look very promising but the prices are very high that too for an unapproved layout. I would say less than 2000 or even 1800 per sqft for this and definitely not 3000 or 3500 as they are being quoted.
On the other hand, they look very promising but the prices are very high that too for an unapproved layout. I would say less than 2000 or even 1800 per sqft for this and definitely not 3000 or 3500 as they are being quoted.
http://www.scribd.com/doc/62761903/DETAILS-OF-127-UNAUTHORISED-RESIDENTIAL-LAYOUTS-WITH-IN-BANGALORE-DEVELOPMENT
Look for page 24 of 32, Sl No. 95
Central Excise layout (marketed as Win field gardens, Winfield gardens, Winnfield gardens)
Society had applied for approved of layout plan to the Authroity . But without submitting the required documents formed the layout unauthorisedly . Notice was issued as per KTCP Act 1961 Section17(4).
Look for page 4 of 32, Sl no. 15
Ministry of Comunication HBCS (isnt this MCEHCS layout near Hegade nagar, Sriramapura ? )
Socitey has applied for approval of layout plan . But without getting approval of layout plan from BDA, formed the layout unauthorisedly. Byatarayanapura CMChad issued khatha & building licence.Authority sub-committee for unauthorisedlayout in its meeting held on 05-11-2005 had decided to demolish the unauthorised layout.
Look for page 24 of 32, Sl No. 95
Central Excise layout (marketed as Win field gardens, Winfield gardens, Winnfield gardens)
Society had applied for approved of layout plan to the Authroity . But without submitting the required documents formed the layout unauthorisedly . Notice was issued as per KTCP Act 1961 Section17(4).
Look for page 4 of 32, Sl no. 15
Ministry of Comunication HBCS (isnt this MCEHCS layout near Hegade nagar, Sriramapura ? )
Socitey has applied for approval of layout plan . But without getting approval of layout plan from BDA, formed the layout unauthorisedly. Byatarayanapura CMChad issued khatha & building licence.Authority sub-committee for unauthorisedlayout in its meeting held on 05-11-2005 had decided to demolish the unauthorised layout.
Topic: Information regarding Winfield garden hegade nagara
Hi,
I learnt that this layout is not approved by BDA yet. and the developer has been served notice on 17(a). ie why was the illegal layout developed and to restore it to the original state as it is an unauthorized construction/development.
I learnt that this layout is not approved by BDA yet. and the developer has been served notice on 17(a). ie why was the illegal layout developed and to restore it to the original state as it is an unauthorized construction/development.
Forum: Vishveshwariah
Topic: Metro line via Kengeri-Nagarabhavi ringroad - yashavanthpur
Reply: Metro line via Kengeri-Nagarabhavi ringroad - yashavanthpur
I heard recently that there is a metro line which is coming in the ring road which connects kengeri - Shirke Circle - Nagarabhavi ring road - Sumanahalli-Yeshvanthpur (Already there is an existing ring road).
I saw some Metro work going on in Mysore road to Kengeri. But I don't see any work happening at Nagarabhavi ring road.
I also heard that, this ring road will be widened and some buildings across these roads are demolished, amount has been already paid to building owners.
Does anybody has any update on this , if this is true, than Sir MV layout people will be more happy since this ring road is very near to Vishveshwariah layout
I saw some Metro work going on in Mysore road to Kengeri. But I don't see any work happening at Nagarabhavi ring road.
I also heard that, this ring road will be widened and some buildings across these roads are demolished, amount has been already paid to building owners.
Does anybody has any update on this , if this is true, than Sir MV layout people will be more happy since this ring road is very near to Vishveshwariah layout
its nothing, But height of speculation.
On this ORR stretch, we don't even have the Service Road, expecting metro.....!?
This stretch is nowhere mentioned in either Stage 1 which is expected to be operational by end of 2014 or stage 2(still in proposal and expected to be operational by 2018).
On this ORR stretch, we don't even have the Service Road, expecting metro.....!?
This stretch is nowhere mentioned in either Stage 1 which is expected to be operational by end of 2014 or stage 2(still in proposal and expected to be operational by 2018).
Pretty sure metro is not coming there in phase 2. LRT will be passing through the junction at Ambedkar College.
Link : http://www.deccanherald.com/content/285676/lrt-alignment-bypass-bangalore-varsity.html
Link : http://www.deccanherald.com/content/285676/lrt-alignment-bypass-bangalore-varsity.html
Forum: Anjanapura - BDA
Topic: Searching for a BDA 30X40 in 9th,10,11th block
Hi,
Is 60 facing the road with 20 as depth, I am interested in that case
Anand
Is 60 facing the road with 20 as depth, I am interested in that case
Anand
Ironically this is not the case.....it is the opposite !!raoanand wrote:Hi,
Is 60 facing the road with 20 as depth
Hi All 20X60 Owners,
This dimension is not ideal for house construction, BDA has given these kinds of sites to the people as aleternative sites for the loosers in SIR MV and BSK6th stage.
My opinion is, Two owners (A&B part owenrs) decide to sell together as 40*60 and devide the money later buy 30*40.
or
either any one among themselves has to purchase others one and then sell or utilise for own purpose. This way only 20*60 peple can come out from this loop. If they are planning to sell alone as 20*60, tere will be no buyers, if they get buyers wont be getting fair value.
Sree
This dimension is not ideal for house construction, BDA has given these kinds of sites to the people as aleternative sites for the loosers in SIR MV and BSK6th stage.
My opinion is, Two owners (A&B part owenrs) decide to sell together as 40*60 and devide the money later buy 30*40.
or
either any one among themselves has to purchase others one and then sell or utilise for own purpose. This way only 20*60 peple can come out from this loop. If they are planning to sell alone as 20*60, tere will be no buyers, if they get buyers wont be getting fair value.
Sree
Topic: GUIDELINE VALUE OR GOVERNEMENT VALUE
Reply: GUIDELINE VALUE OR GOVERNEMENT VALUE
WHAT IS THE GUIDELINE VALUE PER SFT AT ANJANAPURA BDA LAYOUT
Make your queries complete and meaningful to get better response.
Site: Rs. 1,100/sq.ft
Apartment: Rs. 1,590 - 1,720/sq.ft
Site: Rs. 1,100/sq.ft
Apartment: Rs. 1,590 - 1,720/sq.ft
Forum: BSK IV to VI BDA
Topic: BSK 6thStage 3rd Block
sasireddy, what facing side did you sell? Was it west or south? I am speaking to owner in 3rd block and he is quoting 4000 for west facing.
Prices in BSK 6th have gone up as have other prices. You can't get BDA plots for 4000 in any developed areas.
Not sure what is driving the rate. But bsk6 stage sites are in high demand. good friend of mine works in sub-registrar office told me that every week there will be 3-5 registration( many registered in price of 3500-4000/-). Another observation is that in private layout where there is no good roads, no chance of water connection and small layouts are quoting 3500-4000/sqft, may be because of this people are opting for bda sites where there is chance of water connection, good roads and big layout. Also last 12-18 months, site rates are increased in private layouts as well not only in bsk6 stage.
Forum: Jp nagar
Topic: Cauvery Water in JP Nagar 9th Phase , 2nd Block
Reply: Cauvery Water in JP Nagar 9th Phase , 2nd Block
Hi All ,
I heard in the papers BWSSB is giving Cauvery Water in many areas. Is JP Nagar 9th Phase , 2nd Block is covered in this. I am planning to start construction based on the water availability.
regards
Ravi
I heard in the papers BWSSB is giving Cauvery Water in many areas. Is JP Nagar 9th Phase , 2nd Block is covered in this. I am planning to start construction based on the water availability.
regards
Ravi
i read it too.. but i think you can not use BWSSB water for construction..you will have to make own arrangements.
My intention is not to use BWSSB water for construction , basically wanted to find when the cauvery water will be available in that area.
Forum: Rate Table
Topic: Gottigere - South Avenue and Royal County etc
Reply: Gottigere - South Avenue and Royal County etc
I wanted to know what is the current rate in these layouts and nearby Gottigere/JP Nagar 8th Phase/Jumbo Savari.
I feel that agents generally quote 500-1000/sft more than the actual rates based on my very limited interaction with few of them. There are more houses in South Avenue than Royal County but the rates are more in Royal County which I guess is because its a BDA approved layout. From what I've gathered, ~2200/sft seems the going rate in South Avenue. Does anyone have a good idea regarding this?
PS: All the plots I enquired about have A Khata.
I feel that agents generally quote 500-1000/sft more than the actual rates based on my very limited interaction with few of them. There are more houses in South Avenue than Royal County but the rates are more in Royal County which I guess is because its a BDA approved layout. From what I've gathered, ~2200/sft seems the going rate in South Avenue. Does anyone have a good idea regarding this?
PS: All the plots I enquired about have A Khata.
30*40 costs 48 lakhs in Royal County
Royal County rates are between 3500-4000 per sqft. Brokers might be quoting more than that. I can see quotes which are touching 4500 per sqft.
Hi Jupiter,
I had seen some plots for 2500 in South avenue. if u have seen plots at 2200, then that is good i think.
can you send me the information of the owner or the agent if u r not pursuing those plots.
thanks
Vamsee
I had seen some plots for 2500 in South avenue. if u have seen plots at 2200, then that is good i think.
can you send me the information of the owner or the agent if u r not pursuing those plots.
thanks
Vamsee
adroit
No one has quoted 2200 in South Avenue but I'm just guessing that might be the correct figure to bargain for. I've got the reference of a trustworthy agent. He said he'll let me know in a few days about what to quote there. I'll let you know if I decide not to go for the sites that I've come to know of.
