myBDAsites.com Weekly Digest
Dear sojo,
Here is the latest digest of messages posted on myBDAsites.com forums. Please come and join the discussion!
Table of contents
Jump to | Private Message Subject | Sender | Date |
---|---|---|---|
You have no new or unread private messages. |
Jump to | Forum | Topic | Author | Date |
---|---|---|---|---|
22809 | General | Get ready for another round of Price Hike | msn1270 | 19 Jun 2013, 12:02 |
22806 | General | Telecom Layout(Green Field Gardens 1)- Is there any issue? | mail2vivek | 19 Jun 2013, 08:45 |
22796 | General | Can i buy a site under Due associates at hosa road | shabini | 18 Jun 2013, 14:11 |
22804 | General | Can i buy a site under Due associates at hosa road | kiran4924 | 18 Jun 2013, 22:38 |
22803 | General | EXCISE LAYOUT - IVC road near Devanahalli Airport | sanora600 | 18 Jun 2013, 22:22 |
22791 | General | Govt may hike guidance value, stamp duty Bangalore,=>DHNS | plotcrazy | 18 Jun 2013, 09:34 |
22783 | General | Do I need to make two seperate Agreements ? | mcnu | 17 Jun 2013, 22:41 |
22731 | General | Plot in Guni Agrahara with Hiland Reality | pratap_v | 14 Jun 2013, 03:56 |
22753 | General | Plot in Guni Agrahara with Hiland Reality | pratap_v | 14 Jun 2013, 22:30 |
22749 | General | Depreciation of a property | san0077 | 14 Jun 2013, 18:33 |
22726 | General | Site adjoining to Abhiman Studio -- Sapthagiri County | chshbt | 13 Jun 2013, 19:01 |
22739 | General | Site adjoining to Abhiman Studio -- Sapthagiri County | annappa | 14 Jun 2013, 10:34 |
22740 | General | Site adjoining to Abhiman Studio -- Sapthagiri County | biddappa_c_b | 14 Jun 2013, 11:39 |
22744 | General | Site adjoining to Abhiman Studio -- Sapthagiri County | annappa | 14 Jun 2013, 12:17 |
22714 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | civil88 | 13 Jun 2013, 11:39 |
22715 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | msn1270 | 13 Jun 2013, 11:58 |
22723 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | bdasites | 13 Jun 2013, 16:47 |
22743 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | biddappa_c_b | 14 Jun 2013, 12:14 |
22767 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | civil88 | 17 Jun 2013, 12:40 |
22770 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | biddappa_c_b | 17 Jun 2013, 14:01 |
22774 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | civil88 | 17 Jun 2013, 15:40 |
22775 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | msn1270 | 17 Jun 2013, 16:38 |
22778 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | pursh_bennur | 17 Jun 2013, 18:26 |
22779 | Regularisation | Frustrated for Bribe to be paid for Khata Transfer | civil88 | 17 Jun 2013, 20:23 |
22813 | Vishveshwariah | Site Loan required for B Katha Plot near Upkar Layout | RKalabhavi | 19 Jun 2013, 13:06 |
22815 | Vishveshwariah | Site Loan required for B Katha Plot near Upkar Layout | msn1270 | 19 Jun 2013, 14:51 |
22769 | Vishveshwariah | Numbering of sites | balumr | 17 Jun 2013, 13:31 |
22768 | Vishveshwariah | Any info on "Ashraya Block" inside SMVL block2..? | balumr | 17 Jun 2013, 12:57 |
22761 | Anjanapura - BDA | Anjanapur 2nd block developments | vinodkumar | 16 Jun 2013, 22:39 |
22719 | Anjanapura - BDA | Current Price at Anjanapura | gout | 13 Jun 2013, 14:12 |
22728 | Anjanapura - BDA | Current Price at Anjanapura | Bangalorian | 13 Jun 2013, 23:12 |
22709 | Anjanapura - BDA | Owners of Anjanapura layout | ab_bangalore | 13 Jun 2013, 09:13 |
22710 | Anjanapura - BDA | Owners of Anjanapura layout | Nagendra_81 | 13 Jun 2013, 10:13 |
22735 | BSK IV to VI BDA | BSK 5th Stage - Current price | brainfart | 14 Jun 2013, 08:50 |
22787 | Rate Table | Price near IFCI Finance City near BIAL | chinni_investor | 18 Jun 2013, 05:16 |
22794 | Bangalore East | Kristal Jasper off sarjapur road | mkesavap | 18 Jun 2013, 12:15 |
22742 | Bangalore East | KR Puram BDA site | kcschowdary1980 | 14 Jun 2013, 12:01 |
22694 | Bangalore East | Opal Shelters - BDA Layout - HirandaHalli, KR Puram | Sharath Kumar | 12 Jun 2013, 16:27 |
22713 | Bangalore East | Opal Shelters - BDA Layout - HirandaHalli, KR Puram | raghu_pro | 13 Jun 2013, 11:11 |
22716 | Bangalore East | Opal Shelters - BDA Layout - HirandaHalli, KR Puram | Sharath Kumar | 13 Jun 2013, 12:09 |
22741 | Bangalore East | Opal Shelters - BDA Layout - HirandaHalli, KR Puram | kcschowdary1980 | 14 Jun 2013, 11:53 |
22695 | Bangalore East | Kanakashree layout, Hennur | pragyan | 12 Jun 2013, 17:58 |
22697 | Bangalore West | BBMP Approved site in Nelamangala for sale | nspavan | 12 Jun 2013, 18:55 |
22758 | Bangalore West | BBMP Approved site in Nelamangala for sale | prasadhb | 15 Jun 2013, 16:04 |
22711 | Apartments | Bangalore Apartment prices falling down drastically... | msn1270 | 13 Jun 2013, 10:52 |
22757 | Apartments | Bangalore Apartment prices falling down drastically... | mybdaprop | 15 Jun 2013, 13:42 |
22704 | Apartments | Will Virtified Flooring Last longer if Tiles are bent | adrevol | 12 Jun 2013, 22:01 |
22790 | Civil Construction | PCC Mixing Method | sreekbda | 18 Jun 2013, 09:30 |
22814 | Civil Construction | PCC Mixing Method | tendlu | 19 Jun 2013, 13:19 |
22812 | Civil Construction | road cutting approval - online? timing? | tendlu | 19 Jun 2013, 13:02 |
22811 | Civil Construction | Plan Approval cost | tendlu | 19 Jun 2013, 12:54 |
22786 | Civil Construction | What does an AEH point mean (electrical)? | tendlu | 18 Jun 2013, 05:10 |
22799 | Civil Construction | What does an AEH point mean (electrical)? | aries31 | 18 Jun 2013, 14:32 |
22810 | Civil Construction | What does an AEH point mean (electrical)? | tendlu | 19 Jun 2013, 12:14 |
22802 | Civil Construction | Borewell experience | vpbs_bak | 18 Jun 2013, 22:09 |
22754 | Civil Construction | Skylight | maheshv | 14 Jun 2013, 22:46 |
22756 | Civil Construction | Skylight | sam_m400 | 15 Jun 2013, 11:08 |
22782 | Civil Construction | Skylight | maheshv | 17 Jun 2013, 22:39 |
22800 | Civil Construction | Skylight | Vimal | 18 Jun 2013, 18:38 |
22795 | Civil Construction | labour contract (plumbing) | Chandu | 18 Jun 2013, 13:53 |
22798 | Civil Construction | labour contract (plumbing) | rajuraikar | 18 Jun 2013, 14:24 |
22793 | Civil Construction | Cement flooring cost | justaknock | 18 Jun 2013, 12:10 |
22792 | Civil Construction | Marble laying cost | justaknock | 18 Jun 2013, 12:05 |
22734 | Civil Construction | Niki doors | sam_m400 | 14 Jun 2013, 08:12 |
22738 | Civil Construction | Niki doors | jackalbda | 14 Jun 2013, 09:37 |
22747 | Civil Construction | Niki doors | sam_m400 | 14 Jun 2013, 17:29 |
22751 | Civil Construction | Niki doors | jackalbda | 14 Jun 2013, 19:21 |
22752 | Civil Construction | Niki doors | maheshv | 14 Jun 2013, 22:29 |
22755 | Civil Construction | Niki doors | sam_m400 | 15 Jun 2013, 11:02 |
22781 | Civil Construction | Niki doors | maheshv | 17 Jun 2013, 22:38 |
22780 | Civil Construction | Having Window shutters with Sal wood? | yadavprabha | 17 Jun 2013, 20:28 |
22772 | Civil Construction | Polishing wooden door | sam_m400 | 17 Jun 2013, 14:56 |
22760 | Civil Construction | Borewell or Not | sachhi | 16 Jun 2013, 14:00 |
22750 | Civil Construction | What is current cost of fixing ready made doors/shutter? | sam_m400 | 14 Jun 2013, 18:34 |
22700 | Civil Construction | Borewell inspection by Camera | meharnath | 12 Jun 2013, 20:06 |
22712 | Civil Construction | Borewell inspection by Camera | Madhukar Gowda | 13 Jun 2013, 11:03 |
22725 | Civil Construction | Borewell inspection by Camera | sateeshpnv | 13 Jun 2013, 18:40 |
22722 | Civil Construction | Green Buildings | eCUBE | 13 Jun 2013, 15:40 |
22706 | Civil Construction | Shops for Plumbing and electrical materials | jayadas | 13 Jun 2013, 07:00 |
22717 | Civil Construction | Shops for Plumbing and electrical materials | niarhab | 13 Jun 2013, 12:25 |
22708 | Civil Construction | Engineered Acasia for Window/Door | kraghum | 13 Jun 2013, 08:49 |
22707 | Civil Construction | plumbing materials/water proof | jayadas | 13 Jun 2013, 07:14 |
22703 | Civil Construction | Laminated doors | Alok | 12 Jun 2013, 20:52 |
22698 | Civil Construction | ready mix concrete vs manual mix | yadavprabha | 12 Jun 2013, 19:01 |
22801 | Interiors | [Help] Gas Piping | sanker.gs | 18 Jun 2013, 19:05 |
22805 | Interiors | [Help] Gas Piping | maheshv | 18 Jun 2013, 23:02 |
22765 | Interiors | Common tile for Balcony, utility and parking | stone_cold | 17 Jun 2013, 11:49 |
22727 | Interiors | Woodwork for a newly constructed flat | avani9 | 13 Jun 2013, 22:18 |
22789 | Material prices -- Members only | Wall mounted or regular commode | Chandu | 18 Jun 2013, 09:16 |
22797 | Material prices -- Members only | Wall mounted or regular commode | aries31 | 18 Jun 2013, 14:24 |
22788 | Material prices -- Members only | Borewell Pump installation | vpbs_bak | 18 Jun 2013, 05:53 |
22776 | Material prices -- Members only | borewell pump | vpbs_bak | 17 Jun 2013, 16:43 |
22777 | Material prices -- Members only | borewell pump | vpbs_bak | 17 Jun 2013, 16:46 |
22773 | Material prices -- Members only | INDUS TMT Price in Bangalore | vinod.badnal | 17 Jun 2013, 15:33 |
22808 | Site for sale | Current rates in Upkar layout, Ullal for non-bda sites | sitequery | 19 Jun 2013, 08:58 |
22784 | Site for sale | 20*30 East facing plot for Sale at Anjanapura 5th G Blk | Bangalorian | 17 Jun 2013, 23:21 |
22746 | Site for sale | 30*40 SITE FPR SALE IN BANASHANKARI 6th STAGE 4th B BLOCK | mp123 | 14 Jun 2013, 14:46 |
22701 | Site for sale | Kanakashree layout - Kannur - 30x40 East facing | ranjanimehar | 12 Jun 2013, 20:15 |
22699 | Site for sale | 30*40BDA SITE FOR SALE IN BANASHANKARI 6th stage 4th H block | blrsiteseeker | 12 Jun 2013, 19:35 |
22807 | Site wanted | Telecome Green Field GFG-1, GFG-2 GFG-3 | mail2vivek | 19 Jun 2013, 08:52 |
22733 | Rental Available | 1 BHK available for rent near Hoskerhalli, BSK 3rd Stage | rajuraikar | 14 Jun 2013, 07:51 |
22702 | Apartment for sale | Cozy 3/5 BHK 12 unit Apartment (partyhall) - Kanakapura Road | meharnath | 12 Jun 2013, 20:34 |
22762 | Misc ads | architect(7yrs xprnce with startup firm looking for projects | rathod | 17 Jun 2013, 10:29 |
22732 | Layout Reviews | Need reviews on KNS Anirvan project.. | jaylohere | 14 Jun 2013, 07:24 |
22745 | Layout Reviews | Need reviews on KNS Anirvan project.. | ashishlukka | 14 Jun 2013, 13:29 |
22785 | Real Estate News | Akrama Sakrama - A reader's views (From ECOPACK) | blrsiteseeker | 18 Jun 2013, 01:59 |
Forum: General
Topic: Get ready for another round of Price Hike
One more punch.
In order to compensate the revenue spending towards the Newly Elected Govt's popular Rs. 1/Kg Rice program for the BPL Community(Vote Bank Funda), Now Govt has initated steps to increase the Guidance Value and the Reg & Stamp Duty charges. They may announce the same formally soon. This will make way for price rise in the Real estate assets & once again burden the Middle Class people.
Congress always makes Middle Class people life Hell.
In order to compensate the revenue spending towards the Newly Elected Govt's popular Rs. 1/Kg Rice program for the BPL Community(Vote Bank Funda), Now Govt has initated steps to increase the Guidance Value and the Reg & Stamp Duty charges. They may announce the same formally soon. This will make way for price rise in the Real estate assets & once again burden the Middle Class people.
Congress always makes Middle Class people life Hell.
Topic: Telecom Layout(Green Field Gardens 1)- Is there any issue?
Sir, what is current price in Green FIeld Garden 1 now? I found few ads in OLX where brokers are quoting somewhere between 1500-1700.
I feel we may get at lower price from direct owners.
I am planning to invest if the phase-1 issue is resolved.
I feel we may get at lower price from direct owners.
I am planning to invest if the phase-1 issue is resolved.
Topic: Can i buy a site under Due associates at hosa road
HI All,
Did anyone visited the layout recently?
Any progress within the layout and out side road?
Did anyone visited the layout recently?
Any progress within the layout and out side road?
I did visit the layout couple of weeks back. There has been no progress inside or outside the layout. In fact it had worsened because of the rain. I spoke to the security and he said there's no work being done at present. I only see cattle grazing inside the layout.
Topic: EXCISE LAYOUT - IVC road near Devanahalli Airport
I am also interested in buying one plot on IVC road please suggest any good layout in the range of 700-900sqft and no hassle on this.
Topic: Govt may hike guidance value, stamp duty Bangalore,=>DHNS
Reply: Govt may hike guidance value, stamp duty Bangalore,=>DHNS
friends
Thought of sharing this article FYI.Link below.
http://www.deccanherald.com/content/339 ... value.html
*******************************************************************************************************************************************************************************************************************************************
Govt may hike guidance value, stamp duty
Bangalore, June 17, 2013, DHNS:
The State government is likely to hike the guidance value across the State as well as stamp and registration duties to fund the numerous populist schemes it has announced in the recent weeks.