Also, any idea what is the guidance value there?
No one has quoted 2200 in South Avenue but I'm just guessing that might be the correct figure to bargain for. I've got the reference of a trustworthy agent. He said he'll let me know in a few days about what to quote there. I'll let you know if I decide not to go for the sites that I've come to know of.
Also, any idea what is the guidance value there?
I believe the guidance value is available in this link http://www.karunadu.gov.in/karigr/Valuation/MARKET%20VALUE.rar
Its not in English so perhaps someone can check and post the rate here.
Its not in English so perhaps someone can check and post the rate here.
Jupiter,
I think gottigere should be 1100 to 1200. In fact any layout on B.G.road after meenakshi temple is around this rate.
USUALLY i HAVE SEEN IN BANGALORE market value will be minimum of 2.5 times the govt guidance value.
thanks
Vamsee
I think gottigere should be 1100 to 1200. In fact any layout on B.G.road after meenakshi temple is around this rate.
USUALLY i HAVE SEEN IN BANGALORE market value will be minimum of 2.5 times the govt guidance value.
thanks
Vamsee
@adroit, which layout on BG Road is 1100 per sqft?
I meant the govt guidance value and not the market value..
any layout after meenakshi temple should be around 1100 rs govt guidance value.
thanks
Vamsee
any layout after meenakshi temple should be around 1100 rs govt guidance value.
thanks
Vamsee
Hi,
for Incity Layout, the guidance value is 1000/sft. Because recently my friend registered a site.. This layout is after Meenakshi mall(2.5 km from it) in Dodda kammanahali.
Cheers
Arjun
for Incity Layout, the guidance value is 1000/sft. Because recently my friend registered a site.. This layout is after Meenakshi mall(2.5 km from it) in Dodda kammanahali.
Cheers
Arjun
Topic: price at Nobel residency/Thejaswini nagara
Reply: price at Nobel residency/Thejaswini nagara
Dear all,
Kindly help me to decide the price.
I am looking to buy a plot at Nobel residency in begur-koppa road (from Meenakshi mall around 3KM) and the quote I received is around 3200 psft. Is it good deal ?
Thank you very much for your help.
Kindly help me to decide the price.
I am looking to buy a plot at Nobel residency in begur-koppa road (from Meenakshi mall around 3KM) and the quote I received is around 3200 psft. Is it good deal ?
Thank you very much for your help.
For Nobel Residency it would be a little bit high. But has a good prospect to grow.
Hi,
3200/- sounds too high.i think the current rate should be around 2200- 2600/- max.I live right next to noble residency, its slowly picking up .The only issue is nearest public transport is 2 km away from layout .Its even hard to find a auto now.But there is good amount of traffic in the peak times of the day.Ideal location for guys working in electronic city side .Signal free drive of just 15 mins during peak hours
It would be good option to buy and wait for couple of years to construct .
Regards
Ar.Praveen.N
Ardes Architects and Interior Designers
ardesarchitects@gmail.com
www.ardesarchitects.com
____________________
we design you a home but not a house .............
3200/- sounds too high.i think the current rate should be around 2200- 2600/- max.I live right next to noble residency, its slowly picking up .The only issue is nearest public transport is 2 km away from layout .Its even hard to find a auto now.But there is good amount of traffic in the peak times of the day.Ideal location for guys working in electronic city side .Signal free drive of just 15 mins during peak hours
It would be good option to buy and wait for couple of years to construct .
Regards
Ar.Praveen.N
Ardes Architects and Interior Designers
ardesarchitects@gmail.com
www.ardesarchitects.com
____________________
we design you a home but not a house .............
Forum: Bangalore South
Topic: Black money in buying property
Reply: Black money in buying property
Hi All,
We are in the process of finalizing a property in a BDA approved layout in Doddakallasandra, Kanakapura Road. The seller asked us to pay the guidance/registration value in white (i.e 15 lakhs) and pay the remaining amount (35 lakhs) in black. All the money we have is hard earned white money in our bank accounts. I am concerned about withdrawing and traveling with large sums of cash from bank given the security risks involved. Also I heard that RBI/SEBI has a clause in prevention of money laundering act where any withdrawals crossing 10 lakhs in a month get reported as suspicious transactions.
We have paid an advance of Rs 10,000 to the seller, so it is difficult for us to drop this deal. Could you point out how to go about this deal in a safer manner? Thanks!!
Kind Regards,
Subrahmanya
We are in the process of finalizing a property in a BDA approved layout in Doddakallasandra, Kanakapura Road. The seller asked us to pay the guidance/registration value in white (i.e 15 lakhs) and pay the remaining amount (35 lakhs) in black. All the money we have is hard earned white money in our bank accounts. I am concerned about withdrawing and traveling with large sums of cash from bank given the security risks involved. Also I heard that RBI/SEBI has a clause in prevention of money laundering act where any withdrawals crossing 10 lakhs in a month get reported as suspicious transactions.
We have paid an advance of Rs 10,000 to the seller, so it is difficult for us to drop this deal. Could you point out how to go about this deal in a safer manner? Thanks!!
Kind Regards,
Subrahmanya
This kind of demand from the sellers are very common in real estate transactions. you have very limited options.
1) if you are a salary class person and undergoing TDS, There is no need to worry much about any clauses of RBI as your source of income is transparent and already declared.
2) If your preferred mode of payment is not in cash, ask him to take the balance amount in a separate Cheque or DD's(even in multiple names of his family members or trusted people, which can be en cashed from different accounts at his convenience).
3) if he is very particular about the Balance amount in cash and you are worried about the security risk, ask him to collect the same from you at the bank itself, either before the registration or after the registration. From there, it will be at his risk.
4) lastly You can draw your amount in installments and keep it in safe location( Bank locker) and hand over to him either at your home or at his home or in any other safe location of mutual convenience.
1) if you are a salary class person and undergoing TDS, There is no need to worry much about any clauses of RBI as your source of income is transparent and already declared.
2) If your preferred mode of payment is not in cash, ask him to take the balance amount in a separate Cheque or DD's(even in multiple names of his family members or trusted people, which can be en cashed from different accounts at his convenience).
3) if he is very particular about the Balance amount in cash and you are worried about the security risk, ask him to collect the same from you at the bank itself, either before the registration or after the registration. From there, it will be at his risk.
4) lastly You can draw your amount in installments and keep it in safe location( Bank locker) and hand over to him either at your home or at his home or in any other safe location of mutual convenience.
Forum: Apartments
Topic: review about aristo palms in ananth nagar electronic city
Reply: review about aristo palms in ananth nagar electronic city
I would like to get a review about aristo palms in ananth nagar electronic city. Their website looks very suspicious. Earlier their name was aakruti developers and they changed the name and website. Current name is akurti and the website is apcons.in . I have seen in some forums that they don't have BMRDA approval. But they claims they have it. Also they are quoting 32 lks for 2 BHK. Is it reasonable? I would like to get a review about this project and the developers immediately. Thanks in advance.
Also they don't have office address or phone number in their website.
They don't have BMRDA approval. So we cancelled the plan.
Thanks binost for keeping us updated with your findings. Appreciate that.
Topic: Review about Dreamz Infra, Bangalore
Fraud company.
There was a company called Orange Properties that also made promises like this one. Last i heard about Orange was when few of my colleagues have lost few lakhs that they had paid as initial deposit for some villa plots near KR puram. It seems too good to be true, it probably is(n't true) ??. Only time will tell!.
Topic: Siddheshwara Nagara Layout, Kulmepalaya Village
Reply: Siddheshwara Nagara Layout, Kulmepalaya Village
Hi,
Any one owns plot at Siddheshwara Nagara Layout ?. The layout is at Kulmepalaya Village after Amruth Nagar next to Anjanapura NICE Road Bridge.
Thanks,
Eswar
Any one owns plot at Siddheshwara Nagara Layout ?. The layout is at Kulmepalaya Village after Amruth Nagar next to Anjanapura NICE Road Bridge.
Thanks,
Eswar
Forum: Civil Construction
Topic: Kitchen ware
Reply: Kitchen ware
Hi,
Any looking for kitchen ware from brand like Hettich, please let me know. I came across a vendor who lends at better rate than any in bangalore. He provide discount till 30% on few and 20-25% on MRP for few items.
Tax can be avoided if you wish.
Thanks
Dreamhome
Any looking for kitchen ware from brand like Hettich, please let me know. I came across a vendor who lends at better rate than any in bangalore. He provide discount till 30% on few and 20-25% on MRP for few items.
Tax can be avoided if you wish.
Thanks
Dreamhome
Topic: Veneer or Laminate for wardrobe/Kitchen Cabinate
Reply: Veneer or Laminate for wardrobe/Kitchen Cabinate
Hi,
I need to your expert review whether to go for Veneer or laminate for wardrobe and kitchen cabinate.
I have heard:
Veneer:
Pros: looks great, long durable than laminate and soft edge
Cons: Needs maintainance, easily get scratches, stains can't be removed, cost more etc...
Laminate:
Pros: Scratches not look prominent as in Veneer, easily cleaned, low maintainance, low price compared to veneer
Cons: Not serve more than 5 years,sharp edge ginish etc...
Could suggest which to for?
Thanks and Regards,
Dreamhome
I need to your expert review whether to go for Veneer or laminate for wardrobe and kitchen cabinate.
I have heard:
Veneer:
Pros: looks great, long durable than laminate and soft edge
Cons: Needs maintainance, easily get scratches, stains can't be removed, cost more etc...
Laminate:
Pros: Scratches not look prominent as in Veneer, easily cleaned, low maintainance, low price compared to veneer
Cons: Not serve more than 5 years,sharp edge ginish etc...
Could suggest which to for?
Thanks and Regards,
Dreamhome
Topic: Suppliers of Steel Doors and Aluminium Windows
Reply: Suppliers of Steel Doors and Aluminium Windows
Hi,
I am planning to put steel entry doors, and Aluminium Windows for my house. Could you please share suppliers , good brands of these ? Ans also estimated cost for a standard Steel Door and Aluminium Window ?
I am planning to put steel entry doors, and Aluminium Windows for my house. Could you please share suppliers , good brands of these ? Ans also estimated cost for a standard Steel Door and Aluminium Window ?
Topic: Electrical fittings ( fans , lights, geasers)
Reply: Electrical fittings ( fans , lights, geasers)
Hello All,
I am about to buy the electrical fittings and have zeroed in on the below brands. Please let me know if they have any downsides or better choices are there.Do I need to bother about wattage of the Fans/Lights ? Do they make a significant difference in the Bescom bill ?
Fans:
--------------
Crompton Greaves ( 1200mm long 3 leaf fans). Model High Breeze( HB ) 1400 Details at http://www.lokeshelectricals.com/Consumer_Products/Fans/Non_Decorative_Fans.html
Lights
-------------
Mix of tubelights and CFLs both from Philips. Equivalent to a 40Watt yello bulb, what wattage should I choose in case of CFL ?
Geasers
------------
Racold
Solar Water Heater
----------
200 litre , Solarizer normal ( not tubular one).
I am about to buy the electrical fittings and have zeroed in on the below brands. Please let me know if they have any downsides or better choices are there.Do I need to bother about wattage of the Fans/Lights ? Do they make a significant difference in the Bescom bill ?
Fans:
--------------
Crompton Greaves ( 1200mm long 3 leaf fans). Model High Breeze( HB ) 1400 Details at http://www.lokeshelectricals.com/Consumer_Products/Fans/Non_Decorative_Fans.html
Lights
-------------
Mix of tubelights and CFLs both from Philips. Equivalent to a 40Watt yello bulb, what wattage should I choose in case of CFL ?
Geasers
------------
Racold
Solar Water Heater
----------
200 litre , Solarizer normal ( not tubular one).
I had checked tata bp, sundrop, solarizer solar water heaters. i knew a few people using solarizer and they did not have
any complaints since few years and also the price was competitive, so opted for it. just fyi, 200 litres solarizer normal
(flat plate) costed me Rs 28k. Had to spend some more money (rs 4k)for piping and other materials, labour to connect
it to the overhead tank. this additioanl cost depends on how far is your solar water heater from the overhead tank and
bathrooms.
any complaints since few years and also the price was competitive, so opted for it. just fyi, 200 litres solarizer normal
(flat plate) costed me Rs 28k. Had to spend some more money (rs 4k)for piping and other materials, labour to connect
it to the overhead tank. this additioanl cost depends on how far is your solar water heater from the overhead tank and
bathrooms.
Check out the power rating of each of the electrical devices. A 5 star rating is preferred and saves money.
For geaser
I brought Haier from avenue rd
Reasons
7 years warranty (Max among all products)
Competitive pricing (Lowest among all my inquiry)
Clean look of product
Good Specs
I brought Haier from avenue rd
Reasons
7 years warranty (Max among all products)
Competitive pricing (Lowest among all my inquiry)
Clean look of product
Good Specs
Topic: UPVC WINDOW options
Got my LG PVC Windows from Sutej Building Systems , 91-9945990438. Got a very good price.
Can you please provide the rates offered for the LG UPVC windows?
I'm having 6" wall. when fixing grill how much space I need to give for UPVC window. my mastry says fixing grill at external edges nearby in not good on safety perpective.
Let me know, anyone used 6" wall with grill, how much dimension you have fixed grill.
hi rreddy,
Pls share the price of the same.
Let me know, anyone used 6" wall with grill, how much dimension you have fixed grill.
hi rreddy,
Pls share the price of the same.
Topic: Electrical connection for Solar power
blrsiteseeker wrote:I will have to check the exact details for the costing. But my inverter (which is a hybrid - for both solar and KEB electricity) and batteries, Solar panels including installation etc. cost about rs. 68K approximately.
Hi blrsiteseeker, Whats the power output of your solar panels (0.5KW) ? Can you send the cost details. Thanks
I don't have the specs with me, I am away from home right now. Cost details, like I said, I don't have the break up, but total is rs. 68K.
Monagaadu
Answer for your query on Power output for a 0.5kW Panel lies in your Q itself.
alternately I can say, the voltage output of panels have multiple options like 12V/24V/48V DC.
Based on this rating and current rating your Battery and Inverter systems need to be selected.
3 months back I got a quote for a 12V DC output panel, Rs. 55 per watt (Negotiable) and you can go for total output power of the panel customized to your need like 130W, 240W, 500W. 1000W...etc. Prices are declining slowly.
Answer for your query on Power output for a 0.5kW Panel lies in your Q itself.
alternately I can say, the voltage output of panels have multiple options like 12V/24V/48V DC.
Based on this rating and current rating your Battery and Inverter systems need to be selected.
3 months back I got a quote for a 12V DC output panel, Rs. 55 per watt (Negotiable) and you can go for total output power of the panel customized to your need like 130W, 240W, 500W. 1000W...etc. Prices are declining slowly.
Hi blrsiteseeker/msn1270,
1. Before proceeding to think about solar power unit, Do I need to analysis on maximum sun light fall period on my house terus area. My house faces to south, my adjacent house at east have one extra floor than mine, It prevent sun light to fall till 10am.
2. What about the maintenance period/amount for this batteries? (life time of batteries)
3. Can give dealer name & brand you went for (Solar Panel/Batteries/Invertor/Wires/ Any other equipments)
4. Do electrical conduit need to provided at mould level for this solar power connection. My electrician have given connection for AC powerpack invertor, at this moment we have completed laying electrical conduits on wall.
5. How much your electrican asked for solar connection in your house. (Is it based on sq. ft or switch Point basis)
6. How much hours of electricity your solar panel can generates in average bangalore weather.
7. In general people will go for Solar water heater line since BESCOM insist the same for new connection, instead of Solar water heater, If I go for solar power unit. whether BESCOM will consider.
8. How much watts / voltage you went for 68k? (Price split-up if possible)
Thanks,
Pradeep
1. Before proceeding to think about solar power unit, Do I need to analysis on maximum sun light fall period on my house terus area. My house faces to south, my adjacent house at east have one extra floor than mine, It prevent sun light to fall till 10am.
2. What about the maintenance period/amount for this batteries? (life time of batteries)
3. Can give dealer name & brand you went for (Solar Panel/Batteries/Invertor/Wires/ Any other equipments)
4. Do electrical conduit need to provided at mould level for this solar power connection. My electrician have given connection for AC powerpack invertor, at this moment we have completed laying electrical conduits on wall.
5. How much your electrican asked for solar connection in your house. (Is it based on sq. ft or switch Point basis)
6. How much hours of electricity your solar panel can generates in average bangalore weather.
7. In general people will go for Solar water heater line since BESCOM insist the same for new connection, instead of Solar water heater, If I go for solar power unit. whether BESCOM will consider.
8. How much watts / voltage you went for 68k? (Price split-up if possible)
Thanks,
Pradeep
msn1270 wrote:Monagaadu
Answer for your query on Power output for a 0.5kW Panel lies in your Q itself.
alternately I can say, the voltage output of panels have multiple options like 12V/24V/48V DC.
Based on this rating and current rating your Battery and Inverter systems need to be selected.
3 months back I got a quote for a 12V DC output panel, Rs. 55 per watt (Negotiable) and you get can go for total output power of the panel customized to your need like 130W, 240W, 500W. 1000W...etc. Prices are declining slowly.
"Msn"Thanks a lot for the info, From your answer I came to know that we can have multiple options (12/24/48v DC). Any other info you have then please pass it on, I am planning to go for a duplex G+1, and there is ample open space on the rooftop. I am planning for 1KW.
The quote you have received is from a chinese make or European/US made panels ? Yes I can able to see that the prices are declining, but before I start my electrical work I want to have the provision of setting up the inverter connections too.
Generally (seeing neighbours), they have 2-3 separate lines based on utilization. One of the lines will have lightings on key areas like hall, kitchen, tv and may be a FAN in the hall etc.
Geyser and other high wattage devices are connected to a separate line. When KEB power goes off only one line gets power from backup automatically.
Geyser and other high wattage devices are connected to a separate line. When KEB power goes off only one line gets power from backup automatically.
Monagaadu.
G+1 or so is not important. How much space available on your terrace and the sun light availability period in a day makes the difference for your installation.
Usually almost all the makes available worldwide are made by Chinese only. Importing original European branded panels is very difficult and not economical at small quantities. Also many of the European brands are designed at their homeland, but manufactured in China and sold in their name. So segregating the origin is not practical. Also many of the US and European Solar PV Panel makers are closing as they're unable to compete with the chinese makers and financially bleeding. In Many countries like US & Germany.. makers are asking Government to put anti-dumping duty on chinese products for their survival, But it is not practical and against WTO trade agreement.