Revenue Minister V Sreenivas Prasad told presspersons here on Monday that the government is looking at these two avenues to fill the state coffers which currently cannot afford such heavy expenditure.
"The government has already announced certain schemes such as providing rice at Re one a kg, which will cost the exchequer not less than Rs 4,042 crore per year. There are other schemes such as loan waiver and increase in the subsidy for construction of houses under various schemes. All these require money, and for this we have to look at available options," he said.
The government will increase the guidance values across Karnataka and also contemplate on increasing the stamp and registration duties.
"These two options have always provided us good receipts. We will discuss the matter with commissioners and revenue officials at a meeting to be chaired by Chief Minister Siddaramaiah on Tuesday," he said.
However, what has gone unnoticed is the fact that the State cannot increase the stamp and registration duty from the current rate, which is five per cent of the property value, if they intend to avail funds under the Jawaharlal Nehru National Urban Renewal Mission (JnNURM). "The JnNURM recognises the adverse effects of high stamp duty rates. It requires the states to reduce the rates to five per cent or less (including the surcharge that civic bodies levy in several states). It expects that a reduction in the rate will help develop a healthy real estate market, provide fillip to the growth of the economy and reduce the size of black money."
The previous BJP government had reduced the stamp and registration duties from eight per cent to five per cent.
No land auction
Prasad said the Revenue department will henceforth ensure that revenue lands will not be auctioned to generate revenue. The department will fence these properties and protect them from encroachments. A meeting has been scheduled for discussing the encroachment issues with non-governmental organisations such as Samaja Parivartana Samudaya.
"We will also examine the A T Ramaswamy and V Balasubramniam reports to tackle the encroachment problem," he said.
The department has already sent a circular to all the deputy commissioners instructing them not to evict villagers who are residing on C and D category lands, handed over to the Forest department for afforestation programmes.
Pension scheme
The State government is also looking at expanding the monthly pension scheme of Rs 500 for incorporating those women who are unmarried and above the age of 40 years.
"We are also trying to convince the chief minister to extend the scheme to divorcee women, who have little economic opportunities in rural areas," the minister said.
These schemes will only cover the women who are from below poverty line families. The Revenue department is contemplating providing civic amenities to hamlets notwithstanding their status as revenue villages.
'Atalji name will continue'
Revenue Minister V Sreenivas Prasad said that there will be no change in the name of Nemmadi Kendras, which were renamed as Atalji Janasnehi Kendras by the previous BJP government. "There are a few tall leaders, cutting across party lines, who have contributed to the country's growth. Frankly speaking, I was also a minister at the Centre in the government headed by Atal Bihari Vajpayee. We will not change the new name given to the Nemmadi Kendras by the previous government," he said. There is a proposal to increase the number of Atalji Janasnehi Kendras in the state from 800 to 4,000, the minister added.
********************************************************************************************************************************************************************************************************************************************
Regards
PC
Thought of sharing this article FYI.Link below.
http://www.deccanherald.com/content/339 ... value.html
*******************************************************************************************************************************************************************************************************************************************
Govt may hike guidance value, stamp duty
Bangalore, June 17, 2013, DHNS:
The State government is likely to hike the guidance value across the State as well as stamp and registration duties to fund the numerous populist schemes it has announced in the recent weeks.
Revenue Minister V Sreenivas Prasad told presspersons here on Monday that the government is looking at these two avenues to fill the state coffers which currently cannot afford such heavy expenditure.
"The government has already announced certain schemes such as providing rice at Re one a kg, which will cost the exchequer not less than Rs 4,042 crore per year. There are other schemes such as loan waiver and increase in the subsidy for construction of houses under various schemes. All these require money, and for this we have to look at available options," he said.
The government will increase the guidance values across Karnataka and also contemplate on increasing the stamp and registration duties.
"These two options have always provided us good receipts. We will discuss the matter with commissioners and revenue officials at a meeting to be chaired by Chief Minister Siddaramaiah on Tuesday," he said.
However, what has gone unnoticed is the fact that the State cannot increase the stamp and registration duty from the current rate, which is five per cent of the property value, if they intend to avail funds under the Jawaharlal Nehru National Urban Renewal Mission (JnNURM). "The JnNURM recognises the adverse effects of high stamp duty rates. It requires the states to reduce the rates to five per cent or less (including the surcharge that civic bodies levy in several states). It expects that a reduction in the rate will help develop a healthy real estate market, provide fillip to the growth of the economy and reduce the size of black money."
The previous BJP government had reduced the stamp and registration duties from eight per cent to five per cent.
No land auction
Prasad said the Revenue department will henceforth ensure that revenue lands will not be auctioned to generate revenue. The department will fence these properties and protect them from encroachments. A meeting has been scheduled for discussing the encroachment issues with non-governmental organisations such as Samaja Parivartana Samudaya.
"We will also examine the A T Ramaswamy and V Balasubramniam reports to tackle the encroachment problem," he said.
The department has already sent a circular to all the deputy commissioners instructing them not to evict villagers who are residing on C and D category lands, handed over to the Forest department for afforestation programmes.
Pension scheme
The State government is also looking at expanding the monthly pension scheme of Rs 500 for incorporating those women who are unmarried and above the age of 40 years.
"We are also trying to convince the chief minister to extend the scheme to divorcee women, who have little economic opportunities in rural areas," the minister said.
These schemes will only cover the women who are from below poverty line families. The Revenue department is contemplating providing civic amenities to hamlets notwithstanding their status as revenue villages.
'Atalji name will continue'
Revenue Minister V Sreenivas Prasad said that there will be no change in the name of Nemmadi Kendras, which were renamed as Atalji Janasnehi Kendras by the previous BJP government. "There are a few tall leaders, cutting across party lines, who have contributed to the country's growth. Frankly speaking, I was also a minister at the Centre in the government headed by Atal Bihari Vajpayee. We will not change the new name given to the Nemmadi Kendras by the previous government," he said. There is a proposal to increase the number of Atalji Janasnehi Kendras in the state from 800 to 4,000, the minister added.
********************************************************************************************************************************************************************************************************************************************
Regards
PC
Topic: Do I need to make two seperate Agreements ?
Reply: Do I need to make two seperate Agreements ?
Hi'
I am buying an apartment which belongs to landowner's share. SBI has asked to create 2 seperate agreements :- Construction agreement & Sale Agreement.
Can I create 2 agreements because this is a Landowner's share of flat and not the builder's share of flat..??
I am buying an apartment which belongs to landowner's share. SBI has asked to create 2 seperate agreements :- Construction agreement & Sale Agreement.
Can I create 2 agreements because this is a Landowner's share of flat and not the builder's share of flat..??
Topic: Plot in Guni Agrahara with Hiland Reality
Reply: Plot in Guni Agrahara with Hiland Reality
Hi all,
I am planning to buy a plot in Guni Agrahara(Near M S Palya, 5km from BEL circle) with Hiland Reality developers. They say it is a DC-converted A-quota land comes for 1200/- per Sqft. Also they say that it cannot be approved by BDA/BIAPPA as the plot area is less than 3 acres. I am interested in it as it is close to Bangalore city compared to Devanahalli. But this is my first plot and would like to hear from the experienced.
Did anyone bought plot with Hiland Reality before? Please let me know if they are trust worthy?
Is it a correct decision to buy a plot there? Will there be any development later? I don't see any development right now, though I see few Villas coming near the plot.
Thanks in advance
I am planning to buy a plot in Guni Agrahara(Near M S Palya, 5km from BEL circle) with Hiland Reality developers. They say it is a DC-converted A-quota land comes for 1200/- per Sqft. Also they say that it cannot be approved by BDA/BIAPPA as the plot area is less than 3 acres. I am interested in it as it is close to Bangalore city compared to Devanahalli. But this is my first plot and would like to hear from the experienced.
Did anyone bought plot with Hiland Reality before? Please let me know if they are trust worthy?
Is it a correct decision to buy a plot there? Will there be any development later? I don't see any development right now, though I see few Villas coming near the plot.
Thanks in advance
Any suggestions are welcome. Waiting eagerly for your expert opinions.
Topic: Depreciation of a property
The depreciation value of the Independent house will be based on the construction quality. An Architect designed and monitored construction will have lower depreciation when compared to an unknown contractor built house. Apartment will also vary based on the builder and the built quality. you need to approach a valuer to get a figure. He will have his own parameters to valuate the house or apartment.
San
San
Topic: Site adjoining to Abhiman Studio -- Sapthagiri County
Hello All,
Please let me know if there are any plots up for sale.
Thanks
Chandrashekar
Please let me know if there are any plots up for sale.
Thanks
Chandrashekar
Iam interested in buying site at Sapthagiri county. Please reach me out if any body selling, My contact no. 9900579617. Also pls let me know if you know any re sellers.
-Annappa
-Annappa
Hi All,
I bought my site via a real estate agent. His name is Srinivas and his contact number is 9900112765. I am not marketing him but trying to help folks who want to buy and construct a house here. I too am planning to construct in a couple of months.
cheers
I bought my site via a real estate agent. His name is Srinivas and his contact number is 9900112765. I am not marketing him but trying to help folks who want to buy and construct a house here. I too am planning to construct in a couple of months.
cheers
Thanks Biddappa
Forum: Regularisation
Topic: Frustrated for Bribe to be paid for Khata Transfer
Hi,
Mr. Biddappa, many of the right-thinking educated people who do not wish to get their jobs done at Govt offices by paying bribes are following this thread with lot of enthusiasm. On behalf of our breed of people, I just want to say one thing. Please carry on your fight, and do not give up!
I am also having a site for which I have not applied for Khata transfer yet, as I did not want to go the bribe route. Being a non-local to Karnataka, many of us fear to approach any Govt Office in Karnataka. With my limited exposure to RTO offices, I find that they target non-locals, especially if we cannot speak kannada, and are very adamant in being non-cooperative if we don't pay bribe. In this regard, I just want to narrate my experience briefly.
My wife has appeared for DL at Indira nagar RTO and she failed the test as she could not park the car in 'L' shape in reverse. Since it was a genuine case, we appeared again, after doing lot of practice. To our surprise, she was failed again, though she did park correctly. Then I came to know that there is a rule that an applicant cannot be failed for more than 2 times, unless he/she is severely incompetent. So the third time she cleared. True, that I could have got this job done by paying 2K to a broker, and not endured 3 half-day leaves to my office. But by taking this route, at least I got the ethical satisfaction that I could get my job done without paying a rupee to the RTO office guys / brokers.
What I am trying to say is that, in these times of Bangalore being touted as the IT capital, it is unfortunate that the Govt offices are so notorious for corruption. With the help of many Citizen-friendly practices like RTI, Sakala etc, let us all fight this menace and get our jobs done in a fair way.
Mr. Biddappa, many of the right-thinking educated people who do not wish to get their jobs done at Govt offices by paying bribes are following this thread with lot of enthusiasm. On behalf of our breed of people, I just want to say one thing. Please carry on your fight, and do not give up!
I am also having a site for which I have not applied for Khata transfer yet, as I did not want to go the bribe route. Being a non-local to Karnataka, many of us fear to approach any Govt Office in Karnataka. With my limited exposure to RTO offices, I find that they target non-locals, especially if we cannot speak kannada, and are very adamant in being non-cooperative if we don't pay bribe. In this regard, I just want to narrate my experience briefly.
My wife has appeared for DL at Indira nagar RTO and she failed the test as she could not park the car in 'L' shape in reverse. Since it was a genuine case, we appeared again, after doing lot of practice. To our surprise, she was failed again, though she did park correctly. Then I came to know that there is a rule that an applicant cannot be failed for more than 2 times, unless he/she is severely incompetent. So the third time she cleared. True, that I could have got this job done by paying 2K to a broker, and not endured 3 half-day leaves to my office. But by taking this route, at least I got the ethical satisfaction that I could get my job done without paying a rupee to the RTO office guys / brokers.
What I am trying to say is that, in these times of Bangalore being touted as the IT capital, it is unfortunate that the Govt offices are so notorious for corruption. With the help of many Citizen-friendly practices like RTI, Sakala etc, let us all fight this menace and get our jobs done in a fair way.
Dear civil88,
would you like to isolate yourselves and live here as an Non-local forever??
When you landed here for your livelihood, you did not knew Kannada language is very much acceptable.
After living here for several years, if you do not make an attempt to learn the language of the land
and go alongwith everyone, I say, you've serious reservations and its your own fault.
FYI, for a bribe taker, religion, gender, language, age...etc doesn't make any difference. Forget about
Govt office, even the flower, vegetable vendor and autowallah's will exploit you as long as you are living
in a reserved well.
Simple example is whenever anyone calls an auto in north and east bangalore from ORR limit(Electronicity,
whitefield, Marathalli, Banaswadi, nagawara especially wherever IT Parks are there), Autodriver's never put
meter. They have their own fixed fare based on the areas, which is always 3 times more than the actual meter
fare.
would you like to isolate yourselves and live here as an Non-local forever??
When you landed here for your livelihood, you did not knew Kannada language is very much acceptable.
After living here for several years, if you do not make an attempt to learn the language of the land
and go alongwith everyone, I say, you've serious reservations and its your own fault.
FYI, for a bribe taker, religion, gender, language, age...etc doesn't make any difference. Forget about
Govt office, even the flower, vegetable vendor and autowallah's will exploit you as long as you are living
in a reserved well.
Simple example is whenever anyone calls an auto in north and east bangalore from ORR limit(Electronicity,
whitefield, Marathalli, Banaswadi, nagawara especially wherever IT Parks are there), Autodriver's never put
meter. They have their own fixed fare based on the areas, which is always 3 times more than the actual meter
fare.
want to delete my post but cant find the option
Guys am so happy that this thread is pulling folks who do not want to pay bribe. Please do inform others too so that we can help the others with our experience.
What we can do is, as most of us are from different areas in Bangalore, each of us can tell us our experience, how we fought the same and who would be the POC for each escalation. This would help folks to fight the right way and know whom to approach if not done within stipulated time.
Why did I tell the above? Many of the folks who replied back to me in this thread were kind enough to point me to the right people. I did the following:
1. Lodged a complaint in Sakala
2. Approached the DC of RR nagar and poured out my woes (this was suggested by one of the members)
3. There is an awesome wensite called ipaidbribe I lodged a complaint there. This was then passed by the website owners to the media and the relevant Govt offices. This website is awesome guys.
Sakala has a wait period of 30 days, mine is still in 16th day but did nit get any reply from Sakala folks.
Approached the DC, what a superman he is. Then Ipaidbribe website.
I am finally seeing light at the end of the tunnel. The ARO called me yesterday and told me that she will get my Khata done today. I will see how it goes and then provide you all the details tomorrow. I know many may think I am writing stories but I feel it helps. With regards to any corruption in BBMP Kengeri office I can tell you folks whom to approach. More in coming days.