Recently i read in a news paper article and the same is also shared in this forum, that at around 3 lakhs investment, nano technology based imported Solar Power panels installation is done in a house at HSR Layout and the user is able to use this alternate power 24X7 and has not taken BESCOM connection at all.
----------------------------------------------------------------------------------------------------------------------------------------------
Dear Pradeep
Here are few info for your queries
1. Before proceeding to think about solar power unit, Do I need to analysis on maximum sun light fall period on my house terus area. My house faces to south, my adjacent house at east have one extra floor than mine, It prevent sun light to fall till 10am.
- Usually Panels are installed facing towards south direction, where maximum sunlight falls on the panel. Effectively Sun light is considered only for the period between 10:a.m to 4:0 p.m. Other mode is directional controlled using the stepper motor, which is advanced method and expensive, where the entire panel direction will be controlled and changed as per the peak sun light availability angle based on the sun sensor, which is not affordable for domestic projects.
2. What about the maintenance period/amount for this batteries? (life time of batteries)
Life of battery depends on the type of batteries you buy and also on regular maintenance. On an average 3-5 years.
3. Can give dealer name & brand you went for (Solar Panel/Batteries/Invertor/Wires/ Any other equipments)
I've not installed it as of now.
4. Do electrical conduit need to provided at mould level for this solar power connection. My electrician have given connection for AC powerpack invertor, at this moment we have completed laying electrical conduits on wall.
Usually your whole system will be placed on the terrace and the wiring will be passed to the required points as per your convenience.
Co-ordinate with your engineer/architect on the wiring stage.
5. How much your electrican asked for solar connection in your house. (Is it based on sq. ft or switch Point basis)
---
6. How much hours of electricity your solar panel can generates in average bangalore weather.
Its based on the sunlight availability, solar Panel power rating and the battery storage capacity. The charging duration also varies based on
these factors. Also based on the number of bulbs/fans you use at a time, decides the back up power duration. Say if you use the power at
full capacity i.e at 1KW continuously - your back duration will be maximum 1 hour. If you use 500w it will be 2 hours, at 250W it will be 4
hours...etc
7. In general people will go for Solar water heater line since BESCOM insist the same for new connection, instead of Solar water heater, If I go
for solar power unit. whether BESCOM will consider.
No idea. check the details of BESCOM policy.
8. How much watts / voltage you went for 68k? (Price split-up if possible)
----
G+1 or so is not important. How much space available on your terrace and the sun light availability period in a day makes the difference for your installation.
Usually almost all the makes available worldwide are made by Chinese only. Importing original European branded panels is very difficult and not economical at small quantities. Also many of the European brands are designed at their homeland, but manufactured in China and sold in their name. So segregating the origin is not practical. Also many of the US and European Solar PV Panel makers are closing as they're unable to compete with the chinese makers and financially bleeding. In Many countries like US & Germany.. makers are asking Government to put anti-dumping duty on chinese products for their survival, But it is not practical and against WTO trade agreement.
Recently i read in a news paper article and the same is also shared in this forum, that at around 3 lakhs investment, nano technology based imported Solar Power panels installation is done in a house at HSR Layout and the user is able to use this alternate power 24X7 and has not taken BESCOM connection at all.
----------------------------------------------------------------------------------------------------------------------------------------------
Dear Pradeep
Here are few info for your queries
1. Before proceeding to think about solar power unit, Do I need to analysis on maximum sun light fall period on my house terus area. My house faces to south, my adjacent house at east have one extra floor than mine, It prevent sun light to fall till 10am.
- Usually Panels are installed facing towards south direction, where maximum sunlight falls on the panel. Effectively Sun light is considered only for the period between 10:a.m to 4:0 p.m. Other mode is directional controlled using the stepper motor, which is advanced method and expensive, where the entire panel direction will be controlled and changed as per the peak sun light availability angle based on the sun sensor, which is not affordable for domestic projects.
2. What about the maintenance period/amount for this batteries? (life time of batteries)
Life of battery depends on the type of batteries you buy and also on regular maintenance. On an average 3-5 years.
3. Can give dealer name & brand you went for (Solar Panel/Batteries/Invertor/Wires/ Any other equipments)
I've not installed it as of now.
4. Do electrical conduit need to provided at mould level for this solar power connection. My electrician have given connection for AC powerpack invertor, at this moment we have completed laying electrical conduits on wall.
Usually your whole system will be placed on the terrace and the wiring will be passed to the required points as per your convenience.
Co-ordinate with your engineer/architect on the wiring stage.
5. How much your electrican asked for solar connection in your house. (Is it based on sq. ft or switch Point basis)
---
6. How much hours of electricity your solar panel can generates in average bangalore weather.
Its based on the sunlight availability, solar Panel power rating and the battery storage capacity. The charging duration also varies based on
these factors. Also based on the number of bulbs/fans you use at a time, decides the back up power duration. Say if you use the power at
full capacity i.e at 1KW continuously - your back duration will be maximum 1 hour. If you use 500w it will be 2 hours, at 250W it will be 4
hours...etc
7. In general people will go for Solar water heater line since BESCOM insist the same for new connection, instead of Solar water heater, If I go
for solar power unit. whether BESCOM will consider.
No idea. check the details of BESCOM policy.
8. How much watts / voltage you went for 68k? (Price split-up if possible)
----
Topic: AAC Blocks
I had seen these blocks and the Birla products and was very keen. The products indeed look attractive (G+3 in 3months?)
However, not many locally know these products. My builder claims that the after-sales support is poor (told to him by his friends in the builder community).
I tried calling up the mobile# listed on the brochure. "Invalid Number". Sent an email. No reply. Probably they are not keen on small projects but are more interested in the 10's of crores business.
So bye-bye Ultratech XtraLite
However, not many locally know these products. My builder claims that the after-sales support is poor (told to him by his friends in the builder community).
I tried calling up the mobile# listed on the brochure. "Invalid Number". Sent an email. No reply. Probably they are not keen on small projects but are more interested in the 10's of crores business.
So bye-bye Ultratech XtraLite
call Mr. Sangappa from Ultratech: 8722805027 for xtralite
also... nobody says no to business now a days.
let me check. my civil engineer says 'yes' let me get the structureal plan. please wait for some days.
regards
vinod
also... nobody says no to business now a days.
let me check. my civil engineer says 'yes' let me get the structureal plan. please wait for some days.
regards
vinod
Topic: help on Labour Contract, Payment Schedule & Material buy
Reply: help on Labour Contract, Payment Schedule & Material buy
Hi,
I am in stage of finalising agreement for Labour Contract. I am looking for a detailed agreement for this (like each and every item covered along with Payment Schedule), Can someone please share ?
Also want to understand like how much advance we should give to contractor ? He is asking Rs30,000. As per my understanding, in labour contract He is not going to invest anywhere (as material we will provide) So please share Stage wise Payment Schedule which i can use as a guide to frame my agreement.
Also Next step is to start analysis on material purchase. I am constructing house in HSR Layout. Could you please give some advice on reliable shops/markets etc ?
and last (if possible) list of material required for each stage ? (just to avoid last minute rush)
I am in stage of finalising agreement for Labour Contract. I am looking for a detailed agreement for this (like each and every item covered along with Payment Schedule), Can someone please share ?
Also want to understand like how much advance we should give to contractor ? He is asking Rs30,000. As per my understanding, in labour contract He is not going to invest anywhere (as material we will provide) So please share Stage wise Payment Schedule which i can use as a guide to frame my agreement.
Also Next step is to start analysis on material purchase. I am constructing house in HSR Layout. Could you please give some advice on reliable shops/markets etc ?
and last (if possible) list of material required for each stage ? (just to avoid last minute rush)
Simple and Blind rule : Any labour contractor who asks for advance is not reliable , and you will run into problems with such contractors sooner or later.
Topic: Steps I did, to get my building plan approval
Hi Jackalbda,
I am following your posts in mybdasites. I am also having a site in J P
nagar 8th phase. Could you please give your mobile number. I would like to
get some suggestions from you.
I am following your posts in mybdasites. I am also having a site in J P
nagar 8th phase. Could you please give your mobile number. I would like to
get some suggestions from you.
Sent you a PM with my email info.
Thanks jackalbda
Topic: selecting teakwood log
dev13 wrote:Considering rupee appreciation, there sould be mild drop in rates ??
I heard that one has to stay throughout the process of cutting log to be present in the saw mill, so no pilferage can happen.
and it can take couple of days from start.
1. Yes, the rupee has appreciated, but the cost has gone up overseas. Quite unfortunate.
2. 100 CFT can be made ready in 6 hours flat, but, this again depends on the capacity of the sawmill. It took 12 hrs for me to get my 230 CFT cut & edges trimmed & designed.
3. No carpenter will vouch for the quality of the log. there are numerous stories on the Teak logs getting hollow in the middle. There are few sawmill owners who will compensate you untill 50% for the same & some, who do not. Hence, LUCK plays a major role in this.
4. Most importantly, visit a sawmill who is more reilable & is in a position to take ownership on such cases.
@dev13 - we bought teak wood logs in June, so the prices may not be useful. You also need to note the diameter of the log, as the price depends on the diameter, which in turn is a measure of the age of the tree.
From my experience, I felt that it is very important to go to a reliable sawmill. My engineer referred me to a sawmill from whom they have been purchasing wood. The sawmill guys helped us select the good logs due to the reference and luckily none of them had hollow sections. As mentioned by other members, nobody will take responsibility for the log, it's finally your call. The cutting and planing was done over two days and our carpenter was present all the time to ensure that the wood was not misappropriated and also cut to the sizes that we needed.
Couple of things I noted while selecting the log are,
- select the widest logs that your budget permits
- try and avoid logs that have lots of knots
- some logs have the outer skin peeling off, making them look unattractive, but this does not mean that the log is not good.
Of course I am no expert, these are just points that I heard and noticed the day we selected our logs.
From my experience, I felt that it is very important to go to a reliable sawmill. My engineer referred me to a sawmill from whom they have been purchasing wood. The sawmill guys helped us select the good logs due to the reference and luckily none of them had hollow sections. As mentioned by other members, nobody will take responsibility for the log, it's finally your call. The cutting and planing was done over two days and our carpenter was present all the time to ensure that the wood was not misappropriated and also cut to the sizes that we needed.
Couple of things I noted while selecting the log are,
- select the widest logs that your budget permits
- try and avoid logs that have lots of knots
- some logs have the outer skin peeling off, making them look unattractive, but this does not mean that the log is not good.
Of course I am no expert, these are just points that I heard and noticed the day we selected our logs.
thanks m3_07 & ddn for valuable inputs.
Topic: Doors and Windows
sudhu_kumar wrote:1 - Main door teak - Carpenter
2 - Windows frame Red saal - Carpenter
3 - Window shutter - Australian Honne - Carpenter
4 - Balcanony - exit doors - MS sheet Fibre doors - stronger then wood -ready made
5 - Wet area - Fibre doors -ready made
6 - Rooms - Flush doors - ready made - Frames - Carpenter.
7 - Wet area windows - Aluminum windows -Ready made
Hope this helps
For #5 above, by fibre door, I think you meant HDF or masonite skin doors right? what type of frames are used? Are wood frames (sal/honne) OK for wet areas? Any feedback about FRP frames?
Topic: Required Labour Contractor
Reply: Required Labour Contractor
Hi ,
Iam looking for a labour contractor for constructing 3rd floor of a house at Kasturi Nagar ( Close to ramamurthy nagar , banaswadi).
Please provide me contacts of good and reliable contractors.
Thanks.,
Jagadish
Iam looking for a labour contractor for constructing 3rd floor of a house at Kasturi Nagar ( Close to ramamurthy nagar , banaswadi).
Please provide me contacts of good and reliable contractors.
Thanks.,
Jagadish
Topic: Costing analysis- FRP door vs Flush Door - guidance needed
Are FRP frames better than hard wood frame (Sal or Honne)? As per my understanding FRP frames do not warp or crack like hard wood.
Can flush doors or other membrane doors be fitted to an FRP frame?
Thanks in advance for your guidance.
Can flush doors or other membrane doors be fitted to an FRP frame?
Thanks in advance for your guidance.
Topic: Borewell rate - Please help
ilu1979 wrote:Hi team,
I got my borewell doen on 1st Oct 2012. Here is the Rate card.
Feet Rate
300ft 65 Rs
300 - 400 75 Rs
400-500 85 Rs
500-600 100 Rs
600-700 120 Rs
700-800 140 Rs
800-900 160 Rs
Each Collar 20ft 150 Rs
Casing pipe Per feet 260 Rs
CAP 100 Rs
Each Collar Welding 150 Rs
Transport 500 Rs
Labour 500 Rs
Borepoint consultation 1000 Rs
Hi Friend,
Could you please tell me which Borewell operator you gone with in Bangalore?
Thanks
Babu
Forum: Interiors
Topic: Bathtub
Reply: Bathtub
Hi,
I need to buy an ordinary bath tub for my kids toilet. Most of the shops that I looked around sell tubs + jacuzzi with all bells & whistles which we are not interested. My current rental home has an acrylic tub made by Bridgestone plastics. Unfortunately, this tub is not wide enough and gives a bad smell when hot shower is taken. Also I can't find this company online to see more models. Any suggestions where to look for a good one in bangalore ?
Thanks
Vimal
I need to buy an ordinary bath tub for my kids toilet. Most of the shops that I looked around sell tubs + jacuzzi with all bells & whistles which we are not interested. My current rental home has an acrylic tub made by Bridgestone plastics. Unfortunately, this tub is not wide enough and gives a bad smell when hot shower is taken. Also I can't find this company online to see more models. Any suggestions where to look for a good one in bangalore ?
Thanks
Vimal
Roca have got a nice simple bath tub. when i asked they said its 40k just the tub. with Jacuzzi its 1.2 lacs. In Indiranagar 80ft road there is a showroom FMCL bathroom its very expensive but u can find all the varieties there.
Just check at TILEPRINT near lalbagh west gate. They have tub cost around 9.5K and looks excellent (Brand livestyle). I purchased it around a months back. Not yet used since installation got done yesterday.
Thanks
Dreamhome
Thanks
Dreamhome
Topic: Modular Kitchen
Manjunath_H wrote:Hi All,
As per my personal experience, dont go for readymade wardrobes or kitchen cabinets, They look fancy, expensive and they are not durable. you can hire a good carpenter and get things done, which last for longer. I did the same and I am happy with the work, materials used and it was within my budget.
If anyone are looking for a good carpenter. I can refer you, you can take a quotation from him, compare with others. you can also see the works done by him.
For carpenter details you can PM me.
Thanks,
Manjunath
Hi Manjunath,
Could you please give me your Carpenter contact info?
Thanks
S.Babu
some links to help design your kitchen.
Some these are sort of impractical for our homes in India (mostly because of the small plot sizes), but you can steal ideas from each one
http://kitchens.com/photos/traditional-kitchens/seaside-kitchen-with-red-island/
http://kitchens.com/photos/traditional-kitchens/restaurant-owners-kitchen/#photo
http://kitchens.com/photos/traditional-kitchens/base-cabinet-tilt-out/#photo
http://www.hgtv.com/designers-portfolio/kitchens/index.html
Some these are sort of impractical for our homes in India (mostly because of the small plot sizes), but you can steal ideas from each one
http://kitchens.com/photos/traditional-kitchens/seaside-kitchen-with-red-island/
http://kitchens.com/photos/traditional-kitchens/restaurant-owners-kitchen/#photo
http://kitchens.com/photos/traditional-kitchens/base-cabinet-tilt-out/#photo
http://www.hgtv.com/designers-portfolio/kitchens/index.html
Topic: Wardrobe / Closet Design
Reply: Wardrobe / Closet Design
Hello all,
After some posts on the Modular kitchen thread, I have been getting requests for pictures of my closets. Unfortunately, I have no pictures and not local to take them.
The door for the walk-in closet is like a regular door for a room. For reach-in closets, you need to provide sliding or folding doors and it has to cover the entire width of the closet (so you have access to the contents)
But here are some links that can give you ideas of how these can be designed.
Walk-in closets:
http://www.easyclosets.com/showroomDetail.aspx?g=23
http://www.easyclosets.com/showroomDetail.aspx?g=0
http://www.easyclosets.com/showroomDetail.aspx?g=38
http://www.easyclosets.com/showroomDetail.aspx?g=58
http://www.easyclosets.com/showroomDetail.aspx?g=27
could be used for reach-in or walk-in closet design:
http://www.easyclosets.com/showroomDetail.aspx?g=5
Reach-in closets
http://www.easyclosets.com/showroomDetail.aspx?g=45
http://www.easyclosets.com/showroomDetail.aspx?g=39
http://www.easyclosets.com/showroomDetail.aspx?g=40
http://www.easyclosets.com/showroomDetail.aspx?g=25
After some posts on the Modular kitchen thread, I have been getting requests for pictures of my closets. Unfortunately, I have no pictures and not local to take them.
The door for the walk-in closet is like a regular door for a room. For reach-in closets, you need to provide sliding or folding doors and it has to cover the entire width of the closet (so you have access to the contents)
But here are some links that can give you ideas of how these can be designed.
Walk-in closets:
http://www.easyclosets.com/showroomDetail.aspx?g=23
http://www.easyclosets.com/showroomDetail.aspx?g=0
http://www.easyclosets.com/showroomDetail.aspx?g=38
http://www.easyclosets.com/showroomDetail.aspx?g=58
http://www.easyclosets.com/showroomDetail.aspx?g=27
could be used for reach-in or walk-in closet design:
http://www.easyclosets.com/showroomDetail.aspx?g=5
Reach-in closets
http://www.easyclosets.com/showroomDetail.aspx?g=45
http://www.easyclosets.com/showroomDetail.aspx?g=39
http://www.easyclosets.com/showroomDetail.aspx?g=40
http://www.easyclosets.com/showroomDetail.aspx?g=25
Topic: Need inputs for False ceiling and POP
Hi Tech4PK,
can you provide the cost you spent for SFT and material used and labour charge ....total cost you spent for the entire ceiling.
Regards,
Krishna Chaitanya N
can you provide the cost you spent for SFT and material used and labour charge ....total cost you spent for the entire ceiling.
Regards,
Krishna Chaitanya N
Hi guys
In current market gypsum false celling starts at 45/- per Str and goes up to 90/-per sft.price mentioned is for plain work.
If you have too many details, ups & downs, free forms cost goes high.
Keep in mind that any thing less than 1'x1' size is considered as one Sft.
Boarders ,steps are measured in running feet.
More corners - high cost
If some one looking for pop guys PM me ,I can reffer some good one.
Regards
Ar.Praveen.N
Ardes architects and interior designers
www.ardesarchitects.com
____________________
we design you a home but not a house .............