Thanks in advance for all those who have helped me till date. Please spread the word.
What we can do is, as most of us are from different areas in Bangalore, each of us can tell us our experience, how we fought the same and who would be the POC for each escalation. This would help folks to fight the right way and know whom to approach if not done within stipulated time.
Why did I tell the above? Many of the folks who replied back to me in this thread were kind enough to point me to the right people. I did the following:
1. Lodged a complaint in Sakala
2. Approached the DC of RR nagar and poured out my woes (this was suggested by one of the members)
3. There is an awesome wensite called ipaidbribe I lodged a complaint there. This was then passed by the website owners to the media and the relevant Govt offices. This website is awesome guys.
Sakala has a wait period of 30 days, mine is still in 16th day but did nit get any reply from Sakala folks.
Approached the DC, what a superman he is. Then Ipaidbribe website.
I am finally seeing light at the end of the tunnel. The ARO called me yesterday and told me that she will get my Khata done today. I will see how it goes and then provide you all the details tomorrow. I know many may think I am writing stories but I feel it helps. With regards to any corruption in BBMP Kengeri office I can tell you folks whom to approach. More in coming days.
Thanks in advance for all those who have helped me till date. Please spread the word.
Hi Biddappa,
Very happy to know that you are seeing some positive signs after fighting what seemed to be a losing battle not too long ago.
I liked your idea of forming groups to fight the establishment. Since this thread is about Khata transfer, we can make this as a Starting Point for this campaign. Let all the people who are planning to get Khata done pitch in with their details and we can then proceed from there.
Very happy to know that you are seeing some positive signs after fighting what seemed to be a losing battle not too long ago.
I liked your idea of forming groups to fight the establishment. Since this thread is about Khata transfer, we can make this as a Starting Point for this campaign. Let all the people who are planning to get Khata done pitch in with their details and we can then proceed from there.
Thanks civil. Make sure we all direct the queries on Khata transfer or rather if anyone is bogged down with bribe for Khata Transfer.
Update Guys: I GOT THE KHATA TRANSFERRED INTO MY NAME.....YAHOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
Firstly thank you one and all. Truely appreciate all your help. You are the real heros to guide me through. Your guidance is invaluable. With my success it shows that group can have a major influence.
How I got through the Ordeal:
1. Got advise to do the following:
a) Get Sakala into the picture
b) get everything in writing (endorsement, thats what it is called)
c) Do a couple of follow ups(I know you will say we are all busy, go on a saturday, that should be ok, or once in a while send a representative from your side).
d) Log all the details
e) meet the JC
2. Did the below:
a) Called Sakala and raised a docket number.
b) Contacted ARO, RI and Caseworker a couple of times. Noted all the details. Actually I wrote down all these in this forum
c) I also tried to call TV9 and Suvarna news, Suvarna news replied back on Facebook with the bumbers but no response from their side.
d) I came across a website called ipaidbribe.com. HIGHLY RECOMMENDED. Once I lodged a complaint I go a call from BBMP control room the next day. AWESOME.
e) I called up BBMP control room.They told me to lodge a complaint.
f) Now the key here is, or I was lucky, I got the contact of RRNagar BBMP Office, the Joint Commissioner or Divisional COmmissioner's number. I called their office and they told me to come over.
g) Mr. Ravikumar, the secretary for DC Ramesh Kumar (RR nagar) got an appointment for me. Mr. Ramesh Kumar (I respect this person a lot now), called me and asked me what the issue was and told me to meet him.
h) I met him and poured out all my woes.
i) Within 3 days I got my Khata.
What I learnt:
1. Wait for the stipulated time (30 days)
2. Get Sakala number.
3. If you do not get these working, see which BBMP office JC/DC is responsible for the area and give a written complaint. Please do this as a last step if nothing works out.
In this corrupt ocean of Govt Employees , Mr. RaviKumar and Mr Ramesh Kumar(BBMP RR nagar office) came as saviours. A big THUMBS UP for these 2 gentleman.
cheers
Update Guys: I GOT THE KHATA TRANSFERRED INTO MY NAME.....YAHOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOOO
Firstly thank you one and all. Truely appreciate all your help. You are the real heros to guide me through. Your guidance is invaluable. With my success it shows that group can have a major influence.
How I got through the Ordeal:
1. Got advise to do the following:
a) Get Sakala into the picture
b) get everything in writing (endorsement, thats what it is called)
c) Do a couple of follow ups(I know you will say we are all busy, go on a saturday, that should be ok, or once in a while send a representative from your side).
d) Log all the details
e) meet the JC
2. Did the below:
a) Called Sakala and raised a docket number.
b) Contacted ARO, RI and Caseworker a couple of times. Noted all the details. Actually I wrote down all these in this forum
c) I also tried to call TV9 and Suvarna news, Suvarna news replied back on Facebook with the bumbers but no response from their side.
d) I came across a website called ipaidbribe.com. HIGHLY RECOMMENDED. Once I lodged a complaint I go a call from BBMP control room the next day. AWESOME.
e) I called up BBMP control room.They told me to lodge a complaint.
f) Now the key here is, or I was lucky, I got the contact of RRNagar BBMP Office, the Joint Commissioner or Divisional COmmissioner's number. I called their office and they told me to come over.
g) Mr. Ravikumar, the secretary for DC Ramesh Kumar (RR nagar) got an appointment for me. Mr. Ramesh Kumar (I respect this person a lot now), called me and asked me what the issue was and told me to meet him.
h) I met him and poured out all my woes.
i) Within 3 days I got my Khata.
What I learnt:
1. Wait for the stipulated time (30 days)
2. Get Sakala number.
3. If you do not get these working, see which BBMP office JC/DC is responsible for the area and give a written complaint. Please do this as a last step if nothing works out.
In this corrupt ocean of Govt Employees , Mr. RaviKumar and Mr Ramesh Kumar(BBMP RR nagar office) came as saviours. A big THUMBS UP for these 2 gentleman.
cheers
CONGRATS Biddappa!!!
It is a massive achievement not only for you, but for all the people like us, who now wants to follow your footsteps (Or is it the 3 steps, you gave in the end - 30 days > sakala > JC/DC).
It took you more than 100 days (you first posted here on 23rd march) and countless visits to the Govt office(s). Does not matter. In the end, what matters is that YOU DID IT and we are all proud of you for that.
Please Edit the Subject/Title of this thread to reflect that you have succeeded after your rigorous ordeal.
All the Best to the Rest who would be registering for Khata Transfer on their own, without paying a single Rupee!!!
It is a massive achievement not only for you, but for all the people like us, who now wants to follow your footsteps (Or is it the 3 steps, you gave in the end - 30 days > sakala > JC/DC).
It took you more than 100 days (you first posted here on 23rd march) and countless visits to the Govt office(s). Does not matter. In the end, what matters is that YOU DID IT and we are all proud of you for that.
Please Edit the Subject/Title of this thread to reflect that you have succeeded after your rigorous ordeal.
All the Best to the Rest who would be registering for Khata Transfer on their own, without paying a single Rupee!!!
Hey Congrats Biddappa
YOU ARE A ROLE MODEL FOR 100's OF PEOPLE.!!!!
YOU ARE A ROLE MODEL FOR 100's OF PEOPLE.!!!!
Congrats Biddappa!!!!! Its really a motivating story in itself and also a achievement to be chrerished and shared among my friends ....... I feel these SAKALA & RTI are the most powerful weapons of today's Modern India which if we use in right direction and patiently we will get the results!!!!
I am planning to use them in getting a street lights to my road in my Native city!!
I am planning to use them in getting a street lights to my road in my Native city!!
Hi Biddappa,
I forgot to ask you, did you face any issues in securing the Sakala Number as such? For the benefit of prospective applicants, can you tell us what are the requisites for applying for a Sakala Number. I have seen the website of state govt for Sakala (http://www.kgsc.kar.nic.in/gsc_home.aspx#), but I wanted to know the First Hand Info from someone who has practically gone through the process.
I forgot to ask you, did you face any issues in securing the Sakala Number as such? For the benefit of prospective applicants, can you tell us what are the requisites for applying for a Sakala Number. I have seen the website of state govt for Sakala (http://www.kgsc.kar.nic.in/gsc_home.aspx#), but I wanted to know the First Hand Info from someone who has practically gone through the process.
Forum: Vishveshwariah
Topic: Site Loan required for B Katha Plot near Upkar Layout
Reply: Site Loan required for B Katha Plot near Upkar Layout
Hi All,
We have seen and decided to purchase a 'B' Katha site near Upkar Layout, but we are having concerns now that most of the banks (Nationalized & Private) are no more giving loans for B Katha sites. We have also made the documents verified and its good to go, but only thing is we are not getting loans anywhere.
Hence can anyone please suggest or refer where can I get loan for B Katha site. It will much helpful and appreciated.
Thanks in advance,
Ravi
Email: chandra.ravi.b.k@gmail.com
We have seen and decided to purchase a 'B' Katha site near Upkar Layout, but we are having concerns now that most of the banks (Nationalized & Private) are no more giving loans for B Katha sites. We have also made the documents verified and its good to go, but only thing is we are not getting loans anywhere.
Hence can anyone please suggest or refer where can I get loan for B Katha site. It will much helpful and appreciated.
Thanks in advance,
Ravi
Email: chandra.ravi.b.k@gmail.com
chances are very less.
if you have good rapport with any of the co-operative banks,
you can get by giving any collateral guarantee. Else you need
to look for personal loan. In either of the case, interest rate
will be more.
if you have good rapport with any of the co-operative banks,
you can get by giving any collateral guarantee. Else you need
to look for personal loan. In either of the case, interest rate
will be more.
Topic: Numbering of sites
Hi ,
Sorry for deviating the topic but i wanted one info.
Can you please let me know what is the "Layout" and "sublayout" i should select in the bda online payment portal to select a site in smvl 2nd block 2..?
Sorry for deviating the topic but i wanted one info.
Can you please let me know what is the "Layout" and "sublayout" i should select in the bda online payment portal to select a site in smvl 2nd block 2..?
Topic: Any info on "Ashraya Block" inside SMVL block2..?
Reply: Any info on "Ashraya Block" inside SMVL block2..?
Hi all,
Does anybody has info on "Vacant area" adjacent to 80ft road in Block2 which is "Not allocated" to anybody and showing as "Ashraya block" in the layout plan next to the proposed fire station..? Any idea why it is not allocated to anybody and what might come over there in future..?
Appreciate if anybody can provide more details on the same.
Does anybody has info on "Vacant area" adjacent to 80ft road in Block2 which is "Not allocated" to anybody and showing as "Ashraya block" in the layout plan next to the proposed fire station..? Any idea why it is not allocated to anybody and what might come over there in future..?
Appreciate if anybody can provide more details on the same.
Forum: Anjanapura - BDA
Topic: Anjanapur 2nd block developments
hi all,
good to see developments around anjanapura 2 block, even I am having site in 2 block. I am thinking of constructing g+1 house for rent purpose. hence kindly guide me whether tenants will be available for renting houses , thanking u,
vinod kumar
good to see developments around anjanapura 2 block, even I am having site in 2 block. I am thinking of constructing g+1 house for rent purpose. hence kindly guide me whether tenants will be available for renting houses , thanking u,
vinod kumar
Topic: Current Price at Anjanapura
Around Rs 3000 / sqft.
Thx gout.
Topic: Owners of Anjanapura layout
Hi gowda_sree,
I have recently purchased a plot in 2nd A Block, Anjanapura.
Can i join the association?
Let me know the procedure to join & i would like to participate actively in this.
Regards
~Ajay
I have recently purchased a plot in 2nd A Block, Anjanapura.
Can i join the association?
Let me know the procedure to join & i would like to participate actively in this.
Regards
~Ajay
Hello Ajay,
I am curious to know the current rates in 2nd block. How much did you have to pay per sq/ft for your new plot ?
Thanks,
Nagendra
I am curious to know the current rates in 2nd block. How much did you have to pay per sq/ft for your new plot ?
Thanks,
Nagendra
Forum: BSK IV to VI BDA
Topic: BSK 5th Stage - Current price
should be ~5500 to 6000 sqft
Forum: Rate Table
Topic: Price near IFCI Finance City near BIAL
Reply: Price near IFCI Finance City near BIAL
Hi
Please let me know square feet price of sites 5 kms near IFCI Finance city BIAL
Also appreciate if you have idea pls let me know how would be appreciation would be in near future
Thanks
Sindhuri
Please let me know square feet price of sites 5 kms near IFCI Finance city BIAL
Also appreciate if you have idea pls let me know how would be appreciation would be in near future
Thanks
Sindhuri
Forum: Bangalore East
Topic: Kristal Jasper off sarjapur road
Reply: Kristal Jasper off sarjapur road
Hi,
Pls share feedback about Kristal Jasper community on Kasavanahalli road.
Heard it is a panchayat approved project; but independent houses in this commnuity has obtained A-Khata. Not sure about common assets such as roads and club-house.
Is it worth going for a re-sale property in that community?
Thanks in advance.
Pls share feedback about Kristal Jasper community on Kasavanahalli road.
Heard it is a panchayat approved project; but independent houses in this commnuity has obtained A-Khata. Not sure about common assets such as roads and club-house.
Is it worth going for a re-sale property in that community?
Thanks in advance.
Topic: KR Puram BDA site
Hi Hkrish,
Can you share your inputs on projects in KR PURAM - HOSAKOTE area for 30x40 plots for immediate construction. i heard Opal shelters launched BDA layout in Hirandahalli .. any idea on this project?I am looking for 30x40 plot with bank loan in this area.
thanks
Chandu
Can you share your inputs on projects in KR PURAM - HOSAKOTE area for 30x40 plots for immediate construction. i heard Opal shelters launched BDA layout in Hirandahalli .. any idea on this project?I am looking for 30x40 plot with bank loan in this area.
thanks
Chandu
Topic: Opal Shelters - BDA Layout - HirandaHalli, KR Puram
Reply: Opal Shelters - BDA Layout - HirandaHalli, KR Puram
Hi,
I have recently heard about Opal Shelters-BDA layout, located near HirandaHalli, KR Pumam. Launch of phase 1 (18 Acers) has been announced.
The laout is spread accross 40 acers. Nearest land mark is East Point Collage. The builder is KR Build Tech - Cheemasandra, Vigro Nagar Post, Old Madras road, Bangalore - 560049.
The builder is quoting following rates as per plot facing. Wanted to know, the prevailing price in this area. What ever price is quoted is it resonable?
North facing : 3250/sft
South Facing: 3000/sft
West Facing : 3000/sft
East Facing: 3250/sft
NE corner: 4000/sft
Rest of the corners:3900/sft
Regards
S Kumar
I have recently heard about Opal Shelters-BDA layout, located near HirandaHalli, KR Pumam. Launch of phase 1 (18 Acers) has been announced.
The laout is spread accross 40 acers. Nearest land mark is East Point Collage. The builder is KR Build Tech - Cheemasandra, Vigro Nagar Post, Old Madras road, Bangalore - 560049.