In current market gypsum false celling starts at 45/- per Str and goes up to 90/-per sft.price mentioned is for plain work.
If you have too many details, ups & downs, free forms cost goes high.
Keep in mind that any thing less than 1'x1' size is considered as one Sft.
Boarders ,steps are measured in running feet.
More corners - high cost
If some one looking for pop guys PM me ,I can reffer some good one.
Regards
Ar.Praveen.N
Ardes architects and interior designers
www.ardesarchitects.com
____________________
we design you a home but not a house .............
Hi Praveen,
Pls PM me, pop guy's number.
Thanks,
Pradeep
Pls PM me, pop guy's number.
Thanks,
Pradeep
Topic: home security solution vendor
D-link camera seems to be one good option
http://www.techradar.com/reviews/pc-mac/peripherals/multimedia/cctv/d-link-home-network-camera-dcs-942l-1070678/review
http://www.techradar.com/reviews/pc-mac/peripherals/multimedia/cctv/d-link-home-network-camera-dcs-942l-1070678/review
Topic: Centralized Vaccum cleaning systesm
Reply: Centralized Vaccum cleaning systesm
Hi,
On TLC channel, I watched centralized vacuum cleaning system it was quite good method to clean things for entire house. how effective it would be in india/bangalore? Is it worth to spend?
-Venky
On TLC channel, I watched centralized vacuum cleaning system it was quite good method to clean things for entire house. how effective it would be in india/bangalore? Is it worth to spend?
-Venky
Forum: Material prices -- Members only
Topic: Construction material prices
when i enquired in shop they said indus is costlier cos they invest in advertisement n according to them all brands r good and even they suggested to go tata coz it better than indus ....i think it all depends on people mindset and money
all workers r very smart people n barbenders also ...barbending job will be easier for them ..dont dont have to waste there energy in bending rods ...they prefer tata barbending wire coz its it is smooth n not so hard compare to other brands
all workers r very smart people n barbenders also ...barbending job will be easier for them ..dont dont have to waste there energy in bending rods ...they prefer tata barbending wire coz its it is smooth n not so hard compare to other brands
Topic: borewell pump
Use of rope is certainly an added safety measure if the HDPE pipe thickness/gauge is less. HDPE pipe thickness has to be proportional to the depth at which the pump will be installed. I did not attach the rope to the pump as advised by the vendor(Kavitha Enterprises, City Market area) as he said the HDPE pipe thickness that was given (I don't remember exact thickness) is sufficient to support the pump installed at 900 ft.
Could other's share their experience as to whether they attached the rope or not . Did anyone face issue while taking out the pump for any repair when the pump did not have the rope attached?.
Could other's share their experience as to whether they attached the rope or not . Did anyone face issue while taking out the pump for any repair when the pump did not have the rope attached?.
For 900 ft supplier informed that 1" is fine but later he said that its better we go for 1 and 1/2 inch. I havent installed the rope with the HDPE pipe. The pipe is being bolted with the cross rods so that the pump wont fall into the bore. The electric cable has been plastered for every 15-20ft. Even I just heard about the rope thingy but if we push the rope then it should be a good plastic else the water will be contaminated.
Forum: Documents
Topic: Actual measurement of BDA plots
Dear Yash
Since the establishment of BDA(Also any other Urban Development authorities or KHB in Karnataka) is giving
measurements in metres in their ads as well as in their sale deeds. Personally I think(as I've not purchased
BDA site So far), they cannot make such differences i.e stating 12X18 Mtr as site dimension in papers and
creating 40X60 ft size Sites. B'cos for a small site like 6X9 mtr(So called 20X30) difference may be small,
whereas as we go towards higher size, the difference is very much which can't be neglected.
Moreover BDA has not made any layouts after 2002(Former CM S.M Krishna's Period). So how to benchmark
your statement like Pre 2008 and Post period?
Since the establishment of BDA(Also any other Urban Development authorities or KHB in Karnataka) is giving
measurements in metres in their ads as well as in their sale deeds. Personally I think(as I've not purchased
BDA site So far), they cannot make such differences i.e stating 12X18 Mtr as site dimension in papers and
creating 40X60 ft size Sites. B'cos for a small site like 6X9 mtr(So called 20X30) difference may be small,
whereas as we go towards higher size, the difference is very much which can't be neglected.
Moreover BDA has not made any layouts after 2002(Former CM S.M Krishna's Period). So how to benchmark
your statement like Pre 2008 and Post period?
BDA plots were always done in meters and so the plot is typically less than the square footage in the ads. I have posted about this several times, warning potential buyers from paying more.
At the end of the day, if you like your plot and want to live there, you should just go ahead and buy it. Hope you can negotiate with the owner for a better price.
At the end of the day, if you like your plot and want to live there, you should just go ahead and buy it. Hope you can negotiate with the owner for a better price.
BDA plots though measured in meters have a 2 decimal notification, which will approximate the Feet measurement. In case the documents have the meter figures rounded off, that is incorrect.
m3_07,
only for corner or odd dimensional sites, size will be mentioned in 2 decimal points, Else its always round fig only. Find the attached one such adv from KHB in todays newspapers for the Corner sites to be auctions and watch the sizes, Sl #10 i.e. 9X12 mtrs(Which people perceive as 30X40 ft Dimension) and its equivalent size mentioned is 1162.08 sq.ft. Same way BDA also mention their site sizes only in Mtrs.
only for corner or odd dimensional sites, size will be mentioned in 2 decimal points, Else its always round fig only. Find the attached one such adv from KHB in todays newspapers for the Corner sites to be auctions and watch the sizes, Sl #10 i.e. 9X12 mtrs(Which people perceive as 30X40 ft Dimension) and its equivalent size mentioned is 1162.08 sq.ft. Same way BDA also mention their site sizes only in Mtrs.
The sites that were formed in the early years were really 2400 SQ FT. Infact out plot in Mysore is m 41*60, we got the additional 1 feet due to a corner site and the sale deed has 41 feet speicified and we got the same measured as well.
Dear yash
There are specific cases, where people have applied for say A x B mtr size and while the carving out the plots from the acquired land, in some cases few plots gets some odd dimension specifically in cases sites coming on border/corner areas which will be specifically mentioned in the sale deed and the differential amount will be taken in case of higher size and refunded in case of lower size. Yours might also similar one.
In one of my relative case also, they had applied for a 9 X12 mtr size and was allotted with a plot size of 30.5 X 42 ft in Nagarabhavi 9th Block, behind Ambedkar College. They were asked to pay for the additional amount before registration. In the same cross other extreme end, the plot size were even more than 30 X 50 or higher higher, But they were allotted for the applicants of 9X12 mtr.
There are specific cases, where people have applied for say A x B mtr size and while the carving out the plots from the acquired land, in some cases few plots gets some odd dimension specifically in cases sites coming on border/corner areas which will be specifically mentioned in the sale deed and the differential amount will be taken in case of higher size and refunded in case of lower size. Yours might also similar one.
In one of my relative case also, they had applied for a 9 X12 mtr size and was allotted with a plot size of 30.5 X 42 ft in Nagarabhavi 9th Block, behind Ambedkar College. They were asked to pay for the additional amount before registration. In the same cross other extreme end, the plot size were even more than 30 X 50 or higher higher, But they were allotted for the applicants of 9X12 mtr.
Friends....Friends....when I say the meter measurement is in 2 decimal points, I mean it....'coz I have 2 bda plots that are intermediate.
Ha Ha Ha!
Yes, I know many intermediate sites in BTM Layout 4 and 6th stages having decimal dimensions. I recently wanted to buy one but the deal did not go through.
Also, in ISRO layout, I know for sure that site measurements have 2 decimal places and if you convert the area in meters to feet, they will match to rounded feets.
Yes, I know many intermediate sites in BTM Layout 4 and 6th stages having decimal dimensions. I recently wanted to buy one but the deal did not go through.
Also, in ISRO layout, I know for sure that site measurements have 2 decimal places and if you convert the area in meters to feet, they will match to rounded feets.
Thanks a lot to everyone for the responses, specially for m3_07 for the attachment. I tried to renegotiate the deal, but it was not fruitful. I had gone very far ahead in the deal to come back or cancel the agreement, so I decided to go ahead with the deal. It was a good and costly learning for me... thanks again to all...
Prashanthhs
Curious to know, did u measured the size of the plot ?
Curious to know, did u measured the size of the plot ?
Topic: Need urgent information regarding Khatha transfer
Reply: Need urgent information regarding Khatha transfer
I have decided to buy 30x40 plot in Nobel Residency... off Bannerghatta road.
Currently the plot has BBMP B Khatha.
The agent and owner told me that they will convert plot Khatha from B Khatha to A Khatha after agreement.
The conversion will happen after agreement is done and once they get A khatha for the plot then i need to go for registration.
If anyone aware of this process, please let me know if there are any legal issues after this conversion?
Is it good to go for this plot?
Currently the plot has BBMP B Khatha.
The agent and owner told me that they will convert plot Khatha from B Khatha to A Khatha after agreement.
The conversion will happen after agreement is done and once they get A khatha for the plot then i need to go for registration.
If anyone aware of this process, please let me know if there are any legal issues after this conversion?
Is it good to go for this plot?
Not sure but be careful with this transaction. If the owner can convert it into A-Katha, then he could have already done and sold it for higher price than selling it to you on a B-Katha price.
Topic: A khata for Layout but not for Individual sites
@chidu, I am sorry, your answer did not clear the doubt. Is it okay to have A Katha for the entire layout? Can we built a house and resell the individual site without any issues? Or do we need to apply for Katha bifurcation? Appreciate your replies.......
All the brokers i have met they mention you will get katha (A-katha) but in reality you will NOT get katha.
Most BBMP approved layouts, have whole land A-katha layout is actually NOT a layout at all in the STRICT sense. They got A-katha for whole land and sub-divided the whole-land in to several plots and roads. Now the question is, does the road within the layout belong to whom ? to BBMP or is the land for road still under the layout-owners name ?. Please think about this.
Actual way of doing a layout is to give 40% to common ammenties like roads, parks, sewage,water tank,electric poles etc,.and the remaining 60% for plots. In such case BBMP will give katha for individual plots as the developer would have paid betterment for EACH-plot. But when they get BBMP whole land A-katha, technically speaking according to BBMP, you are going to build a single house in that BIG-layout land, which in most cases fits only for apartment. BBMP responsibility is to help one-road connection, electricity/water (indirectly) reach to your BIG home or the apartment and not more. But the developers get whole land A-katha approval and smartly sub-divide that whole layout into several plots and sell it, leaving no-space for parks and common amenities. So in which case, how can BBMP give katha for individual plots, so they make an entry in the B-register, and do not give katha.
Let us think about this in other direction. I have 2-acres of land, and i get katha for whole land and sub-divide to several plots and sell it off. Now next land owner who has 2-acres, he also does the same. Finally in entire bangalore you will see layout after layout with no room for parks, common-amenties etc,. Is this fine ?
Now who does not like Jayangar, JP nagar which has parks and houses etc,. So my strict personal opinion is to STOP buying such whole land A-katha (finally B-katha properties) and making developers rich, and buyers create more B-katha properties in bangalore, and not getting a house-loan approval.
I got this learning in extremely HARD-way after discussing this with several good lawyers who are soaked in this field and explained to me the reason of How B-katha properties are formed and how one should stay from it, and why actually government wants to discourage formation of B-katha by not giving proper katha.
Even if you read Chidu' message inbetween the lines it says exactly what i have told "However, if the layout is formed is a unauthorized layout or a revenue land without DC conversion, then BBMP will collect taxes for such properties in a separate register called B Khata". Which means there is something called authorised and un-authorised layout. IF the whole land has A-katha, and then they're giving individual sites for B-kath, then is the REVERSE meaning not true that the layout is actually in strict terms not authorised ? There should be a difference between developers who get whole land A-katha and genuine developers who split the whole layout properly and give room for parks and get individual katha in their name and transfer it to the buyer name, which is the actual, correct procedure.
But inspite of knowing all this people still buy plots and "create" B-katha plots, by buying such properties. This is because brokers/developer CONFIDENTLY tell that SURELY you will get Katha. If that is case, please ask them these 2 questions:
a. Am i the first buyer of the plot in your layout, for which the answer will be No, and will say many have bought
b. If (a) is true, please ask them to show Xerox copy of one of the KATHA of one of the buyer and request them to provide his telephone number.
Most cases you will never see the broker/developer again.
The most dangerous problem with B-katha sites is you will not get loan to build a house, and so many in the layout will not be able to build the house, so it will be a barren lands, with grass sprouting from the roads for years to gether. And since no house is there, some day BDA - MAY come and take over (Even though you may have NOC), as the land is not fully put to use. Or even if they dont, the buyer has to wait indefinitely for Akrama-sakrama. So many buyers have their money locked up in such dead properties.
Most BBMP approved layouts, have whole land A-katha layout is actually NOT a layout at all in the STRICT sense. They got A-katha for whole land and sub-divided the whole-land in to several plots and roads. Now the question is, does the road within the layout belong to whom ? to BBMP or is the land for road still under the layout-owners name ?. Please think about this.
Actual way of doing a layout is to give 40% to common ammenties like roads, parks, sewage,water tank,electric poles etc,.and the remaining 60% for plots. In such case BBMP will give katha for individual plots as the developer would have paid betterment for EACH-plot. But when they get BBMP whole land A-katha, technically speaking according to BBMP, you are going to build a single house in that BIG-layout land, which in most cases fits only for apartment. BBMP responsibility is to help one-road connection, electricity/water (indirectly) reach to your BIG home or the apartment and not more. But the developers get whole land A-katha approval and smartly sub-divide that whole layout into several plots and sell it, leaving no-space for parks and common amenities. So in which case, how can BBMP give katha for individual plots, so they make an entry in the B-register, and do not give katha.
Let us think about this in other direction. I have 2-acres of land, and i get katha for whole land and sub-divide to several plots and sell it off. Now next land owner who has 2-acres, he also does the same. Finally in entire bangalore you will see layout after layout with no room for parks, common-amenties etc,. Is this fine ?
Now who does not like Jayangar, JP nagar which has parks and houses etc,. So my strict personal opinion is to STOP buying such whole land A-katha (finally B-katha properties) and making developers rich, and buyers create more B-katha properties in bangalore, and not getting a house-loan approval.
I got this learning in extremely HARD-way after discussing this with several good lawyers who are soaked in this field and explained to me the reason of How B-katha properties are formed and how one should stay from it, and why actually government wants to discourage formation of B-katha by not giving proper katha.
Even if you read Chidu' message inbetween the lines it says exactly what i have told "However, if the layout is formed is a unauthorized layout or a revenue land without DC conversion, then BBMP will collect taxes for such properties in a separate register called B Khata". Which means there is something called authorised and un-authorised layout. IF the whole land has A-katha, and then they're giving individual sites for B-kath, then is the REVERSE meaning not true that the layout is actually in strict terms not authorised ? There should be a difference between developers who get whole land A-katha and genuine developers who split the whole layout properly and give room for parks and get individual katha in their name and transfer it to the buyer name, which is the actual, correct procedure.
But inspite of knowing all this people still buy plots and "create" B-katha plots, by buying such properties. This is because brokers/developer CONFIDENTLY tell that SURELY you will get Katha. If that is case, please ask them these 2 questions:
a. Am i the first buyer of the plot in your layout, for which the answer will be No, and will say many have bought
b. If (a) is true, please ask them to show Xerox copy of one of the KATHA of one of the buyer and request them to provide his telephone number.
Most cases you will never see the broker/developer again.
The most dangerous problem with B-katha sites is you will not get loan to build a house, and so many in the layout will not be able to build the house, so it will be a barren lands, with grass sprouting from the roads for years to gether. And since no house is there, some day BDA - MAY come and take over (Even though you may have NOC), as the land is not fully put to use. Or even if they dont, the buyer has to wait indefinitely for Akrama-sakrama. So many buyers have their money locked up in such dead properties.
very nice explanation.. Thanks krish
hkrish wrote:The most dangerous problem with B-katha sites is you will not get loan to build a house, and so many in the layout will not be able to build the house, so it will be a barren lands, with grass sprouting from the roads for years to gether. And since no house is there, some day BDA - MAY come and take over (Even though you may have NOC), as the land is not fully put to use. Or even if they dont, the buyer has to wait indefinitely for Akrama-sakrama. So many buyers have their money locked up in such dead properties.
I'm not sure about developer getting A-Katha for entire layout without providing basic amenities, since BMRDA and BDA will withhold the release of 40% of sites and many member here have also mentioned that. But I do agree that having B-katha will surely be a problem when you go for loan or selling it later. I have first hand experience
Forum: Site for sale
Topic: BDA Site for Sale, 4th B Block, BSK 6th Stage
I am interested. Please provide your contact number or else please call me @ 9886714887
Topic: Sale 40x60 East facing site Bannerghatta road. Rs2000 psft
Thanks for the info. Will please call on my mobile 7829774477
Forum: Site wanted
Topic: Site wanted near Manyata Tech Park
Reply: Site wanted near Manyata Tech Park
Dear All,
I am looking for a site near Manyata tech park / Bangalore north. I would prefer either BDA or any other competent government authority approved ones. If anyone have any information please let me know. I have been to Rajiv Gandhi Nagar (NTI Layout) and had some reservations because I heard that there were some tussle between the farmers and the developers. The estate agent told that the litigation is quashed and is no more an issue.
Regards
SP
I am looking for a site near Manyata tech park / Bangalore north. I would prefer either BDA or any other competent government authority approved ones. If anyone have any information please let me know. I have been to Rajiv Gandhi Nagar (NTI Layout) and had some reservations because I heard that there were some tussle between the farmers and the developers. The estate agent told that the litigation is quashed and is no more an issue.
Regards
SP
Topic: Looking for site in Upkar greenfields
I own a site at the above location. Price Rs. xxxx/sqft (Final price). Kindly send me your quiery to xxxxxx
Please post an ad in 'Site for sale' with template mentioned in 'Forum Rules' and prove the link here. -Admin Team.
Please post an ad in 'Site for sale' with template mentioned in 'Forum Rules' and prove the link here. -Admin Team.
Topic: Sites Around Hormau, TC Palya & Ramamurthy nagar
Hi All, 2day I called up Lakeview Garden people and they told that they don't have A Katha for individual sites. Is It necessary to have A katha for individual sites? They claim that they have A katha for the layout. Is that enough? Will any problem occur in the future when selling out the land or building a house? Appreciate your replies....