The builder is quoting following rates as per plot facing. Wanted to know, the prevailing price in this area. What ever price is quoted is it resonable?
North facing : 3250/sft
South Facing: 3000/sft
West Facing : 3000/sft
East Facing: 3250/sft
NE corner: 4000/sft
Rest of the corners:3900/sft
Regards
S Kumar
hi,
can you give some more details like exact location, developers website address etc..
can you give some more details like exact location, developers website address etc..
Hi Raghu,
Exactly the layout is located beyond EAST Point Collage. The area is called Hirandahalli. If you search in google maps you will get it. Look for East point collage.
Reagrds
S Kumar
Exactly the layout is located beyond EAST Point Collage. The area is called Hirandahalli. If you search in google maps you will get it. Look for East point collage.
Reagrds
S Kumar
Hi Sharath,can you share the contact numbers of this project builders plzz
Topic: Kanakashree layout, Hennur
skndr wrote:Hi
The very good news to all kannur layout site owners is GPA ISSUE IS SOLVED AND DEED OF CONFORMATION IS DONE.
This is wat sources news. At the same time I would congra the president for honest reciprocation n commitment to resolve
ISsue.
Lets hope for all the best.
Hi skndr,
Its good to hear the GPA issue is resolved, Do we get a copy of it as individual site owners. Any info on this would be useful.
Guys Any info on forming an association.
Forum: Bangalore West
Topic: BBMP Approved site in Nelamangala for sale
Reply: BBMP Approved site in Nelamangala for sale
Sale, 30'x40' North facing bbmp apprd site at vamsi garden, nelamangala. Clear title. SBI bank approved.
Expected price 1100/sqft. Please contact 9900802827 (pavan).
Expected price 1100/sqft. Please contact 9900802827 (pavan).
Hi Pavan,
How can you get BBMP approval for a plot which is situated in Nelamangala?
Can you mention the exact landmark to this plot?
Prasad
9900245072
How can you get BBMP approval for a plot which is situated in Nelamangala?
Can you mention the exact landmark to this plot?
Prasad
9900245072
Forum: Apartments
Topic: Bangalore Apartment prices falling down drastically...
Raghu
U need to dig some more info before calling these two instances are justifying factor. Why the Same guys get several lakhs of applications from the same middle class people for their Layout projects, not for their Apartment projects.
1) People doesn't have confidence on BDA/KHB delivering Quality assets. Last time KHB Project from Shirke builders(so called premium project executed by a private builder) near kengeri is also not up to the mark and many people who bought are cribbing now.
2) Same situation from the people who bought near Yelahanka also or in the national Games village in koramangala. Even now many flats are unsold in this project despite reducing the prices several times.
3) BDA is charging around Rs. 3,000/sq.ft and KHB @ 3,200/sq.ft excluding car parking and all other deposits and statutory charges & Registration. When you include other charges it goes to Rs. 3,700 to 4,000.
4) Many of the areas they've identified for the project is not worth as of now for the price they are demanding or doesn't have good connectivity. Also in these projects, you don't have choice of choosing a unit of your choice. It will be on the lottery basis or with Ministry/Muscle/Money power. Do you think prople are stupid to invest on BDA/KHB apartments at that price, that too for highrise buildings ?
5) Malagala(Nagarabhavi) which is very near to the city centre, supposed to be a descent location where middleclass people preffers and such an asset sells like Hot Cake. But scrap people have planned only 1 BHK project of around 380 sq.ft meant for EWS section, which will be going nothing But a Slum. This shows the vision and mission of the Planning authority in the depts.
on the other side Provident housing(Puravankara Builder Sister Co) which is making so called affordable flats on mysore road near R.V College rised their property price by 2 lakhs from June first week, which means still he has lot of enquiries for his project or able to sustain his business.
U need to dig some more info before calling these two instances are justifying factor. Why the Same guys get several lakhs of applications from the same middle class people for their Layout projects, not for their Apartment projects.
1) People doesn't have confidence on BDA/KHB delivering Quality assets. Last time KHB Project from Shirke builders(so called premium project executed by a private builder) near kengeri is also not up to the mark and many people who bought are cribbing now.
2) Same situation from the people who bought near Yelahanka also or in the national Games village in koramangala. Even now many flats are unsold in this project despite reducing the prices several times.
3) BDA is charging around Rs. 3,000/sq.ft and KHB @ 3,200/sq.ft excluding car parking and all other deposits and statutory charges & Registration. When you include other charges it goes to Rs. 3,700 to 4,000.
4) Many of the areas they've identified for the project is not worth as of now for the price they are demanding or doesn't have good connectivity. Also in these projects, you don't have choice of choosing a unit of your choice. It will be on the lottery basis or with Ministry/Muscle/Money power. Do you think prople are stupid to invest on BDA/KHB apartments at that price, that too for highrise buildings ?
5) Malagala(Nagarabhavi) which is very near to the city centre, supposed to be a descent location where middleclass people preffers and such an asset sells like Hot Cake. But scrap people have planned only 1 BHK project of around 380 sq.ft meant for EWS section, which will be going nothing But a Slum. This shows the vision and mission of the Planning authority in the depts.
on the other side Provident housing(Puravankara Builder Sister Co) which is making so called affordable flats on mysore road near R.V College rised their property price by 2 lakhs from June first week, which means still he has lot of enquiries for his project or able to sustain his business.
One very good thing which has happened recently to bring down price is Govt of India Real Estate bill is accepted in parliament..
Summary of Real Estate bill
1. Bring down all black money in real estate
2. Builder is supposed to sell only CArpet Area and not super built up area
3. Builder will be put to jail for 3 years if he delay project construction
4. Builder is supposed to get all approvals in place before selling its flats/plots
5. Builder is supposed to put 70% of total project cost in one account and he should not use one project fund to other project..
6. This is a great bill , finally Indian Govt making some benefit to home buyers .. now builder cannot eat the 30% chargerable waste area as he has to sell only carpet area...
Summary of Real Estate bill
1. Bring down all black money in real estate
2. Builder is supposed to sell only CArpet Area and not super built up area
3. Builder will be put to jail for 3 years if he delay project construction
4. Builder is supposed to get all approvals in place before selling its flats/plots
5. Builder is supposed to put 70% of total project cost in one account and he should not use one project fund to other project..
6. This is a great bill , finally Indian Govt making some benefit to home buyers .. now builder cannot eat the 30% chargerable waste area as he has to sell only carpet area...
Topic: Will Virtified Flooring Last longer if Tiles are bent
Reply: Will Virtified Flooring Last longer if Tiles are bent
Hello Mods,
We have finalized to go for Virtified tiles but some how I still do have couple of questions running my mind, which I want to get clear them off, So that I can go with peace of mind.
Can you please answer my queries with respect to the virtified flooring :
1. Is it Ok if virtified tiles have bend in them ?
2. Will the Flooring last longer if few of the tiles have Bent and still we lay them?
3. Do we need to explicitly add an extra chemical solution to avoid air gaps while laying?
4. Will the Airgaps cause any issues in future, like breakage or disturbance in surface level?
5. Does it make any difference between Double charged or Nano Tech ?
6. Will the Tiles dealer allow us to do the Marker Test?
7. Advantages or disadvantages of opting for 80cmx80cm tiles vs 2'x2' tiles
Apart from the above questions, I have been told by some one that Kajaria Tiles will have More Bend when compare to other companies, Is it True? if so which brand I can prefer?
Last but not least , can you please let me know the order of preference to opt for the Brand and Best place to buy in bangalore.
I agree that these are not couple of questions but are many , But Hope that this Thread will definitely help others who are opting for Virtified tiles for Flooring in future.
Thank you in advance.
We have finalized to go for Virtified tiles but some how I still do have couple of questions running my mind, which I want to get clear them off, So that I can go with peace of mind.
Can you please answer my queries with respect to the virtified flooring :
1. Is it Ok if virtified tiles have bend in them ?
2. Will the Flooring last longer if few of the tiles have Bent and still we lay them?
3. Do we need to explicitly add an extra chemical solution to avoid air gaps while laying?
4. Will the Airgaps cause any issues in future, like breakage or disturbance in surface level?
5. Does it make any difference between Double charged or Nano Tech ?
6. Will the Tiles dealer allow us to do the Marker Test?
7. Advantages or disadvantages of opting for 80cmx80cm tiles vs 2'x2' tiles
Apart from the above questions, I have been told by some one that Kajaria Tiles will have More Bend when compare to other companies, Is it True? if so which brand I can prefer?
Last but not least , can you please let me know the order of preference to opt for the Brand and Best place to buy in bangalore.
I agree that these are not couple of questions but are many
Thank you in advance.
Forum: Civil Construction
Topic: PCC Mixing Method
Reply: PCC Mixing Method
My contractor is not mixing the concrete before applying the footing bed PCC. What he is doing is to first dump 40 mm JALLI and then adding mixture of sand and cement on top and mixing it all inside the pit. Is this correct?
When i questioned him, he said that this is the normal process for small projects and hiring a mixer becomes very costly. My project has 14 pillars.
I see 2 problems with this. Soil in the pit gets mixed into the PCC. There is no way to check 1:4:8 ratio of cement, sand and JALLI.
When i questioned him, he said that this is the normal process for small projects and hiring a mixer becomes very costly. My project has 14 pillars.
I see 2 problems with this. Soil in the pit gets mixed into the PCC. There is no way to check 1:4:8 ratio of cement, sand and JALLI.
my contractor says the same thing -- only manual mixing for columns and machine mixer for the rest. though i dont know what manual mixing means (the real procedure) at this time.
Topic: road cutting approval - online? timing?
Couple of quick question:
Do we have to pay for the road cutting charges at the time of applying for BBMP Plan approval or can we wait until we near construction completion to pay for the road cutting charges?
In case the road cutting charges are paid upfront during BBMP approval does it have a validity period? If so, how many months/years?
Do we have to pay for the road cutting charges at the time of applying for BBMP Plan approval or can we wait until we near construction completion to pay for the road cutting charges?
In case the road cutting charges are paid upfront during BBMP approval does it have a validity period? If so, how many months/years?
Topic: Plan Approval cost
Guys,
Looking at this thread, seems like the total charges can be classified as (based the amount paid):
a) Road cutting charges (paid to BBMP Commissioner)
b) Construction Worker fund (paid to Secretary, KSB And Others CWW Board)
c) Unofficial charges
d) Other official charge (betterment, license, misc receipts, ground rent etc)
It seems like everyone at the very minimum has paid for (c) Unofficial & (d) Other Official.
It also seems like some have NOT paid for (a) Road cutting charges and (b) Construction Worker, or they have paid only (a) or (b).
So does some know whether (a) and (b) is required for sure for a BBMP Plan approval?
Looking at this thread, seems like the total charges can be classified as (based the amount paid):
a) Road cutting charges (paid to BBMP Commissioner)
b) Construction Worker fund (paid to Secretary, KSB And Others CWW Board)
c) Unofficial charges
d) Other official charge (betterment, license, misc receipts, ground rent etc)
It seems like everyone at the very minimum has paid for (c) Unofficial & (d) Other Official.
It also seems like some have NOT paid for (a) Road cutting charges and (b) Construction Worker, or they have paid only (a) or (b).
So does some know whether (a) and (b) is required for sure for a BBMP Plan approval?
Topic: What does an AEH point mean (electrical)?
Reply: What does an AEH point mean (electrical)?
This may be a naive question - what does an AEH point mean (for electrical? what is it used for?
AEH = All Electric Home
in the olden days, electrical connections were of very low capacity (probably 1000W?) So it is impossible to run a geyser and microwave at the same time. So there were some newer "AEH" homes that could have a 1500W electric water heater / geyser
Nowadays, I think the supply is 3kW (or maybe 5kW) Hence multiple electrical gadgets can run simultaneously. The AEH name is somewhat meaningless nowadays
There are two types of sockets - 5A (smaller) or 15A (bigger)
in the olden days, electrical connections were of very low capacity (probably 1000W?) So it is impossible to run a geyser and microwave at the same time. So there were some newer "AEH" homes that could have a 1500W electric water heater / geyser
Nowadays, I think the supply is 3kW (or maybe 5kW) Hence multiple electrical gadgets can run simultaneously. The AEH name is somewhat meaningless nowadays
There are two types of sockets - 5A (smaller) or 15A (bigger)
thanks aries31.
Topic: Borewell experience
Reply: Borewell experience
Here's a summary of my experience with borewell drilling for my house (so far):
0. To do OR not
This actually happened after step 1 for me. I went back and forth a few times. Economically it makes sense NOT to do it provided you et Cauvery water within a reasonable time. In my layout all feel +ve it will happen next year. But that's what I heard early last year too. Besides, following up on tanker, ensuring its quality & quantity seemed somewhat of an hassle. But the real reason is the uncertainty of Cauvery in my area.
1. Borewell Application
rkrishna's post covers all details well. I followed up pretty much those steps:
viewtopic.php?f=36&t=4206&p=22636#p22636
One deviation: phase 2 step 4 happened differently for me.
2. Diviner
Called Mr. M.V.Srinivas for Borewell point fixing. You can read an old article that appeared in "The Hindu" about him here:
http://www.hindu.com/pp/2007/03/17/stor ... 480300.htm
He did the coconut method as described there. He has to come from Hebbal by bus but was fairly accurate on the appointment time. He asked me to bring a small rod to fix the point that he would mark (I ended up getting one from the construction site). He took about 15-20 minutes. He was focused and seemed to locate two points - one near NE corner and the other near SW corner. He mentioned the latter has better yield but I couldn't go with it since that'd be a significant change to my plans. Went with the one near NE corner. I guess I've to do something about the small projection the Borewell may cause. He charged me Rs. 2000 (seemed high, tried to bargain with no luck). He also brought one Borewell guy with him. Srinivas claimed to know him for 15 years (thought the Borewell guy looked like in late 20's). I didn't go with that Borewell guy though
3. Drilling
I had spoken with Venkatesh from Vinayaka borewell. His rates were good (attached). Called Venkatesh on Sunday evening - he was ready to start but only by 5 PM. Skipped that since it was Rahu Kalam. Decided to do at 5 AM on Monday. Venkatesh's contact person, Bagyaraj, called me to confirm but called very late at 10.40 pm or so. I told him I'll meet at 5 near a common point.
The next day (Monday) Bagyaraj called me at 4 am (Btw, I was told, in Blr no one does Borewell digging on Tuesdays). Asked if I can come in 30 minutes ?! Anyways got ready and reached site by 4.45 or so. It took a while to get the lorry in - finally all came and unloaded by 5.30. They need to remove one compound wall pillar around - rest of the area were all set (it was cleaned up on Sunday). They started work at around 5.50 or so. I prayed all Gods I could think of.
The first sound was shockingly loud. Lot of white powdery smoke flyin around. I was told it was all rocky surface. We used only one MS Casing pipe - they said that's enough. I couldn't get to read the manufacturer label but asked Bagyaraj he said it is 2.8mm pipe only. God knows what brand. Since it was only one, I left. Was there for another one hour. It looked like they were roughly covering 100' every hour.