Forum: House for sale
Topic: High tension wire over residential house
Hi Vamsee,
its all about how you perceive. It is not scientifically proven.... there were many studies done and here are some links to get you a clarity:
1. http://www.duke-energy.com/pdfs/emf_brochure.pdf
2. http://www.aaronline.com/documents/electromagfields.aspx
3. http://www.quackwatch.com/01QuackeryRelatedTopics/emf.html
4. http://www.niehs.nih.gov/health/topics/agents/emf/
5. http://www.who.int/peh-emf/project/en/index.html
6. http://www.who.int/peh-emf/about/WhatisEMF/en/index1.html
Cheers
Nagarjun
its all about how you perceive. It is not scientifically proven.... there were many studies done and here are some links to get you a clarity:
1. http://www.duke-energy.com/pdfs/emf_brochure.pdf
2. http://www.aaronline.com/documents/electromagfields.aspx
3. http://www.quackwatch.com/01QuackeryRelatedTopics/emf.html
4. http://www.niehs.nih.gov/health/topics/agents/emf/
5. http://www.who.int/peh-emf/project/en/index.html
6. http://www.who.int/peh-emf/about/WhatisEMF/en/index1.html
Cheers
Nagarjun
I am wondering if this plot is properly approved ?
Because as per my knowledge, developers can not make plots for the residential purpose if any high tension elec wires are passing through. They usually marks that area for the parks or something. I came across this kind of projects. So better check before buying.
Because as per my knowledge, developers can not make plots for the residential purpose if any high tension elec wires are passing through. They usually marks that area for the parks or something. I came across this kind of projects. So better check before buying.
Hello All,
Thanks for all your replies.They have really helped me in taking a good decision.
This is a DC converted BBMP A Khatha Site which was done long before probably with gram panchayath approval and now under BBMP.
Yesterday I measured the distance from the line to the edge of my site and it was like 10 to 12 feet. (Ground Distance). so aerial distance also might be some where around.
Also I could hear the humming noise. I spoke to some guys with in the layout and they told me not to buy it.
So finally i have called it Off.
thanks a lot to everybody.
Thanks and Regards
Vamsee
Thanks for all your replies.They have really helped me in taking a good decision.
This is a DC converted BBMP A Khatha Site which was done long before probably with gram panchayath approval and now under BBMP.
Yesterday I measured the distance from the line to the edge of my site and it was like 10 to 12 feet. (Ground Distance). so aerial distance also might be some where around.
Also I could hear the humming noise. I spoke to some guys with in the layout and they told me not to buy it.
So finally i have called it Off.
thanks a lot to everybody.
Thanks and Regards
Vamsee
Hi adroit
I also face a similar situation few days ago. i was looking at a plot in duo south county and there was high tension wire passing through the layout. However as per BDA approved plan area below the HT line is marked for park. However I did not get a humming noise or any such thing when I was there even below the lines. The plot I was looking at was at a distance of ~45 metres ground wise and probably more than 50 metres aerial so I decided to go ahead. However I dont knw if they are 66kv lines or what. Just thought would share here that even BDA approved layouts can have HT lines passing through.
I also face a similar situation few days ago. i was looking at a plot in duo south county and there was high tension wire passing through the layout. However as per BDA approved plan area below the HT line is marked for park. However I did not get a humming noise or any such thing when I was there even below the lines. The plot I was looking at was at a distance of ~45 metres ground wise and probably more than 50 metres aerial so I decided to go ahead. However I dont knw if they are 66kv lines or what. Just thought would share here that even BDA approved layouts can have HT lines passing through.
BDA Approved layouts also have the HT lines passed through them. But they adhere to some kind of rules and regulations. As you said, they planned the Park below the HT lines. Also, they should left sufficient place in terms of the ground distance between the plots and the HT lines.
However in some cases and un-authorised layouts, the plot is either very close to the HT lines in terms of ground distance or the worst case the part of HT line is passed through the plot. These are the serious issues.
However in some cases and un-authorised layouts, the plot is either very close to the HT lines in terms of ground distance or the worst case the part of HT line is passed through the plot. These are the serious issues.
Forum: Rental Available
Topic: Independent 2 BHK@Supreme Residency-Nr Vijaya Bank colony
Reply: Independent 2 BHK@Supreme Residency-Nr Vijaya Bank colony
Hi,
I think we do not have a specific format to post Rental available, do let me know if there is one! will update
Posting this one on behalf of my family friend.
What ? - Independent 2 BHK, semi furnished for rent
Where? - Supreme Residency, Near Vijaya Bank colony, BTM 4th Stage, 1 KM to Bannerghatta (Arekere signal) main road, 1.5 KM to Bommana Halli, Hosur road,
when? - renovation complete, paining and carpentry work complete, Readily available for immediate occupants
Veg/Non-Veg - VEG ONLY
Car Parking? - Yes, sedan would fit
Two Wheeler Parking? - Yes, one bike can comfortably parked
Water? - Weekly once/twice cauvery water
Safety? - House fully surrounded with grills
How much? - 10500 PM and 10 month advance, pay power and water charges as per the usage
How to reach? - PM me, email me at sudhi.un@gmail.com, or just share your phone#, I will call back
SUN
I think we do not have a specific format to post Rental available, do let me know if there is one! will update
Posting this one on behalf of my family friend.
What ? - Independent 2 BHK, semi furnished for rent
Where? - Supreme Residency, Near Vijaya Bank colony, BTM 4th Stage, 1 KM to Bannerghatta (Arekere signal) main road, 1.5 KM to Bommana Halli, Hosur road,
when? - renovation complete, paining and carpentry work complete, Readily available for immediate occupants
Veg/Non-Veg - VEG ONLY
Car Parking? - Yes, sedan would fit
Two Wheeler Parking? - Yes, one bike can comfortably parked
Water? - Weekly once/twice cauvery water
Safety? - House fully surrounded with grills
How much? - 10500 PM and 10 month advance, pay power and water charges as per the usage
How to reach? - PM me, email me at sudhi.un@gmail.com, or just share your phone#, I will call back
SUN
Forum: City info
Topic: Sri. Shettar to inaugurate cauvery iv stage phaseii
Reply: Sri. Shettar to inaugurate cauvery iv stage phaseii
http://www.thehindu.com/news/cities/bangalore/shettar-to-inaugurate-cauvery-iv-stage-phase-ii/article4050002.ece
hope this will result in some development in jp nagar 8 phase
Forum: Investment Longue
Topic: Apartment - Short Term Investment
Reply: Apartment - Short Term Investment
I have been looking to buy a plot actually for a while but either they are not in budget or not liking what I'm getting. So instead of waiting endlessly, I'm thinking of going for an apartment for the time being as I need to focus on work. This will be for my own residential purpose.
Considering that I'm going to take a 50% housing loan for the apartment and the interest amount is more during the initial years of the loan, would it make financially a sound decision to buy one only for a period of around 5 years? After that I plan to sell it off and purchase site+construct my own house.
Considering that I'm going to take a 50% housing loan for the apartment and the interest amount is more during the initial years of the loan, would it make financially a sound decision to buy one only for a period of around 5 years?
Is the bank OK with a 5 year home loan ? If so you have these options
i. Go for a 10 or 15 yr loan but pre-close it in 5 yrs. RBI has instructed banks to not charge pre-closure charges. So you should not be losing anything due to pre-closure.
ii. Go for a 5 yr loan and let it to complete its tenure. But it is likely the last year's interest component might be too less and wont be anywhere near 1.5 lakhs.
In either ways it is good to close the home loan within 5 to 8 years. Because the IT rebate is not beneficial beyond a point when the interest component is less than 1.5 lakhs. So look at options where the interest component is more or around 1.5 lakhs for atleast 5 yrs.
I dont have the bank figures for EMI and the interest component spread across for option i and ii. It will be a good study.
i. Go for a 10 or 15 yr loan but pre-close it in 5 yrs. RBI has instructed banks to not charge pre-closure charges. So you should not be losing anything due to pre-closure.
ii. Go for a 5 yr loan and let it to complete its tenure. But it is likely the last year's interest component might be too less and wont be anywhere near 1.5 lakhs.
In either ways it is good to close the home loan within 5 to 8 years. Because the IT rebate is not beneficial beyond a point when the interest component is less than 1.5 lakhs. So look at options where the interest component is more or around 1.5 lakhs for atleast 5 yrs.
I dont have the bank figures for EMI and the interest component spread across for option i and ii. It will be a good study.
I didnt actually ask the bank for a 5-year loan. All this while, I had only enquired for loan for site+construction so no idea about that. But even if the tenure is long, I can always sell the apartment and the buyer can take over the loan or preclose it, or however that whole arrangement is done you know.
Your digest options:
Basics Options:
Digest Frequency: Weekly
Digest Format: HTML
Hour sent: 15.5
Forums Selection Options:
Types of posts in digest: All posts
Post Filters Options:
Maximum number of posts in the digest: No limit
Minimum words required in post for the post to appear in a digest: No constraint
Show new posts only: No
Remove my posts: Yes
Remove posts from my foes: No
Show my private messages: Yes
Additional Criteria Options:
Post sort order: Use my board display preferences
Maximum words to display in a post: No limit
Send digest if no new messages: No
Reset my last visit date when I am sent a digest: Yes
Show attachments: Yes
Block images: No
Table of contents: Yes
The digest was published specifically for you on 31 Oct 2012, 15:30
This digest is being sent to registered members of mybdasites.com forums. You can change or delete your subscription from the User Control Panel. If you have questions or feedback on the format of this digest please send it to the mybdasites.com Webmaster.
Powered by phpBB Digests 2.2.19
No comments:
Post a Comment