Kept calling Bagyaraj. Finally at 1 pm the call came just when I was about to have lunch - "we got water exactly at 700'". Asked them to continue - went & got some sweets. I was told yield "looks" like 2 inches. I could see the water gushing out and streaming away. When I went they were at 740'. Called Geologist, he said "go till 800' and see if the yield looks better; else stop". Went till 800' - looked the same to me. Finally decided to wrap up at 840'. Was feeling damn hungry as well as the dust was doing something to my head.
Here's where I made an error - asked my Mesthri who was there to count the rod once they're done and start pulling them out. Went home and came back. I don't think Mesthri was doin a proper count - was very upset. Counted the rest myself - some 25 rods. In hindsight should've stayed anyway.
Got the final bill: 92K (cash 30K advance). They charged me for welding as well even though only one casing pipe. I decided to leave that as tips. Finally the main driller came - I tipped him but I guess for some reason he turned it down - must have been lower than what he thought though I felt it was good.
4. Motor
Still shopping. Almost zeroing in on one:
viewtopic.php?f=51&t=3710&p=22777#p22776
Lessons
1. Don't rely on anyone to do the Borewell drill rods counting; better ask them to hold off till you're there
2. Skip Tuesdays (Blr Borewell inauspicious); or if you don't care, do it that day as you may get a good deal
3. Diviner: seems ok option; I'd say better get it done before construction plan approval; if you get a point marked for Borewell, that way you can plan accordingly
4. During drilling, they need few gunny bags to cover the drill head (the place where the drill rods are joined). Carry 3 or 4.
5. Finally, trust Him/Her/It, be prepared for all results.
0. To do OR not
This actually happened after step 1 for me. I went back and forth a few times. Economically it makes sense NOT to do it provided you et Cauvery water within a reasonable time. In my layout all feel +ve it will happen next year. But that's what I heard early last year too. Besides, following up on tanker, ensuring its quality & quantity seemed somewhat of an hassle. But the real reason is the uncertainty of Cauvery in my area.
1. Borewell Application
rkrishna's post covers all details well. I followed up pretty much those steps:
viewtopic.php?f=36&t=4206&p=22636#p22636
One deviation: phase 2 step 4 happened differently for me.
2. Diviner
Called Mr. M.V.Srinivas for Borewell point fixing. You can read an old article that appeared in "The Hindu" about him here:
http://www.hindu.com/pp/2007/03/17/stor ... 480300.htm
He did the coconut method as described there. He has to come from Hebbal by bus but was fairly accurate on the appointment time. He asked me to bring a small rod to fix the point that he would mark (I ended up getting one from the construction site). He took about 15-20 minutes. He was focused and seemed to locate two points - one near NE corner and the other near SW corner. He mentioned the latter has better yield but I couldn't go with it since that'd be a significant change to my plans. Went with the one near NE corner. I guess I've to do something about the small projection the Borewell may cause. He charged me Rs. 2000 (seemed high, tried to bargain with no luck). He also brought one Borewell guy with him. Srinivas claimed to know him for 15 years (thought the Borewell guy looked like in late 20's). I didn't go with that Borewell guy though
3. Drilling
I had spoken with Venkatesh from Vinayaka borewell. His rates were good (attached). Called Venkatesh on Sunday evening - he was ready to start but only by 5 PM. Skipped that since it was Rahu Kalam. Decided to do at 5 AM on Monday. Venkatesh's contact person, Bagyaraj, called me to confirm but called very late at 10.40 pm or so. I told him I'll meet at 5 near a common point.
The next day (Monday) Bagyaraj called me at 4 am (Btw, I was told, in Blr no one does Borewell digging on Tuesdays). Asked if I can come in 30 minutes ?! Anyways got ready and reached site by 4.45 or so. It took a while to get the lorry in - finally all came and unloaded by 5.30. They need to remove one compound wall pillar around - rest of the area were all set (it was cleaned up on Sunday). They started work at around 5.50 or so. I prayed all Gods I could think of.
The first sound was shockingly loud. Lot of white powdery smoke flyin around. I was told it was all rocky surface. We used only one MS Casing pipe - they said that's enough. I couldn't get to read the manufacturer label but asked Bagyaraj he said it is 2.8mm pipe only. God knows what brand. Since it was only one, I left. Was there for another one hour. It looked like they were roughly covering 100' every hour.
Kept calling Bagyaraj. Finally at 1 pm the call came just when I was about to have lunch - "we got water exactly at 700'". Asked them to continue - went & got some sweets. I was told yield "looks" like 2 inches. I could see the water gushing out and streaming away. When I went they were at 740'. Called Geologist, he said "go till 800' and see if the yield looks better; else stop". Went till 800' - looked the same to me. Finally decided to wrap up at 840'. Was feeling damn hungry as well as the dust was doing something to my head.
Here's where I made an error - asked my Mesthri who was there to count the rod once they're done and start pulling them out. Went home and came back. I don't think Mesthri was doin a proper count - was very upset. Counted the rest myself - some 25 rods. In hindsight should've stayed anyway.
Got the final bill: 92K (cash 30K advance). They charged me for welding as well even though only one casing pipe. I decided to leave that as tips. Finally the main driller came - I tipped him but I guess for some reason he turned it down - must have been lower than what he thought though I felt it was good.
4. Motor
Still shopping. Almost zeroing in on one:
viewtopic.php?f=51&t=3710&p=22777#p22776
Lessons
1. Don't rely on anyone to do the Borewell drill rods counting; better ask them to hold off till you're there
2. Skip Tuesdays (Blr Borewell inauspicious); or if you don't care, do it that day as you may get a good deal
3. Diviner: seems ok option; I'd say better get it done before construction plan approval; if you get a point marked for Borewell, that way you can plan accordingly
4. During drilling, they need few gunny bags to cover the drill head (the place where the drill rods are joined). Carry 3 or 4.
5. Finally, trust Him/Her/It, be prepared for all results.
Topic: Skylight
thanks Praveen, Sam_m400, I didn't know about polycarbonate sheets and I was thinking of using glass or acrylic sheet, every vendor I spoke to kept giving incorrect information.
I am looking for setting up simple sloped skylight for staircase headroom. like the one here, size will be around 6.5ftx10ft
http://www.arcat.com/bim/solarinn/Skyli ... andard.jpg
How will polycarbonate sheet fitted to the grill? if it is drilled to the grill, wont the water leak inside through the holes?
Thanks again!
I am looking for setting up simple sloped skylight for staircase headroom. like the one here, size will be around 6.5ftx10ft
http://www.arcat.com/bim/solarinn/Skyli ... andard.jpg
How will polycarbonate sheet fitted to the grill? if it is drilled to the grill, wont the water leak inside through the holes?
Thanks again!
No leaks will come ,as they put fabricated rods and lay the poly carbonate sheet above it with screws with gap filled with washers. They are same as what we fit for absetos sheet, only difference here for poly carbon we need to do fabrication where cost is more but get good lighting. There are readymade skylight also available in market townhall nearby whhich you can fix directly in the concrete plastering its end with cement. I have seen in some houses like that .
thanks Sam!
I got one contact from Justdial, he is asking for Rs. 210/SQFT for grill and polycrobonate sheet, I will check in market as you mentioned.
I got one contact from Justdial, he is asking for Rs. 210/SQFT for grill and polycrobonate sheet, I will check in market as you mentioned.
My current rental home has polycarbonate covering the skylight (maybe half the size of the picture that you sent) in the staircase area. When it rains it makes a lot of noise. When birds walk/perch it will make noise. So beware.
Vimal
Vimal
Topic: labour contract (plumbing)
Hi All,
Looking for a reliable plumber - labour contract.
Site near Uttarahalli , please share contact - if you know.
Regards
Looking for a reliable plumber - labour contract.
Site near Uttarahalli , please share contact - if you know.
Regards
i know a plumber who has done good plumbing work at my new house,
Plumber name: Babu, contact number: 9964310099
Plumber name: Babu, contact number: 9964310099
Topic: Cement flooring cost
Reply: Cement flooring cost
Hi,
what is the cost for cement flooring below the wooden flooring as a base which includes the screed concrete?
my contractor has quoted 75 rs per sft. Is this higher ?
justaknock
what is the cost for cement flooring below the wooden flooring as a base which includes the screed concrete?
my contractor has quoted 75 rs per sft. Is this higher ?
justaknock
Topic: Marble laying cost
Reply: Marble laying cost
Hi All,
I would like to know the cost for laying marble in cement mortar including mirror polishing and chemical coating. I will be using Jaisalmer marble.
Thanks
I would like to know the cost for laying marble in cement mortar including mirror polishing and chemical coating. I will be using Jaisalmer marble.
Thanks
Topic: Niki doors
Reply: Niki doors
I have seen in the internet on Niki readymade doors, did any body has used that? . Is it water proof and how reliable is that????
I used it for all internal doors of my house , including bathroom doors. I am quite happy with it. I had insisted on Niki to my contractor because of good reviews from my friends about it. Again, it has been only about 5 months , since my construction is over, and hence not too long a time to comment on the durablity aspect of it !!
Thanks . I too visited today to one of there shop and i like there products. Doors can be used to internal/external/water areas.... with teak beading if required. They do have wood which is chemically treated which can be used for bathrooms and water proof . I like it.
@jackalbda : Which type of Niki doors you used for bathrooms???
@jackalbda : Which type of Niki doors you used for bathrooms???
I dint use any different material/model for the bathrooms. It was all the same for all the interior doors. If you go to http://www.nikidoors.com/products.html, you can see them under "Moulded Panel Doors".
Thanks jackalbda and sam_m400! I was also looking for this information.
How much is the cost of the door?
how much on an average will be the cost of the fittings like door knobs, locks?
How much will be the door fitting charge? will carpenter do this? Frame is already placed
How much is the cost of the door?
how much on an average will be the cost of the fittings like door knobs, locks?
How much will be the door fitting charge? will carpenter do this? Frame is already placed
I haven;t checked fittings material cost /carpenter charge as need to decide on what type of doors i need, then thought of going with carpenter as we know what activites he need to do .
Just visit the site there are various type of doors including main door with Teak venner/polished looked very good which cost 11700 Rs. There is Skin door which cost around 156 Rs, and bathroom doors which are chemically treated for 125 Rs ,and teak laminate/PVC laminated looks very good at 196 rs. Since they treat everything chemically it very sustainable, and in enquired with my neighour who has put around 6 months back and no compliants or bends. Even we can put external as well with painting/teakk beading below so that moisture wont come as nowdays even Honne are not cured properly .In old day they do cure for at least 6 month before making it ,as nowday they do cut and built shutter so once exposed to environment it can lead to bends. Even they do cut the trees which are not matured ,as in old day they do cut teak after 80 and 90 years ,as nowday those pratices are gone. We need to live thos.. I enquired on Honne cost is more but still bend happens as i have seen in neighbours house ,so dropped that plan....
fitting charged i got 40 Rs per sqft .Need to enquire further today as i mostely i will for for NIKI doors.... I already posted a message (carpenter cost for fitting) on this subject but nobody has replied till now.
Just visit the site there are various type of doors including main door with Teak venner/polished looked very good which cost 11700 Rs. There is Skin door which cost around 156 Rs, and bathroom doors which are chemically treated for 125 Rs ,and teak laminate/PVC laminated looks very good at 196 rs. Since they treat everything chemically it very sustainable, and in enquired with my neighour who has put around 6 months back and no compliants or bends. Even we can put external as well with painting/teakk beading below so that moisture wont come as nowdays even Honne are not cured properly .In old day they do cure for at least 6 month before making it ,as nowday they do cut and built shutter so once exposed to environment it can lead to bends. Even they do cut the trees which are not matured ,as in old day they do cut teak after 80 and 90 years ,as nowday those pratices are gone. We need to live thos.. I enquired on Honne cost is more but still bend happens as i have seen in neighbours house ,so dropped that plan....
fitting charged i got 40 Rs per sqft .Need to enquire further today as i mostely i will for for NIKI doors.... I already posted a message (carpenter cost for fitting) on this subject but nobody has replied till now.
thanks Sam, i visited Nikki showroon near jayadeva hosiptal and things where exactly like you mentioned above. I am also planning to go with nikki doors for all internal doors.
Now for main door and pooja door, where can i find good quality, strong teak readymade doors?
Now for main door and pooja door, where can i find good quality, strong teak readymade doors?
Topic: Having Window shutters with Sal wood?
hi , today i visited a Wood shop he was telling the Steam beach Wood is much Better Red Sal for the Frames might be little Costlier but it has only 8-10% mositure. any suggestion on using Steam Beach wood for the Frames?
Topic: Polishing wooden door
Reply: Polishing wooden door
1. How much it labour cost per sqft?
2. Is polishing to be done over the laminated sheets like venner or directly onto the door using any polishing compound?
3. Which polishing compound is being used for polishing????
4. How much it direct door polishing material cost ?
5.How much venner poilshing compound material cost?
2. Is polishing to be done over the laminated sheets like venner or directly onto the door using any polishing compound?
3. Which polishing compound is being used for polishing????
4. How much it direct door polishing material cost ?
5.How much venner poilshing compound material cost?
Topic: Borewell or Not
Dear All,
I have also completed digging borewell in my site @ L B Shastrinagar.Thanks to this forum for helping
me choose bore well contractors.I went by vinayaka borewell after reading few of the frens experience here and they
were perfetly right.Vinayaka Borewell people were really nice and responsible.He dint have a digger free hence he
had arranged the digging machine from S P Borewell to stick on to the comitted timeline!!!.He was on time and the
owner ( Mr.Dinesh) was very responsible .He was constantly following up with me on the status, although he had
sent an onsite manager to look after things
I got around 1 " yield, although was expecting more.However i have all the reasons to be happy as water source in L
B Shastrinagar area is very bad and felt lucky for not ending up with a dry borewell.We got the first source at around
150 ft and second one at 600+.On day1 i was very disspointed as i couldn't see any water flushing out and thought we
dint get any water.However borewell guy was constantly telling me that we already got 1/2-3/4" water which should
be good for your family.I still dint believe him. On day2 he had sked me to be there at site by 5:30 am.I went there
by 5:am and he started lowering the rods.First thing he said was " sir.....now you can see that i wasn't lying" n he
started flushing the water which was collected overnight.Around 1500litres of water suddenly flushed out and i was
very happy to see that.Finally we got around 1" of water and stopped at 740ft.We started getting silt and stopped at
740 as digging beyond silt would be waste.The mud might slide and close the borewell once we remove the
rods.This was told by the borewell guy himself and he forced me to stop digging, while i was constanly asking for
minimum of 850ft!!!.Thanks to him for educating me and finally convincng me to stop at 740!!!.We stopped at
740.
Total expenses were as below:
Borewell point Test ------------------------->700
Borewell Digging Labours tea+Bun------->250
Tips to labours & drivers------------------------>1600
Casing & welding cost ( 2.5 mm C class) --20650
Borewell Digging cost(740 ft) ----------------> 72000
---------------------------------------------------------------------
Total: 95,235 ( got 2k discount hence paid 93k .. )
Couple of things learnt ,if it can help others:
1) Def recommend Vinayak Borewlls ( Completely based on ONLY my exp with them. I dont know anything else
about them)
2) If you are not aware, the drilling rods are of 18.5ft each and NOT 20ft. Please make sure you know this while
calculating total depth ,as heard many will cheat saying its 20ft each!!.
3) Make sure you keep the drill operator happy to make him do little more than what he is just supposed to do... .I
paid him 100 on day1 and 200 after finishing the work.Asked him to keep on flushing water as and when he finds a
water spurce , which atually make the craks open and clean allowing water to flow in.He did it 3-4 times on my
request where ever we felt there is a small watersource.
Stage 1 is done ,now stage 2 is to hunt for good contrators to construct my house.Appreciate any help on this.
Thanks again to all , feel free to contact me if you think my experince can help you.
-Regards
Sachin
I have also completed digging borewell in my site @ L B Shastrinagar.Thanks to this forum for helping
me choose bore well contractors.I went by vinayaka borewell after reading few of the frens experience here and they
were perfetly right.Vinayaka Borewell people were really nice and responsible.He dint have a digger free hence he
had arranged the digging machine from S P Borewell to stick on to the comitted timeline!!!.He was on time and the
owner ( Mr.Dinesh) was very responsible .He was constantly following up with me on the status, although he had
sent an onsite manager to look after things
I got around 1 " yield, although was expecting more.However i have all the reasons to be happy as water source in L
B Shastrinagar area is very bad and felt lucky for not ending up with a dry borewell.We got the first source at around
150 ft and second one at 600+.On day1 i was very disspointed as i couldn't see any water flushing out and thought we
dint get any water.However borewell guy was constantly telling me that we already got 1/2-3/4" water which should
be good for your family.I still dint believe him. On day2 he had sked me to be there at site by 5:30 am.I went there
by 5:am and he started lowering the rods.First thing he said was " sir.....now you can see that i wasn't lying" n he
started flushing the water which was collected overnight.Around 1500litres of water suddenly flushed out and i was
very happy to see that.Finally we got around 1" of water and stopped at 740ft.We started getting silt and stopped at
740 as digging beyond silt would be waste.The mud might slide and close the borewell once we remove the
rods.This was told by the borewell guy himself and he forced me to stop digging, while i was constanly asking for
minimum of 850ft!!!.Thanks to him for educating me and finally convincng me to stop at 740!!!.We stopped at
740.
Total expenses were as below:
Borewell point Test ------------------------->700
Borewell Digging Labours tea+Bun------->250
Tips to labours & drivers------------------------>1600
Casing & welding cost ( 2.5 mm C class) --20650
Borewell Digging cost(740 ft) ----------------> 72000
---------------------------------------------------------------------
Total: 95,235 ( got 2k discount hence paid 93k ..
Couple of things learnt ,if it can help others:
1) Def recommend Vinayak Borewlls ( Completely based on ONLY my exp with them. I dont know anything else
about them)
2) If you are not aware, the drilling rods are of 18.5ft each and NOT 20ft. Please make sure you know this while
calculating total depth ,as heard many will cheat saying its 20ft each!!.
3) Make sure you keep the drill operator happy to make him do little more than what he is just supposed to do...
paid him 100 on day1 and 200 after finishing the work.Asked him to keep on flushing water as and when he finds a
water spurce , which atually make the craks open and clean allowing water to flow in.He did it 3-4 times on my
request where ever we felt there is a small watersource.
Stage 1 is done ,now stage 2 is to hunt for good contrators to construct my house.Appreciate any help on this.
Thanks again to all , feel free to contact me if you think my experince can help you.
-Regards
Sachin
Topic: What is current cost of fixing ready made doors/shutter?
Reply: What is current cost of fixing ready made doors/shutter?
One carpenter is charging 40 rs per sqft for readymade doors/windows shutters. Is the current price?. Is price includes fitting glass/beading as well???
Topic: Borewell inspection by Camera
Hi,
Kindly let know the forum is the price inclusive of audio coupling with camera or video only.
By your research did you find anybody who is doing video and audio narration at the same time and giving a CD.
thanks
Kindly let know the forum is the price inclusive of audio coupling with camera or video only.
By your research did you find anybody who is doing video and audio narration at the same time and giving a CD.
thanks
meharnath wrote:Hi,
Kindly let know the forum is the price inclusive of audio coupling with camera or video only.
By your research did you find anybody who is doing video and audio narration at the same time and giving a CD.
thanks
Hi Meharnath,
Still now that kind of mechanism was not found but right now there is only video capture facility available.
*********** you can advertise only after you share your knowledge in the forum --- EDITED BY ADMIN *******
video only. CD is part of the work. It's in VCD format. wire has markings.
Regarding audio coupling - I guess intention is to capture info about water sources, dry zones, boulders, silt, water level, dead end etc., - I have manually noted down the details on my phone - like "274 feet - small source of water", "804 feet - loose boulders - go for 4" instead of 6" pumpset"
Regarding audio coupling - I guess intention is to capture info about water sources, dry zones, boulders, silt, water level, dead end etc., - I have manually noted down the details on my phone - like "274 feet - small source of water", "804 feet - loose boulders - go for 4" instead of 6" pumpset"
Topic: Green Buildings
Reply: Green Buildings
Hello My BDA Site Members,
It is a great pleasure to write to you. As many of you are aware about the benefit of Green Building to our environment, health, and human safety (EHS) in present construction scenario. I would like to take this opportunity to share most upto date information to the users of this website at zero-cost! That's right 0! I shall be happy to support your building construction activities as per Green Building norms and keep all the members informed about the Green and Energy Efficient buildings and alternatives available today.
"We shape Buildings and building shape us".
--Winston Churchill
This is so true even in today's busy lifestyle. We do not able to keep enough time with our lived ones and handling building construction is not an easy task for any single person. Today each building component prices have gone significantly high. It also involved lots of risk at various levels such as daily fluctuation in market prices of building materials, transportation costs, detail site inspection etc.
Therefore, we at "eCUBE solutions" help various individuals, dreaming to built their quality home. We have developed OFFSITE building construction technology that creates healthy, comfortable and energy efficient homes for you. The offsite building technique is also recommended in Green Building principles, and as per government norms to do the construction for G+3 structure. The significant advantage of this construction technology is that, OFFSITE CONSTRUCTION SAVES WATER, ENERGY AND OVERALL TIME REQUIRED BY CONVENTIONAL BUILDING CONSTRUCTION PROCESSES.
We are having experience in construction activities that can help YOU SAVE ON ELECTRICITY, WATER, operation & maintenance COSTS, AND ABOVE ALL TIME MANAGEMENT.
If you would like to built your house as per Green Building Norms and get certification of your independent Villas, Bungalows, Apartment, Office; additionally you will get much better appreciation on property returns on your investment as well as improve your own buildings overall performance.
Please do write to us to help you serve better and assist you in making right decision in BUILDING YOUR DREAM HOME; arbcube@gmail.com
Thank you very much for your time.
Kind regards,
eCUBE
Indiranagar, HAL 2nd Stage,
Bangalore
It is a great pleasure to write to you. As many of you are aware about the benefit of Green Building to our environment, health, and human safety (EHS) in present construction scenario. I would like to take this opportunity to share most upto date information to the users of this website at zero-cost! That's right 0! I shall be happy to support your building construction activities as per Green Building norms and keep all the members informed about the Green and Energy Efficient buildings and alternatives available today.
"We shape Buildings and building shape us".
--Winston Churchill
This is so true even in today's busy lifestyle. We do not able to keep enough time with our lived ones and handling building construction is not an easy task for any single person. Today each building component prices have gone significantly high. It also involved lots of risk at various levels such as daily fluctuation in market prices of building materials, transportation costs, detail site inspection etc.
Therefore, we at "eCUBE solutions" help various individuals, dreaming to built their quality home. We have developed OFFSITE building construction technology that creates healthy, comfortable and energy efficient homes for you. The offsite building technique is also recommended in Green Building principles, and as per government norms to do the construction for G+3 structure. The significant advantage of this construction technology is that, OFFSITE CONSTRUCTION SAVES WATER, ENERGY AND OVERALL TIME REQUIRED BY CONVENTIONAL BUILDING CONSTRUCTION PROCESSES.
We are having experience in construction activities that can help YOU SAVE ON ELECTRICITY, WATER, operation & maintenance COSTS, AND ABOVE ALL TIME MANAGEMENT.
If you would like to built your house as per Green Building Norms and get certification of your independent Villas, Bungalows, Apartment, Office; additionally you will get much better appreciation on property returns on your investment as well as improve your own buildings overall performance.
Please do write to us to help you serve better and assist you in making right decision in BUILDING YOUR DREAM HOME; arbcube@gmail.com
Thank you very much for your time.
Kind regards,
eCUBE
Indiranagar, HAL 2nd Stage,
Bangalore
Topic: Shops for Plumbing and electrical materials
HI
I purchased Toto Commodes and Geberit concealed tanks from Maruthi Ceramics(on Banaswadi, near to Outer Ring road), at 30% discount ( 14.5% Vat. extra). So the actual discount has been somewhere around 20%. I am not sure if this is the best deal, but PC Sampath and some other shops offered me only 15-18% discounts on all these items.
The reason why I chose Toto is, that is the only one which comes with whirlpool flush(which I believe would be more effective). If you want to put all sanitary fixtures high end, then Maruthi Ceramic have some packages as well. You can probably check with them.
Now I am looking for a good Kohler dealer. When i compared the basic versions of Kohler and Jaguar, the prices are almost similar. I am thinking Kohler would be better as its a global brand and will have their own factories(Rather than Jaguar producing it from some chinease factory and labelling it Jaguar). The best discount offered to me so far is 15%, but i am yet to check with most of the Kohler shops. Anyone knows any Kohler dealer, who gives good discounts???
I purchased Toto Commodes and Geberit concealed tanks from Maruthi Ceramics(on Banaswadi, near to Outer Ring road), at 30% discount ( 14.5% Vat. extra). So the actual discount has been somewhere around 20%. I am not sure if this is the best deal, but PC Sampath and some other shops offered me only 15-18% discounts on all these items.
The reason why I chose Toto is, that is the only one which comes with whirlpool flush(which I believe would be more effective). If you want to put all sanitary fixtures high end, then Maruthi Ceramic have some packages as well. You can probably check with them.
Now I am looking for a good Kohler dealer. When i compared the basic versions of Kohler and Jaguar, the prices are almost similar. I am thinking Kohler would be better as its a global brand and will have their own factories(Rather than Jaguar producing it from some chinease factory and labelling it Jaguar). The best discount offered to me so far is 15%, but i am yet to check with most of the Kohler shops. Anyone knows any Kohler dealer, who gives good discounts???
Jayadas
I am also planning to buy TOTO commodes. Can u please share the model no. & price of the commode ?
I am also planning to buy TOTO commodes. Can u please share the model no. & price of the commode ?
Topic: Engineered Acasia for Window/Door
Finally got a quote from KSFIC as well for same, They said they use Burma Teak and Australian Honne only. gave QUOTE after paying 300Rs. total quote for my requirement including VAT come around 6.5Lacs (Engineered wood come to 3.5 Lakh including VAT)
Couple of point what i learned on Glulam/Engineered wood
- It's tried and tested process in other countries when you need longer beams over 50ft also
- Sustainable as you use fast grwoing wood
Than i had doub't on the manufacturing process in India, so went around and found that
[list=]- Geetha timber get all their equipment from Germany and they are only few company in India who are making this product
- The product is tested at Indian wood research Institute
- My Architect her self has used this wood on outside (as climbing steps from past two year and it has been exposed to all kinds of weather harsh Sun/Rain/Dirt etc and no cracks expect they lost their polish
- It treated/season for 24 days before manufacturing
- They are not using any waste wood exempt only Acasia[/list]
Many article mention that Glulam product is more stable/strength than steel itself
Just to make myself more comfortable, i am visiting some house owners who already have used this during this weekend, may put some Photos as well.
Couple of point what i learned on Glulam/Engineered wood
- It's tried and tested process in other countries when you need longer beams over 50ft also
- Sustainable as you use fast grwoing wood
Than i had doub't on the manufacturing process in India, so went around and found that
[list=]- Geetha timber get all their equipment from Germany and they are only few company in India who are making this product
- The product is tested at Indian wood research Institute
- My Architect her self has used this wood on outside (as climbing steps from past two year and it has been exposed to all kinds of weather harsh Sun/Rain/Dirt etc and no cracks expect they lost their polish
- It treated/season for 24 days before manufacturing
- They are not using any waste wood exempt only Acasia[/list]
Many article mention that Glulam product is more stable/strength than steel itself
Just to make myself more comfortable, i am visiting some house owners who already have used this during this weekend, may put some Photos as well.
Topic: plumbing materials/water proof
Try Maruthi Ceramics in banaswadi(near outer ring road). I got 30% discount (14.5 vat extra) on Toto/Geberit brands. The effective discount would be 20%. I have posted the same in another thread as well.
Now, I need a Kohler retailer in town. Any suggestions?? I have visited only 1 Kohler shop so far(one on the HSR), they offered 15%. I dont think thats the best. Any other better ones?
Jay
Now, I need a Kohler retailer in town. Any suggestions?? I have visited only 1 Kohler shop so far(one on the HSR), they offered 15%. I dont think thats the best. Any other better ones?
Jay
Topic: Laminated doors
Hi All,
I am also looking for PVC doors for my bathroom.Can you suggest some good dealers /shops . Also what is the difference between solid PVC doors and PVC doors and whats the price difference ?
Regards,
Alok
I am also looking for PVC doors for my bathroom.Can you suggest some good dealers /shops . Also what is the difference between solid PVC doors and PVC doors and whats the price difference ?
Regards,
Alok
Topic: ready mix concrete vs manual mix
Nivas, the GGBS was around 3800 is the last quote and the 100% ops was 4200, yes Vibrator was used all the while while pouring.
ok GGBS is better ...
So i my earlier post i had told i went for GGBS, which is wrong sorry i had gone for 100% OPC since my engineer told it will be strong, But the RMC guy told me ...it is better i go for GGBS. but i went with what my engineer said. s0 100% opc is always Costiler.
ok GGBS is better ...
So i my earlier post i had told i went for GGBS, which is wrong sorry i had gone for 100% OPC since my engineer told it will be strong, But the RMC guy told me ...it is better i go for GGBS. but i went with what my engineer said. s0 100% opc is always Costiler.
Forum: Interiors
Topic: [Help] Gas Piping
Hi
I thought of doing the gas pipe line @ residential home ( G + 2 floors, each floor 2 homes ) space under the Stairs .
on reading the post, vertical lift is not advisable and more than 10 to 20 feet is not advisable.
Hence dropping the idea of making storage of gas in a common place.
is there any way i can achieve keeping Gas in common place.
Regards
Sanks
I thought of doing the gas pipe line @ residential home ( G + 2 floors, each floor 2 homes ) space under the Stairs .
on reading the post, vertical lift is not advisable and more than 10 to 20 feet is not advisable.
Hence dropping the idea of making storage of gas in a common place.
is there any way i can achieve keeping Gas in common place.
Regards
Sanks
When you say we loose LPG, does it mean gas is leaked during transmission or it remains in cylinder and not used?
Topic: Common tile for Balcony, utility and parking
@Mahesh,
do those car parking tiles take the abuse of vehicle parking well? i have this question since i need to be sure about these tiles when heavy vehicles like bullet or yezdi main stand is put.
do those car parking tiles take the abuse of vehicle parking well? i have this question since i need to be sure about these tiles when heavy vehicles like bullet or yezdi main stand is put.
Topic: Woodwork for a newly constructed flat
Hi Praveen,and others on the forum,
I would like to know how much would be the life of laminate(on ply or block board)I read on this forum that they fade over time.
what precautions should I take while selecting colors?(darker shaders like wenge--chocolate brown fade faster??
but I m looking for something decent/long lasting and less maintanence
is veneer or laminate better for me?
anymore advices please
budget is a constraint
thanks in advance.
I would like to know how much would be the life of laminate(on ply or block board)I read on this forum that they fade over time.
what precautions should I take while selecting colors?(darker shaders like wenge--chocolate brown fade faster??
but I m looking for something decent/long lasting and less maintanence
is veneer or laminate better for me?
anymore advices please
budget is a constraint
thanks in advance.
ardesarchitects wrote:Hi Avani
Water proof block board is good ,but a commercial MR grade will do for wardrobes ,since there is very little chances of water or moisture issues.Block doesn't bend easily like ply.So block board is always better than ply in my understanding.For suppliers you need to look for nearest place to your site.Let me know location depending on which i can suggest a dealer.
You can use brands like kitply ,BA, Alpine,green , century , Archid etc...
Regards
Ar.Praveen.N
Ardes Architects and Interior Designers
Ardesarchitects@gmail.com
http://www.ardesarchitects.com
Forum: Material prices -- Members only
Topic: Wall mounted or regular commode
Reply: Wall mounted or regular commode
Hi All
Wanted inputs on advantage disadvantage of toilet commode type - to chose between them.
Also please share the cost difference and brand name if you know off
Regards
Wanted inputs on advantage disadvantage of toilet commode type - to chose between them.
Also please share the cost difference and brand name if you know off
Regards
Wall mounted :
+ Looks nice. Easier to clean floor. No holes in floor tiles.
- Limited weight carrying capacity , expensive.
You can find models and prices online (Cera, Hindware, Jaquar, Parry etc).
eg:
Armada squarish http://www.hindwarehomes.com/productdet ... ?prdid=110 Cat No 92036
Fonte leaf shaped http://www.hindwarehomes.com/productdet ... ?prdid=792 Cat No 92074
http://www.parryware.in/1-5-36.Cardiff.htm
+ Looks nice. Easier to clean floor. No holes in floor tiles.
- Limited weight carrying capacity , expensive.
You can find models and prices online (Cera, Hindware, Jaquar, Parry etc).
eg:
Armada squarish http://www.hindwarehomes.com/productdet ... ?prdid=110 Cat No 92036
Fonte leaf shaped http://www.hindwarehomes.com/productdet ... ?prdid=792 Cat No 92074
http://www.parryware.in/1-5-36.Cardiff.htm
Topic: Borewell Pump installation
hi
did you do the installation > Can u share the details ?
did you do the installation > Can u share the details ?
Topic: borewell pump
What's the pump required for 840' ? I heard it must be submersible (Ramsons, JC Road said that). Also Ramsons was saying you've to go for 4 or 5 HP.
Another quote I got was this:
1. 3 phase 3HP 40 stage motor - 23,800 [ need to check warranty]
2. Starter C&S brand 4,200
3. Rishi pipe - 12.5 Kg is 115/mtr; 10 kg is 90/mtr - need 228m ?
4. Finolex cable 4 sqmm 90/mtr - need 245 m ?
5. Transportation - 800
6. Installation (?) - 1800
7. End pipe fittings 780
Total comes to 81,000
All above includes taxes. This is a dealer guy.
Can someone confirm if the above is good as well ? (I am leaning toward this guy since he'll be closer home, for serviceability and stuff)
but not sure about
1. Do I need extra cable - to run it from borewell point till switch panel, if that's located within watchman shed which is abt 40' from borewell point
2. If water source is 750' but borewell depth is 850', do we need cable & pipe till 850' ?
3. Any idea abt C&S brand panel ?
Another quote I got was this:
1. 3 phase 3HP 40 stage motor - 23,800 [ need to check warranty]
2. Starter C&S brand 4,200
3. Rishi pipe - 12.5 Kg is 115/mtr; 10 kg is 90/mtr - need 228m ?
4. Finolex cable 4 sqmm 90/mtr - need 245 m ?
5. Transportation - 800
6. Installation (?) - 1800
7. End pipe fittings 780
Total comes to 81,000
All above includes taxes. This is a dealer guy.
Can someone confirm if the above is good as well ? (I am leaning toward this guy since he'll be closer home, for serviceability and stuff)
but not sure about
1. Do I need extra cable - to run it from borewell point till switch panel, if that's located within watchman shed which is abt 40' from borewell point
2. If water source is 750' but borewell depth is 850', do we need cable & pipe till 850' ?
3. Any idea abt C&S brand panel ?
Btw, dumb q. Why does one need a cable ? Also, is it calculated as meter -> borewell depth conversion ? That is, 90/mtr --> for 840', correspondin price ?
Topic: INDUS TMT Price in Bangalore
Reply: INDUS TMT Price in Bangalore
Hi All,
I am constructing a house in vijaynagar on 30 * 60 plot and got a quote from one of the dealer for INDUS TMT FE-500 for 50,000 per tonne, So could you please tell me if this is right market price?
-Vinod
I am constructing a house in vijaynagar on 30 * 60 plot and got a quote from one of the dealer for INDUS TMT FE-500 for 50,000 per tonne, So could you please tell me if this is right market price?
-Vinod
Forum: Site for sale
Topic: Current rates in Upkar layout, Ullal for non-bda sites
Hi Folks,
Please let me know the current rate of BDA approved sites in Upkar residency, Ullal.
Regards
Please let me know the current rate of BDA approved sites in Upkar residency, Ullal.
Regards
Topic: 20*30 East facing plot for Sale at Anjanapura 5th G Blk
Reply: 20*30 East facing plot for Sale at Anjanapura 5th G Blk
Sorry just read the rules for the posting....
We are selling our direct allotteed site please find the details below.
1. Location of the plot / house / apartment : Anjanapura 5th G Block
2. Size details - For Plots - total area and dimensions; for apartments/built houses - plot total area, and dimensions, built up area, carpet area : 20*30 = 600 Sqft
3. Facing (which side the plot faces - North, South, East, West) : East Facing
4. Information about developer / builder : Direct allotted by BDA
5. State if it is a BDA plot or not.: BDA First Owner
6. Approvals - BDA, BMRDA, BBMP, DC conversion etc. : BDA
7. Katha type - Specify whether it is A katha or B katha or other : Don't know what does A or B mean?
8. Price info - price per sq. ft and total price: 22 Lacs
9. Eligible for bank loans - State if buyer can apply for bankloans (If Yes specify the known details about banks).: Yes
10. Contact info - preferably both email and phone, or at least one. : priya_softpro@yahoo.com (Please contact only if serious & genuine buyers)
11. If direct seller or Broker. : Direct . Brokers please excuse not entertaining at the moment.
12. If Broker - post the fees/commissions you charge. : NA
Area Map for reference: One house constructed in the opposite lane but no one leaving there.. Property is close to Nice road.
http://wikimapia.org/#lang=en&lat=12.85 ... 3&z=18&m=b
We are selling our direct allotteed site please find the details below.
1. Location of the plot / house / apartment : Anjanapura 5th G Block
2. Size details - For Plots - total area and dimensions; for apartments/built houses - plot total area, and dimensions, built up area, carpet area : 20*30 = 600 Sqft
3. Facing (which side the plot faces - North, South, East, West) : East Facing
4. Information about developer / builder : Direct allotted by BDA
5. State if it is a BDA plot or not.: BDA First Owner
6. Approvals - BDA, BMRDA, BBMP, DC conversion etc. : BDA
7. Katha type - Specify whether it is A katha or B katha or other : Don't know what does A or B mean?
8. Price info - price per sq. ft and total price: 22 Lacs
9. Eligible for bank loans - State if buyer can apply for bankloans (If Yes specify the known details about banks).: Yes
10. Contact info - preferably both email and phone, or at least one. : priya_softpro@yahoo.com (Please contact only if serious & genuine buyers)
11. If direct seller or Broker. : Direct . Brokers please excuse not entertaining at the moment.
12. If Broker - post the fees/commissions you charge. : NA
Area Map for reference: One house constructed in the opposite lane but no one leaving there.. Property is close to Nice road.
http://wikimapia.org/#lang=en&lat=12.85 ... 3&z=18&m=b
Topic: 30*40 SITE FPR SALE IN BANASHANKARI 6th STAGE 4th B BLOCK
Hi,
Can you please let me know is ti still available for sale and what is the current price quoting..?
I understand this plot is near Sobha Sunscape apartments..
Can you please let me know is ti still available for sale and what is the current price quoting..?
I understand this plot is near Sobha Sunscape apartments..
Topic: Kanakashree layout - Kannur - 30x40 East facing
Reply: Kanakashree layout - Kannur - 30x40 East facing
1. Location of the plot / house / apartment:II stage - kanakashree layout Kannur - Bagalur BIA cargo road. - 2nd C Cross.
2. Size details - For Plots - total area and dimensions; for apartments/built houses - plot total area, and dimensions, built up area, carpet area: 1200.00 sft. - 30 ' x 40'
3. Facing (which side the plot faces - North, South, East, West)- East facing.
4. Information about developer / builder. - BDA approved Society layout.
5. State if it is a BDA plot or not. - BDA approved.
6. Approvals - BDA, BMRDA, BBMP, DC conversion etc.: BDA approved - No objection certificate to sell obtained from the society.
7. Katha type - Specify whether it is A katha or B katha or other ; BDA khatha - BBMP jurisdiction not yet come.
8. Price info - price per sq. ft and total price. - Rs.3650/- per sft - Rs.43,80,000/-
9. Eligible for bank loans - State if buyer can apply for bankloans (If Yes specify the known details about banks).Yes - Any bank loan
10. Contact info - preferably both email and phone, or at least one. 9902029296, or ranjanimehar@gmail.com
11. If direct seller or Broker. - Broker.,
12. If Broker - post the fees/commissions you charge. - 2%
13. Only one property can be listed per post /topic - Yes o.k
2. Size details - For Plots - total area and dimensions; for apartments/built houses - plot total area, and dimensions, built up area, carpet area: 1200.00 sft. - 30 ' x 40'
3. Facing (which side the plot faces - North, South, East, West)- East facing.
4. Information about developer / builder. - BDA approved Society layout.
5. State if it is a BDA plot or not. - BDA approved.
6. Approvals - BDA, BMRDA, BBMP, DC conversion etc.: BDA approved - No objection certificate to sell obtained from the society.
7. Katha type - Specify whether it is A katha or B katha or other ; BDA khatha - BBMP jurisdiction not yet come.
8. Price info - price per sq. ft and total price. - Rs.3650/- per sft - Rs.43,80,000/-
9. Eligible for bank loans - State if buyer can apply for bankloans (If Yes specify the known details about banks).Yes - Any bank loan
10. Contact info - preferably both email and phone, or at least one. 9902029296, or ranjanimehar@gmail.com
11. If direct seller or Broker. - Broker.,
12. If Broker - post the fees/commissions you charge. - 2%
13. Only one property can be listed per post /topic - Yes o.k
Topic: 30*40BDA SITE FOR SALE IN BANASHANKARI 6th stage 4th H block
manjunatha.palaksha wrote:banashankari 6thstage 4 h block
am interested , pls call 9901088661
I agree with PlotGuy. if you are interested, why don't you call the person - phone number is provided in the ad. The whole point of requesting the advertiser to provide all the details upfront is to avoid the forum getting flooded with such - "call me"; "send me details" etc. messages.
Forum: Site wanted
Topic: Telecome Green Field GFG-1, GFG-2 GFG-3
Reply: Telecome Green Field GFG-1, GFG-2 GFG-3
I am looking to buy a site in Telecom Layout on BIAL Road (Projects - GFG-1 / GFG-2 / GFG-3).
My requirement is 30/40 or 30/50 site. Price quote is around 1200/sq ft.
Direct owners preferred.
My requirement is 30/40 or 30/50 site. Price quote is around 1200/sq ft.
Direct owners preferred.
Forum: Rental Available
Topic: 1 BHK available for rent near Hoskerhalli, BSK 3rd Stage
Reply: 1 BHK available for rent near Hoskerhalli, BSK 3rd Stage
Hi,
my 1 BHK house is available on rent for immediate occupation which is located near Hoskerhalli, BSK 3rd Stage
- Location - Near Hoskerhalli Kerekodi, BSK 3rd Stage
- Approx. Distance - 1 km from Ring road and Nice road, PES-iT and Global college at 1 km
- Expected Rent - 6K
- Advance - Generally 10 months rent, but negotiable
- Facing - North, 1st Floor, two and four wheeler parking available
If interested please email rraikar@gmail.com or PM or can call @ 9980520550
Thanks!
-Rajesh
my 1 BHK house is available on rent for immediate occupation which is located near Hoskerhalli, BSK 3rd Stage
- Location - Near Hoskerhalli Kerekodi, BSK 3rd Stage
- Approx. Distance - 1 km from Ring road and Nice road, PES-iT and Global college at 1 km
- Expected Rent - 6K
- Advance - Generally 10 months rent, but negotiable
- Facing - North, 1st Floor, two and four wheeler parking available
If interested please email rraikar@gmail.com or PM or can call @ 9980520550
Thanks!
-Rajesh
Forum: Apartment for sale
Topic: Cozy 3/5 BHK 12 unit Apartment (partyhall) - Kanakapura Road
Reply: Cozy 3/5 BHK 12 unit Apartment (partyhall) - Kanakapura Road
Details of project.
1. Location of the plot / house / apartment.This Apartment project is located about 0.5 km from the proposed krishnaleela park namma metro station and is 13kms from the City at No: 793, Bank officers layout, Doddakallasandra I stage, Narayananagara I block, Off Kanakapura Road, Behind GREEN HOMES super market on the main Bank officers layout to anjanapura double road, Bangalore - 62.
2. Size details - For Plots - total area and dimensions; for apartments/built houses - 8100.00 sft plot area - 100' x 81' Plot size, varying from 1742. 1850, 1906 to 3058 sft. - A seperate list is herewith attached.
3. Facing (which side the plot faces) - South facing - 40' wide Road.
4. Information about builder- STHIRA BUILDERS, J.P. Nagar 5th phase, Bangalore - 560078.
5. State if it is a BDa plot or not: - Yes it is a BDA plot.
6. Approvals - BDA approved layout, now under BBMP.
7. Price info - 3950 to 4200/- per sft for super built up area.
8. Contact info - 26587848, 9902029296, sthirabuilders@gmail.com
9. If direct seller or Broker. - Yes. Land owner, Engineer and also builder of the apartment.
10. If Broker - Not Broker
Some of the key amenities for the apartment are
1. Multipurpose community hall of approximately 70 sitting capacity in the ground floor for the 12 unit apartment only.
2. Childrens play area.
3. Schiendler brand 6 passenger lift.
4. Back up power
5. Borewell - very good source.
Highlight specifications.
1. Roof height cladding for all the bathrooms.
2. All teak wood door frames and veneered shutters.
3. 30mm thk black granite kitchen counters and solid granite sink.
4. Pooja room in all the apartments with Teak door frame and shutter.
5. Ample alround setbacks for adequate lighting and ventilation.
The attachments herewith give you the rates of the remaining 6 apartments, and is at a discounted price for the first come first serve 1/6 customer.
The current Site / plot rates in bank officers layout I stage is 5000/- plus and for the remaining 1/6 customers they shall enjoy the price stability upto the end of the project which is in all likely December of 2013.
For further details / site visit / floor plans / full specs.
call on 9902029296 / 26587848, or email to sthirabuilders@gmail.com / meharnath@gmail.com
Perspective.jpg (37.07 KiB)
Rate list for Apartment
Apt cost 12_06_2013.pdf (68.77 KiB)
1. Location of the plot / house / apartment.This Apartment project is located about 0.5 km from the proposed krishnaleela park namma metro station and is 13kms from the City at No: 793, Bank officers layout, Doddakallasandra I stage, Narayananagara I block, Off Kanakapura Road, Behind GREEN HOMES super market on the main Bank officers layout to anjanapura double road, Bangalore - 62.
2. Size details - For Plots - total area and dimensions; for apartments/built houses - 8100.00 sft plot area - 100' x 81' Plot size, varying from 1742. 1850, 1906 to 3058 sft. - A seperate list is herewith attached.
3. Facing (which side the plot faces) - South facing - 40' wide Road.
4. Information about builder- STHIRA BUILDERS, J.P. Nagar 5th phase, Bangalore - 560078.
5. State if it is a BDa plot or not: - Yes it is a BDA plot.
6. Approvals - BDA approved layout, now under BBMP.
7. Price info - 3950 to 4200/- per sft for super built up area.
8. Contact info - 26587848, 9902029296, sthirabuilders@gmail.com
9. If direct seller or Broker. - Yes. Land owner, Engineer and also builder of the apartment.
10. If Broker - Not Broker
Some of the key amenities for the apartment are
1. Multipurpose community hall of approximately 70 sitting capacity in the ground floor for the 12 unit apartment only.
2. Childrens play area.
3. Schiendler brand 6 passenger lift.
4. Back up power
5. Borewell - very good source.
Highlight specifications.
1. Roof height cladding for all the bathrooms.
2. All teak wood door frames and veneered shutters.
3. 30mm thk black granite kitchen counters and solid granite sink.
4. Pooja room in all the apartments with Teak door frame and shutter.
5. Ample alround setbacks for adequate lighting and ventilation.
The attachments herewith give you the rates of the remaining 6 apartments, and is at a discounted price for the first come first serve 1/6 customer.
The current Site / plot rates in bank officers layout I stage is 5000/- plus and for the remaining 1/6 customers
For further details / site visit / floor plans / full specs.
call on 9902029296 / 26587848, or email to sthirabuilders@gmail.com / meharnath@gmail.com
Attachments
Approximate Perspective view after completionPerspective.jpg (37.07 KiB)
Rate list for Apartment
Apt cost 12_06_2013.pdf (68.77 KiB)
Forum: Misc ads
Topic: architect(7yrs xprnce with startup firm looking for projects
Dear Lakshminarayana,
My name is Rathod.
I am planning to construct the house in Gottigere. I am in dilemma whether to go with normal bricks or clay hollow bricks. following is my understanding for these two. Could you let me know which one would be better?
1. Normal bricks are load bearing. Hence house wall would be very strong where as clay bricks are non-load bearing. Wall would not be strong. And also walls will have some spaces between wall and wall beam.
2. Normal bricks are plastered. Hence life is more. Where as clay bricks are not plastered. Wear and tear seems to be more.
3. Normal bricks are plastered. This will does not catch the dust. Whereas clay bricks have small lines which would catch dust.
4. We can put screws in normal bricks wall where as not in clay bricks
5. When we go for electrical wiring, need to chisel the wall. This might damage more as it hollow.
Please let me know your view on above things.
Waiting for your reply.
Thanks !
Rathod.
My name is Rathod.
I am planning to construct the house in Gottigere. I am in dilemma whether to go with normal bricks or clay hollow bricks. following is my understanding for these two. Could you let me know which one would be better?
1. Normal bricks are load bearing. Hence house wall would be very strong where as clay bricks are non-load bearing. Wall would not be strong. And also walls will have some spaces between wall and wall beam.
2. Normal bricks are plastered. Hence life is more. Where as clay bricks are not plastered. Wear and tear seems to be more.
3. Normal bricks are plastered. This will does not catch the dust. Whereas clay bricks have small lines which would catch dust.
4. We can put screws in normal bricks wall where as not in clay bricks
5. When we go for electrical wiring, need to chisel the wall. This might damage more as it hollow.
Please let me know your view on above things.
Waiting for your reply.
Thanks !
Rathod.
Forum: Layout Reviews
Topic: Need reviews on KNS Anirvan project..
Hi,
Did you go ahead and invest in KNS Anirvan?
I too am interested in buying a plot here, but am wondering if its worth at 1750/- SQ FT. They say the project is on the proposed Peripheral ring road and is BDA approved. It is around 5 kms from Nice road and am not sure if its having an litigation/issues.
Can someone please throw some light about this project please??
Thanks!!
Did you go ahead and invest in KNS Anirvan?
I too am interested in buying a plot here, but am wondering if its worth at 1750/- SQ FT. They say the project is on the proposed Peripheral ring road and is BDA approved. It is around 5 kms from Nice road and am not sure if its having an litigation/issues.
Can someone please throw some light about this project please??
Thanks!!
Hi, I haven't yet finalised it... I am planning to get sale deed and other documents from them and make sure that there are no legal issues... if u r also interested we can go together... SMS me on 9741126822..
Thanks
Thanks
Forum: Real Estate News
Topic: Akrama Sakrama - A reader's views (From ECOPACK)
Reply: Akrama Sakrama - A reader's views (From ECOPACK)
Is it right for the Government to legalize what is essentially illegal by levying a penalty?
A few points for the the Public and the Government to consider:
1. Going by the prevailing law of the land, Akrama Sakrama is perceived to be unfair. The amendment is seen as condoning, even encouraging, illegality. However, it is a fact that lakhs of gullible people, many of them poor and perhaps unable to afford clear properties are in a lurch as a result of either their stupidity, poverty or both. Ignorance of the law is no excuse. Neither is poverty. However, it begs consideration that much of this group have bought or built on illegal land primarily to provide shelter for their families.
2. The group that is primarily guilty of grabbing or building on illegal land is the land mafia. This corrupt, black money fueled nexus of politicians, government officials (namely BDA, BBMP, DC, sub-registrars, etc), developers and real estate agents have grabbed or facilitated the appropriation of thousands of acres of government land for commercial gains.
Between the two, the gullible and poor may be charged with a lesser crime – a crime of omission. They are also the primary victims of the the land mafia. The people that make up this mafia are guilty of a graver illegality as they have not merely looted public land to profiteer, but are equally guilty of cheating the public.
3. What would be a fair way to dispense justice? Ignorance of the law is no excuse either for the foolish or the land mafia. However, we live in a welfare state in which public good is the ultimate objective, the government would do well to take a more empathetic view of the former and provide reprieve with a penalty. The land mafia, however, need to be dealt more stringent punitive measures or penalties to ensure an absolute stop to their activities. Reclaiming or demolishing such properties will affect families more than it will affect wealthy land developers. Politicians and government authorities who have colluded should be dealt equally stringent punishment to deter such illegalities from occurring.
4. Corruption and collusion apart, government organizations such as BDA, BBMP and DC are inefficient and plain ignorant. Ignorance is no excuse even as applied to the government. A few examples: The BDA notifies lands for formation of much needed sites for allotment to the public
but fails to mark or fence such areas, or even take possession, as required by law. The land, as per BDA's own rules, should be acquired within 5 years of the notification, yet many such areas remain undeveloped for 30-40 years. In the meantime, the unscrupulous form layouts and sell them to the unwitting. The BBMP knowing full well that registering these areas is illegal turns a blind eye to these transactions. Essentially, one hand of the Government doesn't know or care what the other is doing. By registering such properties, the BBMP lends a false or psuedo-legal sanctity to these illegal transactions. As we all know, the BBMP will even approve building plans in illegal revenue and BDA notified areas. This begs a question. Whose ignorance (knowing or unknowing) of the law is a greater crime? The Government's or the public's? And who should be punished for this?
5. Civic society and the public are correct to object or file a suit against the amendment. The condoning of illegal land grabbing sends the wrong signal, yet demolishing or displacing lakhs of people will come at a social cost. The lands so reclaimed run the risk of being grabbed again by the political/influential elite. Even if re-allotted to the public by fair means, it would mean depriving of one's shelter to provide shelter to someone else (as an astute Hon'ble High Court Judge pointed out).
6. The moral high-ground taken by some that justice has to be ensured on the grounds that it is unfair to those like themselves who have played by the rules is questionable. Were the BDA sites on which their homes are built allotted through due and fair process? Can they honestly say that they or their parents did not own a site in Bangalore at the time of applying for a BDA site? (a pre-condition for applying). Weren't some of the premium gated communities they live in not in the green belt before the CDP was conveniently changed to accommodate these elite communities? Were the DC conversions of these erstwhile revenue lands done without the developers greasing the DC's palms? Ignorance of any such deeds does not absolve one of being a passive participant in the subversion of the process. Indeed, at every level, however ethical, by omission or commission, most of us have benefited due the flaws in the system. Those who were not rich or influential enough to get the system on their side are the poor. Justice will be found wanting if social justice is not ensured.
http://ecopackindia.wordpress.com/2013/ ... a-sakrama/
A few points for the the Public and the Government to consider:
1. Going by the prevailing law of the land, Akrama Sakrama is perceived to be unfair. The amendment is seen as condoning, even encouraging, illegality. However, it is a fact that lakhs of gullible people, many of them poor and perhaps unable to afford clear properties are in a lurch as a result of either their stupidity, poverty or both. Ignorance of the law is no excuse. Neither is poverty. However, it begs consideration that much of this group have bought or built on illegal land primarily to provide shelter for their families.
2. The group that is primarily guilty of grabbing or building on illegal land is the land mafia. This corrupt, black money fueled nexus of politicians, government officials (namely BDA, BBMP, DC, sub-registrars, etc), developers and real estate agents have grabbed or facilitated the appropriation of thousands of acres of government land for commercial gains.
Between the two, the gullible and poor may be charged with a lesser crime – a crime of omission. They are also the primary victims of the the land mafia. The people that make up this mafia are guilty of a graver illegality as they have not merely looted public land to profiteer, but are equally guilty of cheating the public.
3. What would be a fair way to dispense justice? Ignorance of the law is no excuse either for the foolish or the land mafia. However, we live in a welfare state in which public good is the ultimate objective, the government would do well to take a more empathetic view of the former and provide reprieve with a penalty. The land mafia, however, need to be dealt more stringent punitive measures or penalties to ensure an absolute stop to their activities. Reclaiming or demolishing such properties will affect families more than it will affect wealthy land developers. Politicians and government authorities who have colluded should be dealt equally stringent punishment to deter such illegalities from occurring.
4. Corruption and collusion apart, government organizations such as BDA, BBMP and DC are inefficient and plain ignorant. Ignorance is no excuse even as applied to the government. A few examples: The BDA notifies lands for formation of much needed sites for allotment to the public
but fails to mark or fence such areas, or even take possession, as required by law. The land, as per BDA's own rules, should be acquired within 5 years of the notification, yet many such areas remain undeveloped for 30-40 years. In the meantime, the unscrupulous form layouts and sell them to the unwitting. The BBMP knowing full well that registering these areas is illegal turns a blind eye to these transactions. Essentially, one hand of the Government doesn't know or care what the other is doing. By registering such properties, the BBMP lends a false or psuedo-legal sanctity to these illegal transactions. As we all know, the BBMP will even approve building plans in illegal revenue and BDA notified areas. This begs a question. Whose ignorance (knowing or unknowing) of the law is a greater crime? The Government's or the public's? And who should be punished for this?
5. Civic society and the public are correct to object or file a suit against the amendment. The condoning of illegal land grabbing sends the wrong signal, yet demolishing or displacing lakhs of people will come at a social cost. The lands so reclaimed run the risk of being grabbed again by the political/influential elite. Even if re-allotted to the public by fair means, it would mean depriving of one's shelter to provide shelter to someone else (as an astute Hon'ble High Court Judge pointed out).
6. The moral high-ground taken by some that justice has to be ensured on the grounds that it is unfair to those like themselves who have played by the rules is questionable. Were the BDA sites on which their homes are built allotted through due and fair process? Can they honestly say that they or their parents did not own a site in Bangalore at the time of applying for a BDA site? (a pre-condition for applying). Weren't some of the premium gated communities they live in not in the green belt before the CDP was conveniently changed to accommodate these elite communities? Were the DC conversions of these erstwhile revenue lands done without the developers greasing the DC's palms? Ignorance of any such deeds does not absolve one of being a passive participant in the subversion of the process. Indeed, at every level, however ethical, by omission or commission, most of us have benefited due the flaws in the system. Those who were not rich or influential enough to get the system on their side are the poor. Justice will be found wanting if social justice is not ensured.
http://ecopackindia.wordpress.com/2013/ ... a-sakrama/
Your digest options:
Basics Options:
Digest Frequency: Weekly
Digest Format: HTML
Hour sent: 15.5
Forums Selection Options:
Types of posts in digest: All posts
Post Filters Options:
Maximum number of posts in the digest: No limit
Minimum words required in post for the post to appear in a digest: No constraint
Show new posts only: No
Remove my posts: Yes
Remove posts from my foes: No
Show my private messages: Yes
Additional Criteria Options:
Post sort order: Use my board display preferences
Maximum words to display in a post: No limit
Send digest if no new messages: No
Reset my last visit date when I am sent a digest: Yes
Show attachments: Yes
Block images: No
Table of contents: Yes
The digest was published specifically for you on 19 Jun 2013, 15:30
This digest is being sent to registered members of myBDAsites.com forums. You can change or delete your subscription from the User Control Panel. If you have questions or feedback on the format of this digest please send it to the myBDAsites.com Webmaster.
Powered by phpBB Digests 2.2.21
No comments:
Post a Comment